contract- RECIPIENT AWARD SUMMARY

THE LOUIS BERGER GROUP, INC

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: DISTRICT OF COLUMBIA
Award Number: 0028 Project Location - State: DC
Funding Amount: $747,965 Project Location - Zip Code: 200371435
Ending Date: 2010-04-02 Congressional District: 00

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: THE LOUIS BERGER GROUP, INC
Recipient Address: 2445 M ST NW
Recipient City: WASHINGTON
Recipient State: DC
Recipient Zip Code: 200371122
Congressional District: DC-00

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3135::TAS RECOVERY PROJECT#::324677::RP# ECONOMIC MODELING FOR ESTIMATING JOBS AND OTHER ECONOMIC IMPACTS OF CORPS OF ENGINEERS ECONOMIC STIMULUS SPENDING ON NATIONAL AND REGIONAL ECONOMIES TO ENSURE THE US ARMY CORPS OF ENGINEERS PROVIDE ACCURATE AND DEFENDABLE ESTIMATES OF LOCAL JOB CREATION AND OTHER ECONOMIC MEASURES SUCH AS INCOME AND SLES AS MEANS TO DOCUMENT AND MANAGE THE PERFORMANCE OF THE ARRA SPENDING AND ASSOCIATED CIVIL WORK PROGRAM ACTIVITIES.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $777,442
Award Description: TAS::14 1041::TAS RECOVERY BITH 148162A BLCA 148195A CHIR 151082A FOBO 1510720A GLAC 150720A GLCA 1526238 GRCA 148322A GRSA 137342A ORPI 152534A SAGU 151767A SAGU 151771A SAGU 7762C SAGU 151769A SAGU 60131A SAGU 151770A THE WORK PERFORMED SHALL INCLUDE THE PREPARATION AND COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PROCESS FOR UP TO THREE (3) ENVIRONMENTAL ASSESSMENTS (EAS) TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS (AMLS) IN 6 UNITS WITHIN THE INTERMOUNTAIN REGION OF THE NATIONAL PARK SERVICE, AND ONE (1) CERCLA RESPONSE ACTION FOR THE OLD YUMA MINE AT SAGUARO NATIONAL PARK.
Amount: $183,930
Award Description: TAS::14 1041::TAS RECOVERY GOIS PMIS #152710/154316 - HAZMAT ABATEMENT AND STRUCTURAL STABILIZATION OF CASTLE WILLIAMS, CONSTRUCTION MANAGEMENT SERVICES, GOVERNORS ISLAND NATIONAL MONUMENT, GOIS-152710/154316, NEW YORK CITY COUNTY, NY. THIS CALL ORDER SHALL CONSIST OF ON-SITE INSPECTION, SPECIAL INSPECTIONS, ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS. THE CM FIRM SHALL PROVIDE A PART TIME, 32 HOURS PER WEEK. THE CMR SHALL BE COMPUTER LITERATE, KNOWLEDGEABLE IN CONSTRUCTION PRACTICES INCLUDING APPLICABLE BUILDING CODES, COST BREAKDOWN ESTIMATING AND NEGOTIATING, AND TECHNICAL WRITING. INDIVIDUAL SHALL HAVE SUFFICIENT COMPUTER OPERATING SKILLS TO BE ABLE TO OPEN AND MANIPULATE PRIMAVERA PROJECT PLANNER (P3) SCHEDULES AND BE PROFICIENT IN MICROSOFT WORD, EXCEL, AND PROJECT. THE CMR MUST ALSO BE ABLE TO ACCESS AND UTILIZE THE INTERNET FOR THE TRANSMISSION OF DIGITAL PROGRESS PHOTOS AND ADMINISTRATIVE COMMUNICATIONS.
Amount: $309,275
Award Description: TAS::14 1041::TAS RECOVERY PEVI 022794- CONSTRUCTION MANAGEMENT SERVICES FOR PERRY'S VICTORY AND INTERNATIONAL PEACE MEMORIAL (PEVI). THESE SERVICES WILL PROVIDE CONSTRUCTION OVERSIGHT WHILE THE TOWER AT PEVI IS UNDER RECONSTRUCTION.
Amount: $43,108
Award Description: TAS::14 1041::TAS RECOVERY THIS WORK CONSISTS OF THE PREPARATION OF THE REQUEST FOR PROPOSAL (RFP) FOR DESIGN-BUILD SERVICES, THE PREPARATION OF AN UPDATED CLASS B COST ESTIMATE, THE PREPARATION OF THE CONTRACT PRICE SCHEDULE FOR DESIGN-BUILD AND THE PREPARATION OF THE CONSTRUCTABILITY ANALYSIS UTILIZING THE DESIGN BUILD CONSTRUCTABILITY CHECKLIST FOR THE PROJECT STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE, STEA-020234
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY (ADMINISTRATIVE MODIFICATION 0001 TO CORRECT FUNDING STRIP ONLY; ALL OTHER TERMS AND CONDITIONS OF THE TASK ORDER REMAIN UNCHANGED.) - PROVIDE COMPLIANCE SERVICES FOR GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $118,297
Award Description: TAS::14 1041::TAS RECOVERY PROVIDE COMPLIANCE SERVICES FOR GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $21,239
Award Description: TAS::14 1041::TAS RECOVERY ADD SUPPLEMENTAL SERVICES (PERMIT PLAN REPORT, LAND OWNERSHIP MAP, AND ENERGY AUDIT AND REPORT) TO ORIGINAL TASK ORDER TO PROVIDE COMPLIANCE SERVICES FOR GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $69,030
Award Description: TAS::14 1041::TAS RECOVERY BISO PMIS # 152731 - ENVIRONMENTAL ASSESSMENT AND WETLAND DELINEATION TO CLOSE 53 HAZARDOUS ABANDONED OIL AND GAS WELLS IN BIG SOUTH FORK NATIONAL RIVER AND RECREATIONAL AREA - PMIS NO. 152731.
Amount: $0
Award Description: RECOVERY, TAS::69 0504::TAS, NON-PERSONAL, PROFESSIONAL PROGRAM AND ENVIRONMENTAL SUPPORT SERVICES. ARRA::YES::ARRA
Amount: $747,965
Award Description: TAS::96 3135::TAS RECOVERY PROJECT#::324677::RP# ECONOMIC MODELING FOR ESTIMATING JOBS AND OTHER ECONOMIC IMPACTS OF CORPS OF ENGINEERS ECONOMIC STIMULUS SPENDING ON NATIONAL AND REGIONAL ECONOMIES TO ENSURE THE US ARMY CORPS OF ENGINEERS PROVIDE ACCURATE AND DEFENDABLE ESTIMATES OF LOCAL JOB CREATION AND OTHER ECONOMIC MEASURES SUCH AS INCOME AND SLES AS MEANS TO DOCUMENT AND MANAGE THE PERFORMANCE OF THE ARRA SPENDING AND ASSOCIATED CIVIL WORK PROGRAM ACTIVITIES.
Amount: $201,560
Award Description: PREPARATION OF GENERAL MANAGEMENT PLAN AND ENVIRONMENTAL IMPACT STATMENT, BADLANDS NATIONAL PARK, SOUTH UNIT, INTERIOR, SOUTH DAKOTA
Amount: $44,863
Award Description: CHOH ARCHEOLOGICAL ID & EVALUATION
Amount: $18,570
Award Description: PHASE 1 SURVEY OF PROPOSED CHOPAWAMSIC ENTRANCE SITE
Amount: $1,349,380
Award Description: RECOVERY NAMA PMIS #150274 CONSTRUCTION MANAGEMENT SERVICES, REHABILITATION OF LINCOLN MEMORIAL REFLECTING POOL AND GROUNDS, NATIONAL MALL AND MEMORIAL PARKS, WASHINGTON DC
Amount: $37,961
Award Description: RECOVERY HAVO PMIS# 121844 MOD 1 IS TO INCREASE CM SERVICES FROM PART-TIME TO FULL-TIME FROM 7/5/10 THROUGH 12/15/2010.
Amount: $243,514
Award Description: TAS::14 1041::TAS RECOVERY HAVO PMIS# 121844 THIS CALL ORDER SHALL CONSIST OF ON-SITE INSPECTION, SPECIAL INSPECTIONS, ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, COMMISSIONING SERVICES, AND SITE VISITS. ALL WORK SHALL BE PERFORMED UNDER A SINGLE CONTRACT.
Amount: $105,639
Award Description: TAS::14 1041:: TAS RECOVERY VAFO PMIS #152410 VALLEY FORGE NATIONAL HISTORICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA ON-SITE INSPECTION AND ADMINISTRATION OF THREE CONSTRUCTION CONTRACTS AND OFFICE SERVICES.
Amount: $668,533
Award Description: RECOVERY NAMA PMIS #150274 A/E TITLE III SERVICES TO INCLUDE SUBMITTAL REVIEW, OFFICE SERVICES, AND SITE VISITS, REHABILITATION OF LINCOLN MEMORIAL REFLECTING POOL AND GROUNDS, NATIONAL MALL AND MEMORIAL PARKS, WASHINGTON DC
Amount: $27,293
Award Description: RECOVERY JEFF PMIS# 007895 JEFFERSON NATIONAL EXPANSION MEMORIAL; REPLACE OLD COURTHOUSE ROOF; CONSTRUCTION MANAGEMENT SERVICES. EXTEND THE POP AND PROVIDE AN EQUITIBLE ADJUSTMENT.
Amount: $78,805
Award Description: TAS::14 1041::TAS RECOVERY STEA PMIS #20234 THIS CALL ORDER SHALL CONSIST OF GENERAL ON-SITE INSPECTION, COORDINATION OF ASBESTOS MONITORING AND INSPECTION SERVICES WITH THE ASBESTOS PROJECT MONITOR CONSULTANT (APM), ADMINISTRATION OF THE DESIGN-BUILD CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS FOR THE STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS AT STEAMTOWN NATIONAL HISTORIC SITE, PENNSYLVANIA BY THE CONSTRUCTION MANAGEMENT REPRESENTATIVE (CMR). THE ROLE OF THE CMR IS TO INSPECT THE GENERAL WORK OF THE CONSTRUCTION CONTRACTOR INCLUDING ASBESTOS ABATEMENT PROGRESS, WORKMANSHIP AND CONFORMANCE WITH THE CONTRACT DOCUMENTS AND EXISTING CODES, AND TO COORDINATE WITH THE APM IN REGARD TO ONGOING ASBESTOS MONITORING, TESTING AND INSPECTION.
Amount: $48,603
Award Description: RECOVERY STEA 20234 CONSTRUCTION MANAGEMENT SERVICES, STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE. THIS MODIFICATION ADDS FUNDING FOR ADDITIONAL HOURS TO PERFORM ON-SITE CONSTRUCTION INSPECTION, OFFICE SERVICES AND SITE VISITS.
Amount: $9,934
Award Description: TAS::14 1041::TAS RECOVERY INDE PMIS# 028059 CLASS A CONSTRUCTION COST ESTIMATE, REHABILITATE INDEPENDEDNCE HALL TOWER, PHILADELPHIA, PENNSYLVANIA, INDE 028059
Amount: $332,980
Award Description: RECOVERY STLI 152408 - CONSTRUCTION MANAGEMENT SERVICES DURING CONSTRUCTION; STABILIZATION OF THE BAGGAGE AND DORMITORY BUILDING AT ELLIS ISLAND
Amount: $207,834
Award Description: TAS::14 1041::TAS RECOVERY NAMA PMIS # 150359 CONSTRUCTION MANAGEMENT SERVICES FOR "RESTORE THE DISTRICT OF COLUMBIA WAR MEMORIAL", NATIONAL MALL AND MEMORIAL PARKS, WASHINGTON, DC
Amount: $146,046
Award Description: RECOVERY JELA 146423 CONSTRUCTION MANAGEMENT SERVICES FOR RESTORATION OF CANALS WITHIN THE BARATARIA PRESERVE, JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE, MARRERO, LOUISIANA. SERVICES INCLUDE FULL TIME ON-SITE INSPECTION, PREPARING INSPECTION REPORTS, WEEKLY PROGRESS MEETINGS, SUBMITTAL REVIEW, AND OFFICE SERVICES.
Amount: $38,168
Award Description: PMIS NO. 135124 PROVIDE A COMBINED PHASE I, II AND POSSIBLY III, ARCHEOLOGICAL INVESTIGATION AT PETERSEN HOUSE, FORD'S THEATRE NATIONAL HISTORIC SITE (FOTH), PMIS 135124, TO FULFILL THE REQUIREMENTS OF SECTION 106 OF THE 1966 NATIONAL HISTORIC PRESERVATION ACT, AS AMENDED. THE PURPOSE OF THE ARCHEOLOGY IS TO ENABLE THE NATIONAL PARK SERVICE (NPS) TO DETERMINE WHETHER UNDERTAKING PROPOSED DRAINAGE IMPROVEMENTS WILL AFFECT ARCHEOLOGICAL RESOURCES LOCATED IN THE AREA OF POTENTIAL EFFECT (APE). IF SIGNIFICANT ARCHEOLOGICAL RESOURCES ARE IDENTIFIED IN THE PHASE IB / II WORK, MITIGATION OF ADVERSE EFFECTS WILL BE COMPLETED BY ARCHEOLOGICAL DATA RECOVERY (PHASE III) PENDING A TASK ORDER MODIFICATION. WORK SHALL BE IN ACCORDANCE WITH NPS SOW DATED 3/1/10 AND LOUIS BERGER GROUP PROPOSAL DATED 3/4/10. COMMENCE WORK ON OR ABOUT 3/15/10 AND COMPLETE ALL TASKS BY 9/30/10.
Amount: $0
Award Description: NO COST MODIFICATION TO EXTEND PERFORMANCE PERIOD
Amount: $4,676
Award Description: TAS::14 1041::TAS RECOVERY, JELA 138805 MODIFICATION NO. 0002 TO ADD AIR BOAT TIME AND FUNDING TO COMPLETE TOPOGRAPHIC SUREVY IN AREAS NOT ACCESSIBLE BY OUTBOARD MOTOR BOAT.
Amount: $0
Award Description: ENVIRONMENTAL ASSESSMENT AND TOPOGRAPHIC SURVEYING AND MAPPING TO RESTORE CANALS TO THEIR NATURAL LANDSCAPE, GRSM 138805, NO COST TIME EXTENSION
Amount: $34,955
Award Description: TAS::14 1041::TAS-RECOVERY, MOJA 129933, DEVA 139752, 148432, 148500, 150024, MORA 148222, WHIS 150392, OLYM 148535, JOTR 148438, LAME 149859, 149873, AND PARA 153406. DEVELOP CONSTRUCTION DOCUMENTS
Amount: $518,485
Award Description: RECOVERY STLI PMIS #152319 CONSTRUCTION MANAGEMENT SERVICES STABILIZE ELLIS ISLAND SEAWALL, STATUE OF LIBERTY NATIONAL MONUMENT
Amount: $137,875
Award Description: RECOVERY STLI PMIS #106096 CONSTRUCTION MANAGMENT SERVICES "INSTALL POWER AND COMMUNICATION LINES" STATUE OF LIBERTY NATIONAL MONUMENT THE SELECTED FIRM WILL PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE PROJECT +INSTALL POWER AND COMMUNICATION LINES+ AT STATUE OF LIBERTY NATIONAL MONUMENT LOCATED IN HUDSON COUNTY, NEW JERSEY, AND NEW YORK COUNTY, NEW YORK. CONSTRUCTION MANAGEMENT SERVICES WILL INCLUDE ON-SITE CONSTRUCTION INSPECTION, OFFICE SERVICES, AND SITE VISITS.
Amount: $0
Award Description: RECOVERY CHOH PMIS#125585 CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK "CATOCTIN AQUEDUCT REHABILITATION" CONSTRUCTION MANAGEMENT SERVICES THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR MADE DURING THE CALL ORDER AWARD.
Amount: $229,913
Award Description: RECOVERY CHOH PMIS#125585 CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK "CATOCTIN AQUEDUCT REHABILITATION" CONSTRUCTION MANAGEMENT SERVICES THE SELECTED FIRM WILL PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE PROJECT "CATOCTIN AQUEDUCT REHABILITATION" AT CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK LOCATED IN LANDER, MARYLAND. CONSTRUCTION MANAGEMENT SERIVICES WILL INCLUDE ON-SITE CONSTRUCTION INSPECTION, OFFICE SERVICES, AND SITE VISITS.
Amount: $166,743
Award Description: TAS::14 1041:: TAS RECOVERY ACAD PMIS# 151121&152170. THE NPS IS REHABILITATING OVER 100 EXISTING CULVERTS AND HEADWALLS ALONG THE HISTORIC MOTOR ROAD SYSTEM THROUGH ACAD. THE WORK INCLUDES STONE MASONRY, DRY LAID STONE, AND CONCRETE HEADWALLS, CULVERT REPAIR OR REPLACEMENT OR RESTORATION IN PLACE, INLET / OUTLET RESTORATION, VEGETATION REMOVAL, UPSTREAM AND DOWNSTREAM DITCH REPAIR, AND PAVEMENT REPAIR. IN ADDITION, APPROXIMATELY 37 ROUTES WITHIN THE PARK ARE SCHEDULED FOR PAVEMENT REHABILITATION.
Amount: $6,726
Award Description: RECOVERY ACAD 1511121/150170 CM SERVICES
Amount: $304,106
Award Description: TAS::14 1041::TAS RECOVERY SHEN-150592, 150521, 150532, 151860 CONSTRUCTION MANAGEMENT SERVICES FOR MULTIPLE ROAD REHABILITATION PROJECTS AT SHENANDOAH NATIONAL PARK, LURAY, VIRGINIA. SERVICES INCLUDE ON-SITE INSPECTION, SPECIAL INSPECTIONS AND ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS.
Amount: $54,784
Award Description: TAS::14 1041::TAS RECOVERY SHEN 156024 EXERCISE THE PRICED OPTION FOR PROJECT NO. 6, ROAD REHABILITATION PHASE 5, SHEN-156024
Amount: $113,227
Award Description: RECOVERY SHEN-151200, 156025 CONSTRUCTION MANAGEMENT SERVICES FOR MULTIPLE ROAD REHABILITATION PROJECTS AT SHENANDOAH NATIONAL PARK, VIRGINIA. MOD 2 IS TO AWARD PRICED OPTIONS FOR PROJECT NOS. 7 AND 8, ROAD REHABILITATION PHASES 6 AND 7, RESPECTIVELY.
Amount: $36,137
Award Description: RECOVERY SHEN-151200 CM SERVICES FOR MULTIPLE ROAD REHABILITATION PROJECTS WITHIN SHENANDOAH NATIONAL PARK, VIRGINIA MOD 3: TO INCORPORATE OTHER DIRECT COSTS MISTAKENLY OMITTED FROM THE BASE CALL ORDER AWARD.
Amount: $133,215
Award Description: TAS::14 1041::TAS RECOVERY BITH 148162A BLCA 148195A CHIR 151082A FOBO 1510720A GLAC 150720A GLCA 1526238 GRCA 148322A GRSA 137342A ORPI 152534A SAGU 151767A SAGU 151771A SAGU 7762C SAGU 151769A SAGU 60131A SAGU 151770A THE WORK PERFORMED SHALL INCLUDE THE PREPARATION AND COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PROCESS FOR UP TO THREE (3) ENVIRONMENTAL ASSESSMENTS (EAS) TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS (AMLS) IN 6 UNITS WITHIN THE INTERMOUNTAIN REGION OF THE NATIONAL PARK SERVICE, AND ONE (1) CERCLA RESPONSE ACTION FOR THE OLD YUMA MINE AT SAGUARO NATIONAL PARK.
Amount: $0
Award Description: NO COST MODIFICATION TO REALLOCATE FUNDING TO SOIL SAMPLING AS A RESULT OF PRIVATE LAND OWNER CONCERNS.
Amount: $65,166
Award Description: MODIFICATION ISSUED TO ADD FUNDING BACK IN FOR THE GROUND WATER WELL WHICH WAS REDIRECTED IN MODIFICATION 0003 FOR ADDITIONAL COSTS ASSOCIATED WITH SOIL SAMPLING AS A RESULT OF PRIVATE LAND OWNER CONCERNS.
Amount: $249,483
Award Description: TAS::14 1041::TAS RECOVERY BITH 148162A BLCA 148195A CHIR 151082A FOBO 1510720A GLAC 150720A GLCA 1526238 GRCA 148322A GRSA 137342A ORPI 152534A SAGU 151767A SAGU 151771A SAGU 7762C SAGU 151769A SAGU 60131A SAGU 151770A THE WORK PERFORMED SHALL INCLUDE THE PREPARATION AND COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PROCESS FOR UP TO THREE (3) ENVIRONMENTAL ASSESSMENTS (EAS) TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFETY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINE LANDS (AMLS) IN 6 UNITS WITHIN THE INTERMOUNTAIN REGION OF THE NATIONAL PARK SERVICE, AND ONE (1) CERCLA RESPONSE ACTION FOR THE OLD YUMA MINE AT SAGUARO NATIONAL PARK.
Amount: $193,351
Award Description: TAS::14 1041::TAS RECOVERY NAMA 150274 WORK CONSISTS OF SUPPLEMENTAL GEOTECHNICAL INVESTIGATION, AND ADD MULTIPLE DESIGN TASKS ASSOCIATED WITH THE OVERALL DESIGN OF THE PROJECT.
Amount: $1,804,056
Award Description: TAS::14 1041::TAS RECOVERY NAMA PMIS# 150274 DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT SERVICES, REHABILITATE THE LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING AREA, WASHINGTON DC. NAMA 150274 CONTRACTOR TO PROVIDE DESIGN SERVICES FOR THE REPLACEMENT OF THE REFLECTING POOL, LANDSCAPING OF SURROUNDING GROUNDS, AND ENHANCED SECURITY MEASURES.
Amount: $58,646
Award Description: RECOVERY - NAMA-150274 - ADDITIONAL TESTING FOR DESIGN OF THE REHABILITATE THE LINCOLN REFLECTING POOL
Amount: $0
Award Description: RECOVERY - NAMA-150274 - ADDITIONAL TIME REQUIRED FOR TESTING DURING DESIGN OF THE REHABILITATE THE LINCOLN REFLECTING POOL
Amount: $64,904
Award Description: RECOVERY STEA 20234 ASBESTOS INSPECTION MONITORING AND AIR SAMPLING SERVICES DURING ASBESTOS ABATEMENT. THIS MODIFICATION ADDS FUNDING FOR ADDITIONAL A/E INSPECTION SERVICES.
Amount: $0
Award Description: RECOVERY BISO PMIS # 152731 PROFESSION SERVICES FOR DEVELOPMENT OF AN ENVIRONMENTAL ASSESSMENT. NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO 4-3-2010.
Amount: $141,995
Award Description: TAS::14 1041::TAS RECOVERY STEA PMIS#20234 THIS TASK ORDER CONSISTS OF ASBESTOS INSPECTION MONITORING AND AIR SAMPLING SERVICES DURING ASBESTOS ABATEMENT; LIMITED OFFICE SERVICES, AND SITE VISITS FOR THE STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS AT STEAMTOWN NATIONAL HISTORIC SITE, PENNSYLVANIA. DUTIES INCLUDE: A) INSPECTION REPORTS SHALL BE TRANSMITTED VIA E-MAIL TO THE COR AND THE PARK ON A WEEKLY BASIS (BY THE END OF EACH WEEK). WEEKLY FIELD REPORT SHALL INCLUDE THE FOLLOWING: THE AMOUNTS AND TYPES OF ASBESTOS WORK COMPLETED THROUGH THE END OF THE REPORT WEEK; AND DOCUMENTATION OF CONTROVERSIAL ISSUES ENCOUNTERED/PROBLEM EXPERIENCED BY OR WITH THE CONSTRUCTION CONTRACTOR. THE REPORT MAY BE IN GENERAL AND ABBREVIATED TERMS. B) THE APM SHALL PARTICIPATE IN WEEKLY TELEPHONE CONFERENCE CALLS WITH THE CONTRACTOR+S PROJECT SUPERINTENDENT, CMR, COR, PARK AND OTHER PARTIES AS NECESSARY. THE PURPOSE OF THESE CALLS IS TO UPDATE THE COR AND OTHER PROJECT TEAM MEMBERS ON THE WORK PROGRESS, ADDRESS OUTSTANDING PROJECT ISSUES AND COORDINATE UPCOMING WORK ACTIVITIES. THESE CONFERENCE CALLS ARE TYPICALLY NO LONGER THAN 1-HOUR DURATION. C) THE APM WILL BE ASKED TO PROVIDE TECHNICAL ASSISTANCE AND SUPPORT TO THE COR DURING ABATEMENT ACTIVITIES, COORDINATION WITH THE GOVERNMENT+S CMR, INCLUDING BUT NOT LIMITED TO: + REVIEW, LOG, AND COMMENT UPON HASP SUBMITTALS. + SUPPORT COR IN DRAFTING REQUEST FOR PROPOSALS (RFPS) THAT DEFINE ASBESTOS RELATED WORK TO BE PERFORMED AND CITE RELEVANT HASP SPECIFICATION SECTIONS. + PREPARE GOVERNMENT COST ESTIMATES WITH BREAKDOWN OF LABOR, MATERIALS AND EQUIPMENT COSTS (TO BE SUBMITTED TO COR ONE WEEK AFTER RFP IS ISSUED). + WITH CMR, ASSIST IN RESOLUTION AND FOLLOW UP ON REQUESTS FOR INFORMATION (RFIS). + REVIEW CONTRACTOR QUALITY CONTROL (QC) DAILY REPORTS FOR ACCURACY AND COMPLETENESS + COMPLETE A DAILY DIARY FOR EACH DAY YOU ARE ON SITE. AT THE END OF EACH WEEK SEND ALL DAILY DIARIES TO THE COR. + TAKE APPROPRIATE PHOTOGRAPHS THAT DOCUMENT ABATEMENT PROGRESS AND PROBLEMS, SUCH AS CAPTURING ITEMS THAT WILL NOT BE SEEN LATER, ETC. SEND A MINIMUM OF FIVE (5) DIGITAL PHOTOGRAPHS ON A WEEKLY BASIS OF EACH WORK ACTIVITY TO THE COR VIA E-MAIL IN AN APPROVED FORMAT. + ASSIST THE CMR IN RESOLVING DISPUTES THAT MAY ARISE DUE TO THE INTERACTION BETWEEN THE CONSTRUCTION CONTRACTOR AND THE PARK STAFF. + ASSIST THE CMR IN REVIEW AND DOCUMENTATION OF ANY CONTRACTOR(S) CLAIMS FOR ADDITIONAL COST AND/OR TIME. + PROVIDE INSPECTION DEFICIENCY LIST TO COR. CONDUCT INSPECTIONS AND DRAFT RELATED DEFICIENCY LETTERS FOR THE CONTRACTING OFFICER+S REPRESENTATIVE+S REVIEW AND SUBSEQUENT CONCURRENCE AND SIGNATURE BY THE CONTRACTING OFFICER + VERIFY ALL REQUIRED HASP CLOSE OUT REQUIREMENTS ARE COMPLETE AND IN COMPLIANCE WITH THE CONTRACT DOCUMENTS.
Amount: $122,442
Award Description: RECOVERY-WHITE RIVER TRAVEL MANAGMENT PLAN REVISED/DE-SCOPED TAS::14 1108::TAS
Amount: $38,971
Award Description: OPDAT REQUIREMENT
Amount: $597,272
Award Description: TAS:: 96 4902:: TAS NORFOLK HARBOR SEDIMENT TESTING
Amount: $652,834
Award Description: TAS::96 3135::TAS RECOVERY PROJECT#::324677::RP# ECONOMIC MODELING FOR ESTIMATING JOBS AND OTHER ECONOMIC IMPACTS OF CORPS OF ENGINEERS ECONOMIC STIMULUS SPENDING ON NATIONAL AND REGIONAL ECONOMIES
Amount: $12,844
Award Description: RECOVERY JELA 146423 JEAN LAFITTE NATIONAL HISTORIC PARK AND PRESERVE CM SERVICES - INCREASE IN ON-SITE CM SERVICES AS CONSTRUCTION PROJECT WAS EXTENDED DUE TO WEATHER DELAYS AND LOW WATER LEVELS IN THE CANALS.
Amount: $0
Award Description: RECOVERY JELA 146423 CM SERVICES TO REMOVE DEBRIS AND DETRITUS FROM WATERWAYS AND CANALS AT JEAN LAFITTE NATIONAL PARK AND PRESERVE. NO COST TIME EXTENSTION TO ALLOW CM SERVICES OVERSIGHT OF PUNCHLIST ITEMS.
Amount: $40,235
Award Description: VAFO 152410 - CONSTRUCTION MANAGEMENT SERVICES FOR THE REPAIR OF VEGITATED BASINS - TIME EXTENSION AND ASSOCIATED COSTS TO MAINTAIN CMR ON SITE WHILE PROJECT IS COMPLETED.
Amount: $0
Award Description: TAS::14 1041:: TAS RECOVERY VAFO PMIS #152410 - VALLEY FORGE NATIONAL HISOTICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA - ON-SITE INSPECTION SERVICE FOR CONSTRUCTION - EXTENSION DUE TO WINTER SHUT DOWN PERIOD
Amount: $0
Award Description: MOD 2 EXTENDS THE DELIVERY DATE.
Amount: $0
Award Description: MOD 3 EXTENDS THE PERIOD OF PERFORMANCE
Amount: -$16,627
Award Description: MOD 4 DESCOPES AND CLOSES OUT THIS TASK ORDER DUE TO THE INABILITY OF THE CMR TO PERFORM THE STATED DUTIES DUE TO ILLNESS.
Amount: $0
Award Description: RECOVERY STEA 20234 ASBESTOS INSPECTION MONITORING AND AIR SAMPLING SERVICES, STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE. THIS MODIFICATION NO. 0003 EXTENDS THE TASK ORDER FROM MARCH 11, 2011 TO MAY 31, 2011. THE ASSOCIATED CONSTRUCTION CONTRACT HAS BEEN EXTENDED TO APRIL 10, 2011 AND THE SERVICES OF THE A/E WILL BE NEEDED DURING CONSTRUCTION ACTIVITIES AND CLOSEOUT OF THE CONSTRUCTION CONTRACT.
Amount: $0
Award Description: RECOVERY STEA 20234 ASBESTOS INSPECTION MONITORING AND AIR SAMPLING SERVICES, STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE. MODIFICATION 0002 EXTENDS THE PERIOD OF PERFORMANCE TO MARCH 11, 2011 SINCE THE ASSOCIATED CONSTRUCTION CONTRACT IS ONGOING AND SCHEDULED TO BE FINISHED MARCH 2011. THE SERVICES OF THE A/E WILL BE NEEDED FURING THE CONSTRUCTION ACTIVITIES.
Amount: $0
Award Description: NAMA 152410 REHABILITATE THE LINCOLN REFLECTING POOL AND SURROUNDING GROUNDS, CMR SERVICES -
Amount: $1,213
Award Description: STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE CONTRUCTION MANAGEMENT SERVICES. THIS MODIFICATION ADJUSTS THE CONTRACT PRICE DUE TO CALCULATION ERROR AT THE TIME OF AWARD.
Amount: $0
Award Description: GOIS 154316/152710: CONSTRUCTION MANAGEMENT SERVICES, HAZMAT ABATEMENT AND STABILIZATION OF CASTLE WILLIAMS PROJECT, GOVERNORS ISLAND NATIONAL MONUMENT, NEW YORK, NEW YORK MOD 0002 - THIS NO COST MODIFICATION IS TO EXTEND THE PERFORMANCE PERIOD OF THIS TASK ORDER FROM JANUARY 30, 2011, TO FEBRUARY 28, 2011 TO ALLOW FOR FINAL BILLING.
Amount: $39,357
Award Description: RECOVERY GOIS PMIS #152710/154316 - HAZMAT ABATEMENT AND STRUCTURAL STABILIZATION OF CASTLE WILLIAMS, CONSTRUCTION MANAGEMENT SERVICES, GOVERNORS ISLAND NATIONAL MONUMENT, NEW YORK CITY COUNTY, NY. THIS CALL ORDER SHALL CONSIST OF ON-SITE INSPECTION, SPECIAL INSPECTIONS, ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS. MODIFICATION NO. 0001 - THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE OF THIS CALL ORDER FROM NOVEMBER 1, 2010 TO JANUARY 30, 2011 TO COINCIDE WITH THE PROGRESS OF THE CONSTRUCTION PROJECT, AN DTO INCREASE THE CONTRACT CEILING LIMITS FOR ON-SITE CONSTRUCTION INSPECTION SERVICES AND SITE VISITS TO COMPENSATE FOR ON-SITE INSPECTION WORK PERFORMED UNDER CONSTRUCTION CONTRACT NO. 1443C2011091517.
Amount: $0
Award Description: RECOVERY CHOH PMIS#125585 CHESPAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK "CATOCTIN AQUEDUCT REHABILITATION" CONSTRUCTION MANAGEMENT SERVICES, THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE TO JULY 29, 2011 BECAUSE OF A DELAY IN THE COMPLETION OF THE CONSTRUCTION CONTRACT. THIS IS A NO COST MODIFICATION.
Amount: $0
Award Description: THE MODIFICATION WILL REVISE THE SCOPE OF WORK TOINCLUDE A COMBINATION OF RESEARCH OF EXISTING INFORMATION ANDRECORDS, GEOLOGIC/HYDROGEOLOGICAL DESK STUDIES, CONTAMINANT FATE AND TRANSPORT MODELING,AND FOCUSED FIELD ACTIVITIES. WORK WILL BE COMPLETED AS A SERIES OF FOUR TASKS. AT THE END OF TASK 3, A BRIEF SUMMARY POSITION PAPER OF FINDINGS, CONCLUSIONS, AND RECOMMENDATIONS WILL BE PREPARED. THE RECOMMENDATIONS WILL BE INCORPORATED INTO THE DECISION PROCESS,AND ANY ADJUSTMENT IN THE SCOPE OF THE SUBSEQUENT TASK WILL BE MADE, IF WARRANTED. THE FOUR TASKS ARE: 1) REVIEW AVAILABLE RECORDS, 2) CONDUCT LIMITED FIELD PROGRAM, 3) ASSESS HYDROGEOLOGIC CONDITIONS, AND 4) CONDUCT GROUNDWATER SAMPLING AND ANALYSIS OF EXISTING WELLS.
Amount: -$4,619
Award Description: RECOVERY GOGA-150682 GOLDEN GATE NATIONAL RECREATION AREA--ALCATRAZ ISLAND ADMINISTRATIVE MODIFICATION 0003 DEOBLIGATES $4,619.20 BASED ON RECEIPT ON BOTH ORAL AND WRITTEN (ELECTRONIC) CONFIRMATION OF RECEIPT OF CONTRACTOR'S FINAL INVOICE IN THE AMOUNT OF $3,743.40 AND A FINAL RELEASE OF CLAIMS.
Amount: $0
Award Description: RECOVERY NAMA # 150274 A/E TITLE III SERVICES. MODIFICATION 0001 IS AN ADMINISTRATIVE MODIFICATION REVISING LANGUAGE WITHIN THE SCOPE OF SERVICES.
Amount: $0
Award Description: RECOVERY JEFF PMIS# 007895 JEFFERSON NATIONAL EXPANSION MEMORIAL; REPLACE OLD COURTHOUSE ROOF; CONSTRUCTION MANAGEMENT SERVICES. FUND CODE REVISION ONLY.
Amount: -$99
Award Description: RECOVERY JEFF PMIS# 007895 JEFFERSON NATIONAL EXPANSION MEMORIAL; REPLACE OLD COURTHOUSE ROOF; CONSTRUCTION MANAGEMENT SERVICES. DEOBLIGATION MODIFICATION TO REMOVE REMAINING FUNDS.
Amount: $0
Award Description: RECOVERY STEA 20234 CONSTRUCTION MANAGEMENT SERVICES, STABILIZATION OF RAIL EQUIPMENT AND REMOVAL OF ASBESTOS, STEAMTOWN NATIONAL HISTORIC SITE. THIS MODIFICATION NO. 0002 EXTENDS THE COMPLETION DATE OF THE CALL ORDER FROM MARCH 11, 2011 TO MAY 31, 2011. THE ASSOCIATED CONSTRUCTION CONTRACT HAS BEEN EXTENDED TO APRIL 10, 2011 AND THE SERVICES OF THE CONSTRUCTION MANAGEMENT REPRESENTATIVE WILL BE NEEDED DURING CONSTRUCTION ACTIVITIES AND THROUGH THE CLOSE OUT OF THE CONSTRUCTION CONTRACT.
Amount: $18,193
Award Description: TAS::69 8083::TAS RECOVERY CONSTRUCTION MANAGEMENT SERVICES FOR MULTIPLE ROAD REHABILITATION PROJECTS, SHENANDOAH NATIONAL PARK, VA MOD 5: INCREASE PROJECT MANAGEMENT, PER DIEM/LODGING, HOURLY RATES DUE TO ESCALATION, AND ADD SHIPPING COSTS FOR ADDITIONAL SAMPLES TAKEN, ALL DUE TO THE CONSTRUCTION CONTRACTS EXTENDING INTO THE SPRING 0F 2011.
Amount: $0
Award Description: COMPLETION OF THE NATIONAL ENVIRONMETAL POLICY ACT (NEPA) PROCESS FOR UP TO THREE 36) ENVIRONMENTAL ASSESSMENTS (EA'S) TO ASSESS CLOSURE OPTIONS AND ENVIRONMENTAL IMPACTS TO MITIGATE SAFTEY AND ENVIRONMENTAL HAZARDS AT ABANDONED MINES LANDS (AML) IN 6 UNITS WITHIN THE INTERMOUNTAIN REGION OF THE NATIONAL PARK SERVICE AND ONE (1) CERCLA RESPONCE ACTION FOR THE OLD YUMA MINE AT SAGUARO NATIONAL PARK.
Amount: $0
Award Description: THE PURPOSE OF THIS NO-COST MODIFICATION TO REALLOCATE $4,500.00. UNDER THE NO-COST MODIFICATION, THE SCOPE OF WORK UNDER THE SUBCONTRACT TO URS WILL BE REVISED TO INCLUDE ONLY TWO TASKS. ALL OTHER TASKS WOULD BE CLOSED OUT AND REMAINING FUNDS FOR THOSE TASKS APPLIED TO THE FOLLOWING TASKS 1 AND 2: " TASK 1 - DEVELOP BEST ESTIMATES OF WATER DEPTHS AT FOUR EXISTING WELLS NEAR OLD YUMA MINE USING EXISTING DATA; INCORPORATE THESE DATA, PLUS REVISIONS IN RESPONSE TO NPS COMMENTS, INTO THE FINAL GROUNDWATER TECHNICAL PAPER. " TASK 2 - PREPARE THE DRAFT FINAL EE/CA, FINAL SOIL INVESTIGATION REPORT, AND FINAL GROUNDWATER TECHNICAL PAPER, INCORPORATING COMMENTS RECEIVED FROM NPS AND DOCUMENTING THE RESPONSES TO COMMENTS, AND INCORPORATING CHANGES RELATED TO 36 CFR PART 6, AND ADDITIONAL GROUNDWATER DEPTH INFORMATION GATHERED UNDER TASK 1. IT IS ESTIMATED THAT TASK 1 WOULD COST APPROXIMATELY $4,500.00. THE REMAINING FUNDS IN THE SUBCONTRACT BETWEEN LOUIS BERGER GROUP, INC. AND URS WOULD BE ALLOCATED TO TASK 2 -- PREPARATION OF THE RESPONSE TO COMMENTS, DRAFT FINAL EE/CA, AND FINAL SOIL INVESTIGATION DOCUMENT. THIS TASK WOULD LIKELY INCLUDE CONFERENCE CALLS AND/OR MEETINGS TO RESOLVE COMMENTS AND ISSUES AS THEY APPLY TO THE DRAFT EE/CA. BERGER'S REMAINING FUNDS WILL SUPPORT BERGER'S PROJECT MANAGEMENT, REVIEW AND PARTICIPATION IN MEETINGS NEEDED TO FINALIZE THE DOCUMENT, AND SUBCONTRACTOR MARKUP.
Amount: $0
Award Description: ADMINISTRATIVE MODIFICATION TO ASSIST WTIH PUNCHLIST ITEMS.
Amount: $199,924
Award Description: ARRA STIL 152319 CONSTRUCTION MANAGEMENT SERVICES FOR ELLIS ISLAND STABILIZATIONADDITIONAL CMR SERVICES REQUIRED FOR ONSITE INSPECTIONS
Amount: -$3,054
Award Description: VAFO-152410 CM SERVICES DURING CONSTRUCTION - DE-OBLIGATE FUNDS AND CLOSE-OUT CALL ORDER.
Amount: -$163
Award Description: RECOVERY: PEVI 022794: MODIFICATION ONE TO DEOBLIGATE REMAINING FUNDS FOR THE CONSTRUCTION MANAGEMENT SERVICES AT PERRY'S VICTORY AND INTERNATIONAL PEACE MEMORIAL.
Amount: -$2,208
Award Description: RECOVERY CHOH PMIS#12585 CHESAPEAKE AND OHIO CANAL NATIONAL HISTORIC PARK "CATOCTIN AQUEDUCT REHABILITATION" CONSTRUCTION MANAGEMENT SERVICES CLOSEOUT AND FUND DE-OBLIGATION MODIFICATION.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 00
City DISTRICT OF COLUMBIA
County DISTRICT OF COLUMBIA
State DC
Zip 20037