contract- RECIPIENT AWARD SUMMARY

AM EXCAVATING, LLC

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of Agriculture Project Location: SKAGIT
Award Number: AG0489C100289 Project Location - State: WA
Funding Amount: -$46,440 Project Location - Zip Code: 982844328
Ending Date: 2010-12-02 Congressional District: 02

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: AM EXCAVATING, LLC
Recipient Address: 4135 SUNNYBANK DR
Recipient City: CHELAN
Recipient State: WA
Recipient Zip Code: 988169301
Congressional District: WA-04

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::12 1102::TAS SUIATTLE ROAD REPAIR AND MAINTENANCE, MT. BAKER-SNOQUALMIE NATIONAL FOREST. THIS MODIFICATION 0002 IS TO REVISE THE SCHEDULE OF ITEMS AND REDUCE THE DOLLAR AMOUNT OF WORK ADDED BY MOFIFICATION 0001.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $138,100
Award Description: TAS::12 1102::TAS CONN CREEK BRIDGE
Amount: $25,000
Award Description: TAS::12 1102::TAS RECOVERY-MT LOOP HIGHWAY REPAIR AND MAINTENANCE, MT BAKER-SNOQUALMIE NATIONAL FOREST. MODIFICATION 0001 IS TO INSTALL AT A FISH PASSAGE SITE ONE GOVERNMENT FURNISHED 11'X4.5' SPAN PIPE ARCH CULVERT AT MP 39.0 TO INCLUDE ALL LABOR, SUPPLIES, EQUIPMENT AND MATERIALS NEEDED TO COMPLETE THE PROJECT.
Amount: $393,888
Award Description: TAS::12 1102::TAS-RECOVERY - MT LOOP HWY REPAIR AND MAINTENANCE.THIS PROJECT PROVIDES FOR THE REMOVAL OF EXISTING CULVERTS, INSTALLATION OF NEW CULVERTS, RIPRAP, ROADSIDE DRAINAGE DITCH RECONSTRUCTION, SURFACE ROCK PLACEMENT, AND LINEAR GRADING & ROAD RE-ALIGNMENT FOR THE FOREST ROAD 20 IN THE MT. BAKER-SNOQUALMIE NATIONAL FOREST.
Amount: $136,849
Award Description: TAS::12 1102::TAS RECOVERY-SUIATTLE ROAD REPAIR AND MAINTENANCE, MT. BAKER-SNOQUALMIE NATIONAL FOREST. MODIFICATION 0003 ADJUSTS PRICES FOR ASPHALT AND CHIP SEAL WORK AND ADDS MOBILIZATION COSTS RESULTING FROM A GOVERNMENT DELAY RESULTING FROM POSTPONING THE CLOSURE OF FSR 26 (SUIATTLE RD) THROUGH SEPTEMBER 7, 2010 FOR USE TO FACILITATE COMPLETION OF OTHER CONTRACTS.
Amount: $762,056
Award Description: TAS::12 1102::TAS RECOVERY - SUIATTLE ROAD REPAIR AND MAINTENANCE
Amount: $533,634
Award Description: TAS::12 1102::TAS CIP - SUIATTLE ROAD REPAIR AND MAINTENANCE. THIS MODIFICATION 0001 IS TO REVISE THE SCHEDULE OF ITEMS AND ADD ADDITIONAL WORK FUNDED BY THE FOREST.
Amount: $198,690
Award Description: TAS::12 1102::TAS RECOVERY-SUIATTLE ROAD REPAIR AND MAINTENANCE, MT. BAKER-SNOQUALMIE NATIONAL FOREST. MODIFICATION 0004 ADJUSTS LENGTHS OF VARIOUS SIZED CULVERT; ADDS EXCAVATION AND HAULING OF UNSUITABLE ROAD BASE MATERIAL; ADDS HAUL AND PLACEMENT OF BORROW MATERIAL; AND INCREASES THE OVERALL QUANTITY OF GEOTEXTILE MATERIAL, SURFACE AGGREGATE AND ASPHALT AS A RESULT OF UNSUITABLE MATERIAL DISCOVERED DURING EXCAVATION RESULTING IN THE REMOVAL AND DISPOSAL OF THIS MATERIAL AND THE REPLACEMENT WITH SUITABLE BORROW MATERIAL AND PAVEMENT REQUIRED TO BE PLACED OVER THE DISTURBED AREA.
Amount: -$46,440
Award Description: TAS::12 1102::TAS SUIATTLE ROAD REPAIR AND MAINTENANCE, MT. BAKER-SNOQUALMIE NATIONAL FOREST. THIS MODIFICATION 0002 IS TO REVISE THE SCHEDULE OF ITEMS AND REDUCE THE DOLLAR AMOUNT OF WORK ADDED BY MOFIFICATION 0001.
Amount: $0
Award Description: TAS::12 1102::TAS RECOVERY SOUTH ZONE ROAD MAINTENANCE SUBSTITUTE FUND CODE FOR SUBITEM 1B $44,700.00
Amount: $4,500
Award Description: TAS::12 1102::TAS RECOVERY MODIFICATION #1 THIS SERVES TO EXCERCISE THE OPTION FOR INCREASED QUANTITY [FAR 52.217-6] AS FOLLOWS: UNDER SUBITEM 1C INCREASE PAY ITEM 813(1) SPOT SURFACING [FS FURNISHED AGGREGATE] BY 225 CY @ $20.00 SOUTH ZONE HEAVY MAINTENANCE & REPAIR MT. BAKER-SNOQUALMIE NATIONAL FOREST
Amount: $379,020
Award Description: TAS::12 1102::TAS RECOVERY SOUTH ZONE ROAD MAINTENANCE MT. BAKER-SNOQUALMIE NATIONAL FOREST THIS CONSTITUTES AWARD OF SUBITEM 1A (CRRD03) IN AN AMOUNT OF $255,970.00, SUBITEM 1B (CMRD05) IN AN AMOUNT OF $44,700.00 AND SUBITEM 1C (CRRD08) IN AN AMOUNT OF $78,350.00 FROM SOLICITATION AG-0489-S-10-0300
Amount: $129,694
Award Description: TAS::12 1102::TAS RECOVERY - FORESTWIDE ROAD MAINTENANCE - TINKHAM AREA ROAD REPAIRS
Amount: $0
Award Description: ARRA - SOUTH ZONE HEAVY MAINTENANCE&REPAIR PLAN

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 02
City SKAGIT
County SKAGIT
State WA
Zip 98284