contract- RECIPIENT AWARD SUMMARY

PINE BLUFF SAND AND GRAVEL COMPANY

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: JEFFERSON
Award Number: W912HY09C0031 Project Location - State: TX
Funding Amount: $3,954,500 Project Location - Zip Code: 776406834
Ending Date: 2011-04-30 Congressional District: 02

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: PINE BLUFF SAND AND GRAVEL COMPANY
Recipient Address: 1501 PORT RD
Recipient City: WHITE HALL
Recipient State: AR
Recipient Zip Code: 716024705
Congressional District: AR-04

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3135::TAS SNWW, DREDGING NECHES RIVER CHANNEL






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $3,954,500
Award Description: TAS::96 3135::TAS SNWW, DREDGING NECHES RIVER CHANNEL
Amount: $416,999
Award Description: TAS::96 3135::TAS B4R0500 RED RIVER DREDGING ARRA::YES::ARRA
Amount: $1,488,987
Award Description: TAS::96 3135::TAS B4R0500 DREDGING ON RED RIVER
Amount: $0
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0007 TO# 2::RP# BENDWAY WEIR CONSTRUCTION AT REVERIE, TIPTON COUNTY, TENNESSEE, MISSISSIPPI RIVER MILE 767.0R AHP TO 765.5R AHP. THIS MODIFICATION SERVES TO REPLACE EXISTING CONTRACT DRAWINGS WITH REVISED CONTRACT DRAWINGS WHICH REFLECT THE SURVEY CONTROL DATA FOR EACH WEIR. THERE IS NO QUANTITY CHANGE ASSOCIATED WITH THIS MODIFICATION.
Amount: $0
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0007::TO# 2 DIKE CONSTRUCTION AT REVERIE BENDWAY WEIRS MISSISSIPPI RIVER MILE 767R AHP): THE TASK ORDER IS FOR BENDWAY WEIR CONSTRUCTION AT REVERIE, TIPTON COUNTY, TENNESSEE, MISSISSIPPI RIVER MILES 767.0R AHP TO 765.5R AHP. THIS MODIFICATION SERVES TO REPLACE EXISTING TASK ORDER DRAWINGS WITH REVISED DRAWINGS WHICH REFLECT RECENTLY CHANGED SITE CONDITIONS AT THE PROPOSED BENDWAY WEIR LOCATIONS. THERE IS NO QUANTITY CHANGE ASSOCIATED WITH THIS MODIFICATION. THIS CHANGE IS REFERRED TO AS CA003.
Amount: $723,575
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0007::TO# 2 DIKE CONSTRUCTION AT REVERIE BENDWAY WEIRS MISSISSIPPI RIVER MILE 767R AHP): THE TASK ORDER IS FOR BENDWAY WEIR CONSTRUCTION
Amount: $3,018,375
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::107046::RP# REVERIE BENDWAY WEIR THE WORK CONSIST OF FURNISHING ALL PLANT, LABOR AND MATERIALS FOR CONSTRUCTING REVERIE BENDWAY WEIR NOS, 1-12 BY PLACING GRADED STONE A AS WELL AS INCIDENTAL RELATED WORK.
Amount: $0
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0007::TO# 2 BENDWAY WEIR CONSTRUCTION AT REVERIE, TIPTON COUNTY, TENNESSEE, MISSISSIPPI RIVER MILES 767.0R AHP TO 765.5R AHP. THIS MODIFICATION SERVES TO REPLACE EXISTING CONTRACT DRAWINGS WITH REVISED CONTRACT DRAWINGS WHICH REFLECT RECENTLY CHANGED SITE CONDITIONS AT THE PROPOSED WEIR LOCATIONS. THERE IS NO QUANTITY CHANGE ASSOCIATED WITH THIS MODIFICATION. THIS CHANGE IS REFERRED TO AS CA002.
Amount: $23,000
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE PROJECT IS FOR ASHPORT-GOLDUST AND FORKED DEER DIKES, MISSISSIPPI RIVER MILE 797.0R AHP TO 796.0L AHP. THIS MODIFICATION SERVES TO REVISE THE DESIGN ELEVATIONS AND PROFILES FOR FORKED DEER DIKE 6 AND 6T AND ASHPORT-GOLDDUST DIKE 1U BASED ON CHANGED RIVER CONDITIONS AT THE PROJECT LOCATION. THIS CHANGE IS REFERRED TO AS CA002.
Amount: -$23,012
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# PROJECT 107046 IS FOR ASHPORT-GOLDUST AND FORKED DEER DIKES, LAUDERDALE COUNTY, TN, MISSISSIPPI RIVER MILES 797.0R AHP TO 796.0L AHP. THIS MODIFICATION IS TO REVISE THE ESTIMATED QUANTITIES TO REFLECT THE BEST ESTIMATE OF ACTUAL QUANTITIES TO BE USED. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. THIS ACTION WILL FULLY OBLIGATE THIS CONTRACT.
Amount: $0
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0007 TO# 1::RP# STONE DIKE CONSTRUCTION AT ASHPORT-GOLDUST AND FORKED DEER DIKES, LAUDERDALE COUNTY, TENNESSEE, MISSISSIPPI RIVER MILE 797.0R AHP TO 796.0L AHP. THIS MODIFICATION SERVES TO REPLACE EXISTING CONTRACT DRAWINGS WITH REVISED CONTRACT DRAWINGS WHICH REFLECT THE SURVEY CONTROL DATA REQUIRED. THERE IS NO QUANTITY CHANGE ASSOCIATED WITH THIS MODIFICATION. THIS CHANGE IS REFERRED TO AS CA001.
Amount: $2,100,110
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::107046::RP# THE WORK CONSIST OF FURNISHING ALL PLANT, LABOR, MATERIALS AND EQUIPMENT FOR THE CONSTRUCTION OF VARIOUS TYPES OF STONE NAVIGATION STRUCTURES TO INCLUDE VARIOUS TYPES OF DIKES, CHEVRONS, BENDWAY WEIRS AND HARDPOINTS IN THE MISSISSIPPI RIVER WITHIN THE BOUNDARIES OF THE MEMPHIS AND VICKSBURG DISTRICTS.
Amount: -$1,856
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::107169000065::RP# B4R0500 RED RIVER DREDGING ARRA::YES::ARRA
Amount: $360,000
Award Description: TAS::96 3135::TAS RECOVERY ARRA- DREDGING SNWW, LOWER AND MIDDLE REACH NECHES RIVER IN JEFFERSON AND ORANGE COUNTIES, TEXAS
Amount: -$8,547
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE TASK ORDER IS FOR DIKE CONSTRUCTION AT REVERIE BENDWAY WEIRS, REVERIE, TIPTON COUNTY, TN, MISSISSIPPI RIVER MILE 767R AHP. THIS MODIFICATION IS TO REVISE ESTIMATED QUANTITIES TO REFLECT FINAL QUANTITY AMOUNTS.
Amount: $0
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE TASK ORDER IS FOR REVERIE BENDWAY WEIRS, REVERIE, TIPTON COUNTY, TENNESSEE, MS RIVER MILES 767.0R AHP TO 765.5R AHP. THIS MODIFICATION IS TO PROVIDE A TIME EXTENSION FOR DELAYS IN COMPLETING THE WORK ARISING FROM UNFORESEEABLE CAUSES BEYOND THE CONTROL AND WITHOUT THE FAULT OR NEGLIGENCE OF THE CONTRACTOR. THIS MODIFICATION COVERS THE PERIOD BETWEEN JULY 2, 2010 AND OCTOBER 7, 2010, INCLUSIVE. THE FINDINGS OF FACT WARRANT THAT THE TIME FOR COMPLETING THE WORK SHALL BE EXTENDED BY 53 CALENDAR DAYS DUE TO HIGH RIVER STAGES (ABOVE +13 FT ON THE MEMPHIS GAGE). THE NEW DATE ESTABLISHED FOR COMPLETION OF THE CONTRACT WORK IS OCTOBER 7, 2010.
Amount: -$3,004
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE TASK ORDER IS FOR STONE DIKE CONSTRUCTION AT ASHPORT-GOLDUST AND FORKED DEER DIKES, LAUDERDALE COUNTY, TENNESSEE, MISSISSIPPI RIVER MILE 797.0R AHP TO 796.0L AHP. THIS MODIFICATION IS TO REVISE THE TASK ORDER QUANTITIES TO REFLECT ACTUAL QUANTITIES USED. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. THIS ACTION WILL FULLY OBLIGATE THIS CONTRACT. THIS CHANGE IS REFERRED TO AS CA005.
Amount: $370,000
Award Description: SNWW, DREDGING LOWER AND MIDDLE REACHES NECHES RIVER IN JEFFERSON AND ORANGE COUNTIES, TEXAS VARIATION IN QUANTITY CLIN 013
Amount: $0
Award Description: DREDGING SNWW, LOWER AND MIDDLE REACH NECHES RIVER IN JEFFERSON AND ORANGE COUNTIES, TEXAS, 13 DAY TIME EXTENSION

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 02
City JEFFERSON
County JEFFERSON
State TX