contract- RECIPIENT AWARD SUMMARY
| AWARD OVERVIEW |
|
Agency Name: Department of Defense--Military |
Project Location:
EL PASO |
|
Award Number: 0002 |
Project Location - State: TX |
|
Funding Amount:
$29,994,220 |
Project Location - Zip Code: 799060165 |
|
Ending Date:
2010-11-07 |
Congressional District: 16 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
SUNDT CONSTRUCTION, INC. |
|
Recipient Address:
|
2620 S 55TH ST |
|
Recipient City:
|
TEMPE |
|
Recipient State:
|
AZ |
|
Recipient Zip Code:
|
852821868 |
|
Congressional District:
|
AZ-05 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::21 2051::TAS DESIGN AND CONSTRUCTION OF WT BARRACKS AND SITE WORK, FORT BLISS, TX ARRA::YES::ARRA
| Other Awards |
Amount:
$29,994,220
Award Description: TAS::21 2051::TAS DESIGN AND CONSTRUCTION OF WT BARRACKS AND SITE WORK, FORT BLISS, TX ARRA::YES::ARRA |
Amount:
$0
Award Description: PROJECTNUMBER::3824::RP# ARRA: FORT BLISS TANK TRAILS PHASE III PROJECT THIS MOD IS EXERCISING OPTION CLINS 0005, 0006, 0007, 0008, AND 0009 AT FORT BLISS, EL PASO, TX. |
Amount:
$3,553,050
Award Description: RECOVERYPROJECT::38324::RP# FORT BLISS TANK TRAILS PHASE III PROJECT THIS MOD IS EXERCISING OPTION CLINS 0005, 0006, 0007, 0008, AND 0009 AT FORT BLISS, EL PASO, TEXAS. |
Amount:
$2,650,000
Award Description: PROJECTNUMBER::3824::RP# ARRA: FORT BLISS TANK TRAILS PHASE III PROJECT THIS MOD IS EXERCISING OPTION CLINS 0002, 0003, AND 0004 AT FORT BLISS, EL PASO, TX. |
Amount:
$16,875,750
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::3824::RP# ARRA REPAIR TRAINING UNPAVED TANK TRAILS PHASE III AT FORT BLISS, EL PASO, TEXAS. |
Amount:
$31,056
Award Description: ARRA - CONSTRUCTION OF THE WT COMPLEX |
Amount:
$595,617
Award Description: RECOVERYPROJECT#::68900::RP# MODIFICATION TO THE CONSTRUCTION OF THE WT COMPLEX, TO ADD FUNDS TO CONTRACT WITH UTILITY PROVIDERS |
Amount:
$192,409
Award Description: ARRA - CONSTRUCTION OF THE WT COMPLEX, POINT OF DEMARCATION FOR UTILITY LINES |
Amount:
$27,026
Award Description: ARRA - CONSTRUCTION OF THE WT COMPLEX |
Amount:
$0
Award Description: ARRA - CONSTRUCTION OF THE WT COMPLEX |
Amount:
$30,000
Award Description: TAS::57 3404::TAS RECOVERY-FBNV09003A-CONSTRUCT WATER WELLS/WASTE WATER SYSTEMS, RECOVERY-FBNV09003B-REPAIR WATER WELLS. THIS ACQUISITION IS FOR A FIRM FIXED PRICE CONTRACT TO "CONSTRUCT WATER WELLS AND WASTE WATER SYSTEM / REPAIR WATER WELLS" ON DAVIS-MONTHAN AFB, ARIZONA. THIS MODIFICATION CORRECTS AN ADMINISTRATIVE ERROR ON CLIN 0001. ARRA::YES::ARRA |
Amount:
$4,729,955
Award Description: TAS::57 3404::TAS RECOVERY-FBNV09003A-CONSTRUCT WATER WELLS/WASTE WATER SYSTEMS, RECOVERY-FBNV09003B-REPAIR WATER WELLS. THIS ACQUISITION IS FOR A FIRM FIXED PRICE CONTRACT TO "CONSTRUCT WATER WELLS AND WASTE WATER SYSTEM / REPAIR WATER WELLS" ON DAVIS-MONTHAN AFB, ARIZONA IN ACCORDANCE WITH EXISTING LOCAL STATE AND FEDERAL LAWS AND REGULATIONS. THE SOLICITATION CONSISTED OF ONE PROJECT FOR THE CONSTRUCTION OF WATER WELLS AND WATER SYSTEM COMPONENTS, AND THE OTHER PROJECT WAS FOR THE REPAIR OF EXISTING WATER WELLS AND WATER SYSTEM COMPONENTS. SPECIFICALLY, THE PROJECTS INCLUDED THE REPAIR OF WATER WELLS, INCLUDING DIGGING REPLACEMENT WATER WELLS NEXT TO AND THEN CAPPING THE EXISTING WATER WELLS, INSTALLING OR UPGRADING PUMPS, ELECTRICAL SERVICE, INSTRUMENTATION, AND SECURITY EQUIPMENT. IN ADDITION, ITEMS ARE INCLUDED FOR THE REPLACEMENT OF 40 FIRE HYDRANTS AND 40 ISOLATION VALVES AT MULTIPLE LOCATIONS, AND THE REMOVAL OF A 15,000 GALLON WATER TANK AND REPLACING IT WITH A 100,000 GALLON ELEVATED WATER TOWER. ALSO INCLUDED IN THIS PROJECT IS THE CONSTRUCTION OF PREFABRICATED BUILDINGS TO HOUSE THE WELL PUMPS AND ELECTRICAL COMPONENTS, INSTALL AN ENVIRONMENTAL CONTROL CABINET, REPAIR OF SITE FENCING AT VARIOUS LOCATIONS, AND REPAIR OR INSTALLATION OF SECURITY EQUIPMENT AT VARIOUS LOCATIONS. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::57 3404::TAS RECOVERY-FBNV09003A-CONSTRUCT WATER WELLS/WASTE WATER SYSTEMS, RECOVERY-FBNV09003B-REPAIR WATER WELLS. THIS ACQUISITION IS FOR A FIRM FIXED PRICE CONTRACT TO "CONSTRUCT WATER WELLS AND WASTE WATER SYSTEM / REPAIR WATER WELLS" ON DAVIS-MONTHAN AFB, ARIZONA. THIS MODIFICATION CHANGES THE REQUIREMENT AS INDICATED BY STATEMENT OF WORK ADDENDUM DATES 4 MAY 2010. THE CHANGE IS TO IDENTIFY THE SPECIFIC VALVES TO BE REPAIRED, REDUCE THE NUMBER OF VALVES FROM FORTY (40) TO THIRTY TWO (32) VALVES, AND PROVIDE FOR THE ADDITION WORK DUE TO UNFORESEEN SITE CONDITIONS. IN ADDITION, THE LIST OF PERSONS TO BE NOTIFIED WHEN INVOICING, IN THE CLAUSE DM008, HAS BEEN UPDATED TO INCLUDE MR. JERRY SAUDER AND REMOVE MR. DANIEL THELEN. ARRA::YES::ARRA |
Amount:
$0
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#070301RP#: WEATHER TIME EXTENSION |
Amount:
$149,970
Award Description: TAS:: 21 2022::TAS ARRA::YES::ARRA RECOVERYPROJECT#::326231::RP# MODIFICATION TO REFLECT CHANGES TO TANK TRAIL ROUTES AT FORT BLISS,TX PER SOW. |
Amount:
$59,292
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::MK016::RP#
PROJECT TITLE: PROVIDE THERMAL FILM ON WINDOWS THAT WILL REDUCE HEAT TRANSFERRED INOT THE BUILDING FROM LOCAL CLIMATE AND DOES NOT COMPROMISE THE APPEARANCE OF THE BUILDING, ARRA WARRIORS-TRANSITION BARRACKS, BIGGS AAF, FORT BLISS, TX |
Amount:
$313,726
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900::RP# MODIFICATION TO PROVIDE SHADED BIKE RACK AREA AND RECEIVE CREDIT ON DESCOPED WORK AT WARRIOR AND TRANSITION BARRACKS FORT BLISS. |
Amount:
$949,452
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900::RP#
MODIFICATION TO PROVIDE COVERED PARKING CANOPIES WITH PHOTOVOLTAIC PANELS ON FORT BLISS WARRIOR IN TRANSITION BARRACKS. |
Amount:
$61,957
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#432D63RP#
DESIGN AND CONSTRUCT WARRIORS-IN-TRANSITION BARRACKS, FORT BLISS TEXAS 79906. |
Amount:
$17,927
Award Description: ARRA - CONSTRUCTION OF THE WT COMPLEX |
Amount:
$15,265
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::150295RP#
DESIGN AND CONSTRUCT WARRIORS IN TRANSITION BARRACKS AT FORT BLISS TEXAS |
Amount:
$144,384
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900::RP#
MODIFICATION TO INSTALL INTERIOR AND EXTERIOR SECURITY CAMERA SYSTEM AT WARRIORS IN TRANSITIO BARRACKS AT FORT BLISS, TX. |
Amount:
$37,593
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900RP# MODIFICATION TO ADD FIBER OPTICS CABLE AT HEADQUARTERS BUILDING FOR WARRIOR-IN-TRANSITION BARRACKS, FORT BLISS TEXAS. |
Amount:
$20,280
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900::RP# MODIFICATION TO MOVE TRANSFORMER ON WT BARRACKS AT FORT BLISS. |
Amount:
$156,358
Award Description: TAS::21 2051:: TAS ARRA::YES:: ARRA RECOVERYPROJECT#:: MK011::RP#
PROJECT TITLE: ADD SPRAY FOAM SEALANT AT CEILING AND WALLS TO IMPROVE THERMAL INSULATION PERFORMANCE, ARRA WARRIORS-TRANSITION BARRACKS, BIGGS AAF, FORT BLISS, TX |
Amount:
$5,470
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#432D63RP# BIFOLD DOOR CHANGES AT WARRIOR-IN-TRANSITION BARRACKS, FORT BLISS, TEXAS |
Amount:
$30,268
Award Description: TAS::21 2051:: TAS ARRA::YES:: ARRA RECOVERYPROJECT#:: MK011::RP#
PROJECT TITLE: INSTALL A FOIL RADIANT BARRIER ON THE UNDERSIDE OF THE ROOF DECK TO DIRECT HEAT GENERATED BY LOCAL CLIMATE BACK OUT OF BUILDING, ARRA WARRIORS-TRANSITION BARRACKS, BIGGS AAF, FORT BLISS, TX |
Amount:
$39,837
Award Description: TAS::21 2051::TAS ARRA::YES::ARRA RECOVERYPROJECT#::68900::RP# MODIFICATION TO RELOCATE ELECTRICAL DUCT BANK UNDER THE PROJECT FOR DESIGN AND CONSTRUCTION OF THE WT BARRACKS AND SITE WORK AT FORT BLISS. |
Amount:
$15,092
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE SECURED WEAPONS STORAGE ADJACENT TO THE MAIN PUBLIC ENTRANCE AS PER THE SCOPE OF WORK DATED 8/05/2011 FOR THE JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, AZ. |
Amount:
$226,177
Award Description: *RECOVERY* JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, ARIZONA.
THIS MODIFICATION IS BEING ISSUED TO MODIFY A SUMMARY OF ELEMENTS WHICH ARE NOT INCLUDED IN THE ORIGINAL DESIGN AND ADDED DURING DESIGN DEVELOPMENT AS PER THE ATTACHED TECHNICAL ANALYSIS DATED MARCH 10, 2011.
THE FOLLOWING ELEMENTS ARE: CUSTOM ENLARGED PRISONER ELEVATOR WITH CUSTOM SIDE ENTRY AND ADDITIONAL BALLISTIC RESISTANT GLAZING, ADDED SCOPE. THESE ELEMENTS ARE IN THE AMOUNT OF $226,177.00 AS NEGOTIATED AND ACCEPTED ON MARCH 29, 2011. NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. |
Amount:
$105,856
Award Description: THIS MODIFICATION IS BEING ISSUED TO MODIFY THE SALLYPORT CORRIDOR FOR THE JOHN M. ROLL US COURTHOUSE IN YUMA, AZ.
ARRA FUNDS COST APPLIED: $63,972.05
RWA FUNDS COST APPLIED: $41,883.95 |
Amount:
$406,819
Award Description: *RECOVERY* JOHN M. ROLL US COURTHOUSE IN YUMA, AZ
THIS MODIFICATION IS BEING ISSUED TO MODIFY A SUMMARY OF ELEMENTS WHICH ARE NOT INCLUDED IN THE ORIGINAL DESIGN AND ADDED DURING DESIGN DEVELOPMENT AS PER THE ATTACHED TECHNICAL ANALYSIS DATED MARCH 10, 2011.
THE FOLLOWING ELEMENTS ARE: MASONRY WALL IN PARKING AREA; EXPANDED SALLYPORT; ADDED INT. STOREFRONT ASSEM.; STRUCTURAL MODIFICATIONS; PARKING SIGNAGE FOR HYBRID; AND REDESIGN FEES ALL IN THE AMOUNT OF $406,819.00 AS NEGOTIATED AND ACCEPTED ON MARCH 29, 2011. NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. |
Amount:
$0
Award Description: NEW YUMA ARIZONA COURTHOUSE - RECOVERY
98 W 1ST ST., YUMA, AZ
COST TRANSFER FOR DESIGN&CONSTRUCTION CONTINGENCY, USMS&COURTS SPACE |
Amount:
$0
Award Description: *RECOVERY* JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, AZ.
THIS MODIFICATION IS BEING ISSUED TO MODIFY COST TRANSFER FOR USMS&COURTS ALLOWANCES; USMS PRISONER SIDE SECURITY AND CONSOLE; COURTROOM AV&FURNITURE; OFFSITE VEHICLE SECURITY AT PERIMETER; AND FPS SECURITY. |
Amount:
$135,540
Award Description: *RECOVERY* JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, ARIZONA.
THIS MODIFICATION IS BEING ISSUED TO MODIFY THE COMMISSIONING OF ARTWORK FOR THE JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, AZ. THE CONTRACTOR IS AUTHORIZED AND HEREBY DIRECTED TO PROCEED WITH THE WORK AS SET FORTH IN THE FOLLOWING SCOPE OF WORK. THE CONTRACTOR SHALL NOT PROCEED BEYOND THE NOT TO EXCEED AMOUNT OF $135,540.00 WITHOUT FURTHER AUTHORIZATION FROM THE CONTRACTING OFFICER.
THE CONTRACTOR SHALL BE REQUIRED TO ACCEPT AN ARTIST CHOSEN BY THE GSA, WHO WILL SUBSEQUENTLY BE MANAGED BY THE GSA THROUGH THE CONTRACTOR FOR THE PROCUREMENT OF THE ARTWORK. THE DELIVERY AND INSTALLATION WILL BE MANAGED BY THE D/B CONTRACTOR, SUNDT CONSTRUCTION, INC. SUNDT ASSUMES NO LIABILITY FOR THE ARTIST'S PRODUCT. THE SELECTION OF THE ARTIST IS CURRENTLY IN PROGRESS. UPON FINAL SELECTION OF THE ARTIST, ALL PROCUREMENT DOCUMENTS SHALL BE TRANSFERRED TO SUNDT AT WHICH TIME THE WORK WILL BEGIN. THESE DOCUMENTS WILL BE USED TO FORM A CONTRACT BETWEEN SUNDT AND THE CHOSEN ARTIST. THE PAYMENT SCHEDULE SHALL BE INCLUDED IN THE FINAL CONTRACT DOCUMENTS.
THE NOT TO EXCEED AMOUNT FOR THIS SCOPE OF WORK: $123,218.00. THE MANAGEMENT FEE, INCLUDED, FOR THIS CONTRACT MODIFICATION TO BE PER THE CONTRACTUAL 10% IS NOT TO EXCEED: $12,322.00. DEFINITIZATION OF THE MODIFICATION SHALL BE ACCOMPLISHED AT A LATER DATE. |
Amount:
$100,333
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFLECT THAT THE CITY OF YUMA PERFORMED A UTILITY MANAGEMENT EVALUATION FOR THE JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, AZ TO ESTABLISH MUNICIPAL COSTS TO ESTABLISH DOMESTIC WATER AND SEWER SERVICE AS PER THE SCOPE OF WORK DATED 8/09/2011. |
Amount:
$15,320
Award Description: THIS MODIFICATION IS BEING ISSUED TO UPGRADE OFFICE ROOM FOR THE USMS TO USE AS CHIEFS OFFICE; TO ADD PRIVATE ROOM AND TO REDUCE SF AND TO ELIMINATE ONE PLUMBING FIXTURE AT BOTH SECOND FLOOR PUBLIC RESTROOMS FOR THE JOHN M. ROLL US COURTHOUSE IN YUMA, AZ. |
Amount:
-$220
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $220.06 FROM MODIFICATION PS06 WHICH WAS FOR THE PV'S ON THE ROOF OF THE JOHN M. ROLL US COURTHOUSE LOCATED IN YUMA, AZ. |
Amount:
$0
Award Description: *RECOVERY* THIS MODIFICATION IS BEING ISSUED TO MODIFY THE ARRA ACCOUNTING CLASSIFICATION FROM AX0900AX TO AZ0369ZZ FOR THE NEW U.S. FEDERAL COURTHOUSE PROJECT IN YUMA, ARIZONA. |
Amount:
$0
Award Description: *RECOVERY* JOHN M. ROLL UNITED STATES COURTHOUSE, YUMA, AZ.
THIS MODIFICATION IS BEING ISSUED TO ADD FAR CLAUSE 52.225-24, "NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL AND MANUFACTURED GOODS - BUY AMERICAN ACT - CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS" TO THE CONTRACT. |
Amount:
$43,971
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFLECT LEVEL 2 BULLET RESISTANT GLAZING AND BULLET RESISTANT HOLLOW METAL FRAMES AT ALL WINDOWS IN THE MAGISTRATE'S AND VISITING JUDGE'S CHAMBERS AND WITHIN THE MAGISTRATE'S AND VISITING JUDGE'S SUITES FOR THE JOHN M. ROLL UNITED STATES COURTHOUSE IN YUMA, AZ. |
Amount:
$915,575
Award Description: *RECOVERY* JOHN M. ROLL US COURTHOUSE IN YUMA, AZ
THE PURPOSE OF THIS MODIFICATION IS TO ACCEPT THE PROPOSAL BY SUNDT CONSTRUCTION CO. DATED APRIL 8, 2011, FOR 221 PV PANELS. |
Amount:
$24,643,518
Award Description: *RECOVERY* DESIGN BUILD CONTRACT FOR DESIGN AND CONSTRUCTION FOR THE NEW U.S. FEDERAL COURTHOUSE IN YUMA, ARIZONA. |
Amount:
$100,000
Award Description: *RECOVERY* STIPEND FOR THE PHASE TWO SUBMITTAL FOR THE NEW U.S. FEDERAL COURTHOUSE IN YUMA, AZ. |
Amount:
$21,707
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFLECT WOOD WAINSCOTS AND WALLCOVERINGS AS PER THE SCOPES OF WORK DATED 4/06/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
1.) WAINSCOT AT ROOMS 2400&2404: DELETE PAINTED WALL FINISH AND ADD 3' WAINSCOT WITH FABRIC WALLCOVERING FROM TOP OF WAINSCOT TO CEILING TO MATCH ADJACENT CHAMBERS SPACE. TOTAL COST OF THIS WORK IS $14,287.00.
2.) WAINSCOT AT ROOMS 2410&2413: DELETE PAINTED WALL FINISH AND ADD 3' WAINSCOT WITH FABRIC WALLCOVERING FROM TOP OF WAINSCOT TO CEILING. CHANGE IS REQUESTED TO PROVIDE CONSISTENT FINISH IN SURROUNDING VISITING CHAMBERS AND THE TOTAL COST OF THIS WORK IS $14,944.00.
3.) CHANGE CLERK'S OFFICE 2210 IN LIEU OF WAINSCOT AND WALLCOVERING. REQUEST WAS MADE BY COURTS TENANT GROUP. PROPOSED WORK IS A DEDUCTIVE CHANGE ORDER AND PROVIDES A $7,524.00 CREDIT TO THE PROJECT.
THIS MODIFICATION IS IN THE AMOUNT OF $21,707.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,495,978.99. |
Amount:
$0
Award Description: THIS MODIFICATION IS BEING ISSUED TO INCORPORATE H FUNCTION CODES INTO THE BASE AWARD ACCOUNTING CODES FOR THE JOHN M. ROLL US COURTHOUSE, YUMA, AZ.
UNDER LINE ITEM 001/BASE CONTRACT, THE FOLLOWING ARE BROKEN OUT TO REFLECT THE H-CODES WITHIN THE LINE ITEM. THE FOLLOWING H-CODES ARE INCORPORATED FOR BILLING PURPOSES. |
Amount:
$17,992
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFLECT THE PRIMARY CONDUIT BORING (PERMANENT POWER). |
Amount:
$6,355
Award Description: THIS MODIFICATION IS BEING ISSUED TO THE CONTRACTOR TO UPGRADE THE MECHANICAL EQUIPMENT NUMBERING AND CODING TO MEET THE GSA TECHNOLOGY POLICY FOR PBS OWNED BUILDING MONITORING&CONTROL SYSTEMS' REQUIREMENTS. |
Amount:
$133,677
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE TEN 8,000 LB. BOULDERS AT THE NE PROPERTY CORNER FOR ENHANCED PERIMETER SECURITY AND FOUR 8,000 LB. BOULDERS AND A 2' X 6' X 26' VEHICLE RAM WALL AT THE ENTRY BRIDGE IN LIEU OF TEN STEEL BOLLARDS. |
Amount:
$58,320
Award Description: THIS MODIFICATION IS BEING ISSUED TO THE CONTRACTOR TO REFLECT ADDITIONAL HVAC UNIT DUE TO ADT EQUIPMENT HEAT LOAD. |
Amount:
-$13,000
Award Description: THIS MODIFICATION IS TO DEDUCT $13,000.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PHOTOVOLTAIC PANELS ON THE ROOF OF THE JOHN M. ROLL US COURTHOUSE LOCATED IN YUMA, AZ. MODIFICATION PS06 IS REDUCED FROM $781,677.99 TO $768,677.99. |
Amount:
-$58,320
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $58,320.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PV'S. MODIFICATION PS06 IS REDUCED FROM $751,541.99 TO $693,221.99. |
Amount:
$11,633
Award Description: THIS MODIFICATION IS BEING ISSUED TO THE CONTRACTOR TO REMOVE THE POWER POLE AWAY FROM THE MAIN COURTHOUSE ENTRANCE AND THE POWER POLE SHALL BE RELOCATED 88' TO THE EAST, AND THE STREETLIGHT CURRENTLY MOUNTED TO THE POWER POLE SHALL BE RELOCATED TO THE ADJACENT POWER POLE ACROSS 1ST STREET. |
Amount:
-$2,210
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $2,210.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PHOTOVOLTAIC PANELS ON THE ROOF OF THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ. MODIFICATION PS06 (PV MOD) WILL BE REDUCED FROM $543,313.99 TO $541,103.99. |
Amount:
$2,210
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CARPET LOCATED IN THE ATTORNEY WITNESS ROOMS 2224, 2417,&2603 FROM 26OZ. TO 38OZ. AS PER THE SCOPE OF WORK DATED 2/13/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
THIS MODIFICATION IS IN THE AMOUNT OF $2,210 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,495,978.99. |
Amount:
-$21,707
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $21,707.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PHOTOVOLTAIC PANELS ON THE ROOF OF THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ. MODIFICATION PS06 IS REDUCED FROM $565,020.99 TO $543,313.99. |
Amount:
$103,854
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE TEMPORARY CONSTRUCTION EASEMENTS (TCE) FROM THE CITY OF YUMA AS PER THE AGREEMENT DOCUMENT, (JOHN M. ROLL FEDERAL COURTHOUSE AGREEMENT)FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
EASEMENTS WILL BE USED TO PERMIT THE FOLLOWING: STAGING, LAY DOWN, STORAGE, PARKING OF VEHICLES, UNLOADING, AND PLACEMENT OR MARSHALING OF MATERIALS AND EQUIPMENT, UTILITY AND COMMUNICATION TIE-INS AND RELOCATION, SIDEWALK AND CURB CUT CONSTRUCTION, LANDSCAPE INFRASTRUCTURE AND METER INSTALLATION REQUIRED FOR THE PROJECT AND OTHER CONSTRUCTION RELATED ACTIVITIES.
THIS MODIFICATION IS IN THE AMOUNT OF $103,854.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,495,978.99. |
Amount:
-$103,854
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $103,854.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PHOTOVOLTAIC PANELS ON THE ROOF OF THE JOHN M. ROLL U.S. COURTHOUSE IN YUMA, AZ. MODIFICATION PS06 IS REDUCED FROM $668,874.99 TO $565,020.99. |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE NOTICE TO PROCEED WITH THE ACQUISITION AND INSTALLATION OF PV PANELS, AS AGREED TO ON JANUARY 31, 2012 IN THE AMOUNT OF $116,623.00. THIS MODIFICATION DEFINITIZES A PORTION OF PS06, DATED APRIL 8, 2011 IN THE AMOUNT OF $915,575.00. THE CONTRACTOR IS DIRECTED TO INCLUDE THE DEFINITIZED AMOUNT OF $116,623.00 INTO THE SCHEDULE OF VALUES IN ACCORDANCE WITH THE H-CODE LINE ITEM.
THE APPLICATION OF ENERGY FUNCTION CODES, ALSO CALLED H FUNCTION CODES IS TO REPORT THE HIGH-PERFORMANCE GREEN BUILDINGS (HPGB) COMPONENTS OF RECOVERY ACT PROJECTS. THE H-CODE THAT MUST BE APPLIED FOR THE PV PANELS IS PGH71.
ACCOUNTING CLASSIFICATION FOR PV PANELS:
PN1J00240.2012.4421.09.PG01.P0940001.N20.PGH71.NAZ00007.AZ0369ZZ.001 |
Amount:
-$6,355
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $6,355.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PV'S. MODIFICATION PS06 IS REDUCED FROM $675,229.99 TO $668,874.99. |
Amount:
$5,503
Award Description: THIS MODIFICATION IS BEING ISSUED TO PROVIDE IP CAMERA AND WEB ACCESSIBLE HOSTING SERVICE FOR REMOTE PROJECT VIEWING |
Amount:
-$5,503
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $5,503.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PV MOD. MODIFICATION PS06 IS REDUCED FROM $768,677.99 TO $763,174.99. |
Amount:
-$17,992
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $17,992.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PV. PS06 IS REDUCED FROM $693,221.99 TO $675,229.99. |
Amount:
-$41,883
Award Description: THIS REQUISITION IS TO DEDUCT $41,883.95 IN NON-ARRA FUNDS FROM MODIFICATION PS10 (LINE ITEM 0022). DE-COMINGLING ARRA FUNDS AND NON-ARRA FUNDS. COMINGLING ARRA AND NON-ARRA FUNDS ARE PROHIBITED. |
Amount:
-$3,691,398
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO MAKE THE TAS AWARD AMOUNT MATCH THE ACTUAL OBLIGATED ARRA FUNDS. THE BASE AWARD OBLIGATED $5,197,834.00 IN NON ARRA FUNDS THAT WERE CODED TO ARRA. PA02 TRANSFERRED $564,552.00 FROM ARRA TO NON ARRA FUNDS BUT WAS CODED AS A $0.00 CHANGE AND HAS NOT BEEN REFLECTED IN THE ARRA FUNDING. PA05 TRANSFERRED $900,000.00 FROM ARRA TO NON ARRA FUNDS BUT WAS CODED AS A $0.00 CHANGE AND HAS NOT BEEN REFLECTED IN THE ARRA FUNDING. THIS MODIFICATION DEOBLIGATES $3,691,398.05 (SEE LINE ITEMS) AND IS CODED AS AN ARRA ACTION. THE TOTAL ARRA OBLIGATION IS $22,832,815.04. |
Amount:
$13,000
Award Description: THIS MODIFICATION IS BEING ISSUED TO ADD A GALLEY AT VISITING CHAMBERS FOR THE JOHN M. ROLL UNITED STATES COURTHOUSE LOCATED IN YUMA, AZ |
Amount:
-$11,633
Award Description: THIS MODIFICATION IS BEING ISSUED TO DEDUCT $11,633.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PV'S. MODIFICATION PS06 IS REDUCED FROM $763,174.99 TO $751,541.99. |
Amount:
-$133,677
Award Description: THIS MODIFICATION IS TO DEDUCT $133,677.00 FROM MODIFICATION PS06 WHICH WAS FOR THE PHOTOVOLTAIC PANELS ON THE ROOF OF THE JOHN M. ROLL US COURTHOUSE LOCATED IN YUMA, AZ. MODIFICATION PS06 IS REDUCED FROM $915,354.99 TO $781,677.99. |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE MOD 9 AZ1 GENERAL WAGE DETERMINATION IN THE JOHN M. ROLL U.S. FEDERAL COURTHOUSE CONSTRUCTION PROJECT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. |
Amount:
$0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE PC01 WHICH WAS IN THE AMOUNT OF $135,540.00 FOR THE COMMISSIONING OF ARTWORK FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
BACKGROUND:
MODIFICATION PC01 WAS ISSUED ON MARCH 03, 2011 FOR $135,540.00 TO COMMENCE EXECUTION OF AN ART COMMISSION FOR THE SUBJECT PROJECT. COMMISSION WAS STIPULATED IN THE PROJECT AUTHORIZATION OF AN ARTIST'S COMMISSION OF $123,000.00 AND THE ARTIST PROPOSED $123,218.00 AND CONCURRED BY THE ART PANEL.
THE COMMISSION WAS AWARDED THROUGH THE GENERAL CONTRACTOR, SUNDT CONSTRUCTION, INC. SINCE CLOSE COORDINATION IS REQUIRED WITH ARTIST JOHN BISBEE. INCLUDED WITH THE MODIFICATION IS A MANAGEMENT FEE OF 10%,(OR $12,322.00) AS PROVIDED IN THE BASE CONTRACT. SINCE THE ISSUANCE OF THE MODIFICATION, THE CONTRACTOR CONCURS WITH THE FEE. THE FINAL AMOUNT OF THE DEFINITIZATION WAS AGREED BY SUNDT ON NOVEMBER 27, 2012 AS FAIR AND REASONABLE. THEREFORE IT IS RECOMMENDED THAT MODIFICATION PC01 BE DEFINITIZED TO THE FINAL AMOUNT OF $135,540.00.
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
-$526,392
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO RETURN ALL MONEY REMAINING FROM MODIFICATION PA05 TO ARRA EXPIRED FUNDS. |
Amount:
$29,995
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AND INSTALL ONE PRECAST CONCRETE UNDERGROUND VAULT AND ASSOCIATED CONDUIT FOR COMMUNICATIONS (TELEPHONE AND DATA) SERVICE FROM WEST FIRST STREET TO THE MAIN POINT OF ENTRY (MPOE) AT THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ, AS PER THE SCOPE OF WORK DATED 8/24/2012. THIS MODIFICATION INCLUDES TRENCHING, BASE COURSE, CONDUIT, PRECAST CONCRETE VAULT, AND COMPACTION. THIS WILL PROVIDE INFRASTRUCTURE FOR COMMUNICATIONS CABLE FROM A SERVICE PROVIDER TO SUPPORT THE BUILDING AUTOMATION SYSTEM, FIRE ALARM, ELEVATOR CONTROLS AND BUILDING MANAGEMENT COMMUNICATIONS.
THIS MODIFICATION IS IN THE AMOUNT OF $29,995.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,398,820.00.
IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
-$424,480
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION PS06 WHICH IS FOR THE ACQUISITION AND INSTALLATION OF THE PV'S WITH UPDATED TECHNOLOGY.
BACKGROUND:
ON APRIL 8, 2012, PBS REGION 9 ISSUED MODIFICATION PS06 TO CONTRACT NUMBER GS09P10KTC0045 IN THE AMOUNT OF $915,575.05 FOR 221 PHOTOVOLTAIC PANELS FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ. THE CONTRACT MODIFICATION FOR PS06 INCLUDED AN INDEPENDENT GOVERNMENT ESTIMATE, A CONTRACTOR ESTIMATE, AND AN AWARD DECISION MEMORANDUM.
FROM OCTOBER 2011 THROUGH JUNE 2012, PBS REGION 9 OFFICE OF DESIGN AND CONSTRUCTION ISSUED 11 MODIFICATIONS (INCLUDING THE PV PANELS), REDUCING THE ORIGINAL BALANCE ON PS06 MODIFICATION FROM $915,575.05 FOR A REMAINDER OF $424,701.05 ($490,874.00 WAS USED). THE FUNDS WERE USED FOR SUPERSEDING, BONA FIDES NEEDS FOR IN-SCOPE CHANGES TO THE COURTHOUSE. THE 11TH MODIFICATION WAS THE DEFINITIZATION OF PS06 FOR THE PV+S. THE DEFINITIZATION, IN THE AMOUNT OF $116,623 OCCURRED AFTER SEPTEMBER 30, 2011 AND THEREFORE NEEDS AN UPWARD ADJUSTMENT.
ON MARCH 03, 2012, THE CONTRACTING OFFICER DEFINITIZED THE PS06 MODIFICATION FOR PV+S IN THE AMOUNT OF $116,623.00 WHICH WAS MODIFICATION PS34. BECAUSE THE IG HAS DETERMINED THAT THE ORIGINAL MODIFICATION (PS06) WAS NOT A VALID AUTHORIZATION, AND THAT THE DEFINITIZATION DID NOT TAKE PLACE PRIOR TO SEPTEMBER 30, 2011, THE SCOPE OF WORK FOR PV+S, IN THE AMOUNT OF $116,623.00 MUST BE RE-ISSUED AS AN UPWARD ADJUSTMENT USING THE FUNDS THAT HAVE BEEN DEOBLIGATED UNDER THIS MODIFICATION.
THE PV'S WERE ALWAYS A PART OF THE CONTRACT AND ARE INTENDED TO INCREASE THE SUSTAINABLE FEATURES OF THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ. THERE IS A LEGITIMATE NEED TO INCREASE THE USE OF PV'S TO SUPPORT THE PRESIDENT'S INITIATIVE ON SUSTAINABLE DESIGN UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT PROGRAM. |
Amount:
$197,895
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE AN EMERGENCY GENERATOR FOR BUILDING SYSTEMS AND TO MAINTAIN SECURITY AS PER THE SCOPE OF WORK DATED 8/08/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
SCOPE:
INCREASE THE SIZE OF THE EMERGENCY GENERATOR AND MODIFY THE ELECTRICAL PANEL LOADING REQUIREMENTS. ALSO, MODIFY THE SITE DESIGN TO ACCOMMODATE THE LARGER GENERATOR RESULTING FROM INCREASED SECURITY EQUIPMENT LOADS IMPOSED BY THE U.S. MARSHALS. THIS MODIFICATION IS NECESSARY TO INCREASE THE GENERATOR FROM 400 KVA TO 600 KVA TO ACCOMMODATE GREATER DEMANDS THAN ANTICIPATED CAUSED BY THE INCREASE PRISONER HANDLING ELECTRONICS, PERIMETER SECURITY IN A HIGH CRIME AREA AND ENSURE COURT SYSTEMS ARE ADEQUATELY SERVED IN AN EMERGENCY POWER SITUATION.
THIS MODIFICATION IS IN THE AMOUNT OF $197,895.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,614,788.00.
IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
$526,392
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO RETURN ALL MONEY REMAINING FROM MODIFICATION PA05 TO ARRA EXPIRED FUNDS. |
Amount:
$14,153
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO REFLECT THE COURT MILLWORK REVISIONS AS PER THE SCOPE OF WORK DATED 8/20/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
BACKGROUND/SCOPE:
COURTS REQUESTED THE FOLLOWING MODIFICATIONS TO THEIR MILLWORK VIA REDLINES TO SUNDT CONSTRUCTION DURING THE SHOP DRAWINGS/SUBMITTALS REVIEW PROCESS:
1. ADD UPPER CABINETS IN RM 2406
2. PROVIDE TWO (2) MOVEABLE CARTS
3. PROVIDE 2" WOOD TRIM AT RM 2600 BENCH
4. PROVIDE CABINET DOORS TO OPEN BASE CABINETS RM 2415
5. PROVIDE CABINET DOORS AT BASE CABINETS AT RM 2411
6. SUBSTITUTE CONCEALED STEEL SUPPORT BRACKETS IN LIEU OF SURFACE MOUNTED BRACKETS AT RM 2200
7. PROVIDE UPPER CABINETS AT RM 2223, 2221, AND 2207.
THIS MODIFICATION IS IN THE AMOUNT OF $14,153.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,412,973.00.
IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
$3,920
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO REFLECT THE PROBATION INTAKE COUNTER REVISIONS AS PER THE SCOPE OF WORK DATED 10/26/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
THE PURPOSE OF THIS MODIFICATION IS TO IMPROVE SECURITY AND CUSTOMER SERVICE BY REMOVING A PORTION OF THE WALL TO ALLOW A BETTER VISIBILITY TO THE FRONT COUNTER BY THE STAFF FROM THEIR WORK STATIONS. THIS INCLUDES TEL/DATA/POWER AND DRYWALL FRAMING REWORK.
THIS MODIFICATION IS IN THE AMOUNT OF $3,920.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,416,893.00.
IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION. |
Amount:
$161,523
Award Description: THIS MODIFICATION IS BEING ISSUED TO REFLECT THE FIRE ALARM ADDITIONS TO ADD SMOKE DETECTOR EQUIPMENT AND INFRASTRUCTURE FROM GSA FPE REDLINES TO 100% CD'S AS PER THE SCOPE OF WORK DATED 8/20/2012 FOR THE JOHN M. ROLL U.S. COURTHOUSE LOCATED IN YUMA, AZ.
SCOPE:
INCORPORATE REVISIONS TO THE FIRE ALARM SYSTEM AND THE REVISION PROVIDES FOR SEVERAL ADDITIONAL SMOKE DETECTORS, DAMPERS, AND HEAT DETECTORS; INCLUDES ADDITIONAL CONDUIT, WIRE AND PANELS TO ACCOMMODATE ADDITIONAL DEVICES.
THIS MODIFICATION IS IN THE AMOUNT OF $161,523.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,368,825.00.
SCOPE:
INCORPORATE REVISIONS TO THE FIRE ALARM SYSTEM AND THE REVISION PROVIDES FOR SEVERAL ADDITIONAL SMOKE DETECTORS, DAMPERS, AND HEAT DETECTORS; INCLUDES ADDITIONAL CONDUIT, WIRE AND PANELS TO ACCOMMODATE ADDITIONAL DEVICES.
THIS MODIFICATION IS IN THE AMOUNT OF $161,523.00 AS NEGOTIATED AND ACCEPTED AND NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $27,368,825.00. |
Amount:
$424,480
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO ADMINISTRATIVELY CORRECT MODIFICATION PA44 IN COMPRIZONSUITE SO THAT COMPRIZONSUITE AND PEGASYS MATCH. MODIFICATION PA44 WAS INADVERTENTLY VALIDATED IN COMPRIZONSUITE BUT NOT PROCESSED IN PEGASYS. |
Amount:
-$424,480
Award Description: THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CANCEL AND DEOBLIGATE THE FUNDS IN PS06 AND ALL THE DEOBLIGATION/REOBLIGATION MODIFICATIONS ASSOCIATED WITH IT, TO ADDRESS THE CONCERNS RAISED BY THE OFFICE OF INSPECTOR GENERAL. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
16 |
| City |
EL PASO |
| County |
EL PASO |
| State |
TX |
| Zip |
79906 |
|