| Other Awards |
Amount:
$677,052
Award Description: TAS::14 1035::TAS RECOVERY NAMA PMIS # 128232 - EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES, NATIONAL MALL AND MEMORIAL PARKS, NAMA-128232, WASHINGTON DC - CONSTRUCTION MANAGEMENT SERVICES FOR A PROJECT TO ADDRESS THE RECENT DIFFERENTIAL SETTLEMENT CONDITIONS AND LATERAL SOIL MOVEMENT THAT HAS BEEN EXPERIENCED IN THE PROJECT AREA. THE CONSTRUCTION CONTRACT CONSISTS OF EMERGENCY REPAIRS TO SIGNIFICANT STRUCTURAL AND HISTORIC ELEMENTS AT THE JEFFERSON MEMORIAL, A UNIT OF THE NATIONAL PARK SERVICE WITHIN WEST POTOMAC PARK, WASHINGTON, DC. THE PROJECT INVOLVES HEAVY DEMOLITION WORK ASSOCIATED WITH REMOVAL OF THE EXISTING REINFORCED CONCRETE SEAWALL AND PORTIONS OF THE REINFORCED CONCRETE NORTH PLAZA STRUCTURAL SLAB; SHEET PILE INSTALLATION WORK ASSOCIATED WITH ESTABLISHING AND MAINTAINING A DEWATERED WORK AREA; DRILLED CAISSON WORK ASSOCIATED WITH THE INSTALLATION OF 41 REINFORCED CONCRETE CAISSONS OF 48-INCH DIAMETER EMBEDDED INTO BEDROCK; DRIVEN PILE WORK ASSOCIATED WITH THE INSTALLATION OF 53 18-INCH DIAMETER CONCRETE FILLED VERTICAL AND BATTERED PIPE PILES; HEAVY CONSTRUCTION WORK ASSOCIATED WITH THE CONSTRUCTION OF A NEW REINFORCED CONCRETE SEAWALL AND REINFORCED CONCRETE STRUCTURAL SLABS, AND CONSTRUCTION OF OTHER NEW STRUCTURAL ELEMENTS; HEAVY MASONRY WORK ASSOCIATED WITH THE DISMANTLING, TRANSPORT, STORAGE, AND REINSTALLATION OF HISTORIC GRANITE ASHLAR AND GRANITE CAPSTONE SEAWALL FABRIC AND ELEMENTS; DEMOLITION AND RECONSTRUCTION OF OVER 20,000 SQUARE FEET OF EXPOSED AGGREGATE CONCRETE TOPPING COURSE ACROSS THE ENTIRE NORTH PLAZA OF THE MEMORIAL AND OTHER INCIDENTAL AREAS TO PRECISELY MATCH THE EXISTING SURFACE APPEARANCE OF THESE AREAS IN TERMS OF JOINT AND SCORING PATTERNS, MATERIALS, TEXTURES, AND COLORS; AND OTHER MISCELLANEOUS GENERAL CONSTRUCTION WORK ASSOCIATED WITH DEMOLITION AND CONSTRUCTION OF VARIOUS WALKWAY AND ROADWAY ELEMENTS AND NUMEROUS INCIDENTAL PROJECT REQUIREMENTS. |
Amount:
$40,000
Award Description: TAS::14 1041::TAS RECOVERY CM SERVICES FOR THE CONSTRUCTION OF THE PATCHOGUE FERRY TERMINAL |
Amount:
$27,610
Award Description: TAS::47 4543::TAS.
CONSTRUCTION MANAGEMENT SERVICES IN SUPPORT OF CHARLESTON ROOF AND ENERGY REPAIR AND ALTERATION, ROBERT C. BYRD COURTHOUSE, CHARLESTON, WV |
Amount:
$8,402
Award Description: TAS::47 4543::TAS
RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE PHOTO VOLTAIC PANEL ROOF PROJECT AT THE ROBINSON-MEHRIGE US COURTHOUSE, RICHMOND, VA |
Amount:
$384,769
Award Description: TAS::14 1035::TAS RECOVERY SHEN PMIS # 152664 - CONSTRUCTION MANAGEMENT SERVICES FOR THE CONSTRUCTION PROJECT TO "REHABILITATE SIXTEEN HISTORIC OVERLOOKS ALONG SKYLINE DRIVE", SHENANDOAH NATIONAL PARK, SHEN-152664, WARREN, PAGE, RAPPAHANNOCK, MADISON, ROCKINGHAM, ALBEMARLE, AND AUGUST COUNTIES, VA - CONSTRUCTION MANAGEMENT SERVICES FOR A PROJECT TO RESTORE AND REHABILITATE SIXTEEN OVERLOOKS ALONG SKYLINE DRIVE THAT ARE IN NEED OF REHABILITATION. THE OVERLOOKS THAT WILL RECEIVE WORK UNDER THIS PROJECT ARE GOONEY MANOR, LITTLE HOGBACK, JEREMY+S RUN, BEAHM+S GAP, PASS MOUNTAIN, TUNNEL PARKING, JEWELL HOLLOW, TIMER HOLLOW, CRESCENT ROCK, SPITLER KNOLL, FRANKLIN CLIFF'S, FISHER'S GAP, SWIFT RUN, SANDY BOTTOM, TRAYFOOT MOUNTAIN, AND TURK MOUNTAIN OVERLOOKS. |
Amount:
$55,246
Award Description: TAS::14 1035::TAS RECOVERY ROCR PMIS #026027 REHABILITATE HISTORIC LODGE AND ROSTRUM, ROCK CREEK PARK, WASHINGTON, DC |
Amount:
$189,091
Award Description: TAS::14 1041::TAS RECOVERY PMIS #090560 & 090504 CM SERVICES TO TRAILHEAD PARKING AREAS AT LITTLE RIVER/JAKES CREEK AND CM SERVICES TO RESURFACE SMOKEMONT DEVELOPED AREA WITHIN GREAT SMOKY MOUNTAINS NATIONAL PARK.
THIS CALL ORDER SHALL CONSIST OF ON-SITE INSPECTION, SPECIAL INSPECTIONS AND ADMINISTRATION OF THE CONSTRUCTION CONTRACT, OFFICE SERVICES, AND SITE VISITS. ALL WORK SHALL BE PERFORMED UNDER A SINGLE CONTRACT.
ALL WORK PERFORMED ON THE FACILITIES SHALL BE UNDERTAKEN WITH THE UTMOST CARE TO ENSURE THE RESPECT AND PRESERVATION OF NATURAL AND CULTURAL RESOURCES. ALL WORK SHALL PROCEED IN A MANNER THAT WILL MINIMIZE DISRUPTION OF ON-GOING NPS OPERATIONS AND FACILITY MAINTENANCE ACTIVITIES WITHIN THE PARK. THE CONSTRUCTION MANAGEMENT REPRESENTATIVE (CMR) IS RESPONSIBLE FOR COORDINATING THE CONTRACTOR+S CONSTRUCTION EFFORTS WITH THE PARK STAFF'S DAILY OPERATIONS.
|
Amount:
$170,528
Award Description: TAS::14 1401::TAS RECOVERY HOCU 007890 - CONSTRUCTION MANAGEMENT (TITLE III) SERVICES FOR THE CONSTRUCTION OF THE MUSEUM COLLECTION FACILITY AT HOPEWELL CULTURE NATIONAL HISTORIC PARK IN CHILLICOTHE OH. |
Amount:
$70,370
Award Description: RECOVERY PMIS #007890 MODIFICATION ONE TO ADD CONSTRUCTION TESTING SERVICES AND TO INCREASE CMR HOURS FROM PART TIME TO FULL TIME. |
Amount:
$9,279
Award Description: CM SERVICES FOR THE COMPLETION OF THE PATCHOGUE FERRY TERMINAL.
MOD 7 ADDS 80 ADDITIONAL HOURS OF CM SERVICES AND EXTENDS THIS BPA UNTIL APRIL 16, 2010. |
Amount:
$182,710
Award Description: TAS::14 1041::TAS RECOVERY NERI PMIS # 152607A CONSTRUCTION MANAGEMENT SERVICES FOR THE PROJECT 'STABILIZE HISTORIC NUTTALL MINE STRUCTURES' AT NEW RIVER GORGE NATIONAL RIVER. THE WORK OF THIS CALL ORDER CONSISTS OF ON-SITE INSPECTION, OFFICE SERVICES AND SITE VISITS. |
Amount:
$52,597
Award Description: RECOVERY NERI-152607A
THE PURPOSE OF THIS MODIFICATION 0001 IS TO ADD FUNDING FOR CONSTRUCTION INSPECTION AND OFFICE SERVICES FOR THE PROJECT 'STABILIZE HISTORIC NUTTALL MINE STRUCTURES' AT NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA |
Amount:
$195,113
Award Description: TAS::14 1041::TAS RECOVERY MEVE 103765 REPLACE WATERLINE: CHAPIN MESA TO NORTH PARK BOUNDARY, CONSTRUCTION MANAGEMENT SERVICES FOR THE PROJECT |
Amount:
-$6,878
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY. MODIFICATION NO. 1 CORRECTS TYPOGRAPHICAL ERRORS. |
Amount:
$239,283
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY |
Amount:
$67,700
Award Description: RECOVERY BLRI PMIS# 081430 BLUE RIDGE PARKWAY, BUNCOMBE COUNTY, ASHEVILLE, NORTH CAROLINA, CM SERVICES FOR THE REPLACEMENT MT. PISGAH WASTEWATER TREATMENT SYSTEM |
Amount:
$201,221
Award Description: RECOVERY CHOH PMIS #151930 CONSTRUCTION MANAGEMENT SERVICES, STABILIZE HISTORIC CULVERT 182, CHESAPEAKE&OHIO CANAL NATIONAL HISTORICAL PARK |
Amount:
$483,712
Award Description: RECOVERY PINN 005396 AND 005477
CONSTRUCTION MANAGEMENT SERVICES |
Amount:
$312,710
Award Description: RECOVERY NATR-048183 REHABILATE HISTORIC MERIWETHER LEWIS SITE CONTRACT, TUPELO, MISSISSIPPI, CONSTRUCTINO MANAGEMENT SERVICES |
Amount:
$448,037
Award Description: TAS::14 1041::TAS RECOVERY MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - CONSTRUCTION MANAGEMENT SERVICES FOR THE SECOND PHASE OF A TWO-PHASE PROJECT TO REHABILITATE THE MAMMOTH CAVE NATIONAL PARK VISITOR CENTER COMPLEX. PHASE 1 OF THE CONSTRUCTION CONTRACT INCLUDED THE DEMOLITION OF THE EXISTING ONE-STORY 5,500 SQUARE-FOOT ADMINISTRATION BUILDING, CONSTRUCTION OF A NEW 8,980 SQUARE-FOOT VISITOR CENTER, SITE UTILITIES, LANDSCAPING, AND SITE WORK. PHASE 2 OF THE CONSTRUCTION CONTRACT CONSISTS OF 10,264 SQUARE-FEET OF SELECTIVE DEMOLITION AND ALTERATION OF THE ORIGINAL 1956 VISITOR CENTER AND WILL INCLUDE EXTENDING THE NEW BUILDING SYSTEMS ALREADY INSTALLED IN PHASE 1. PHASE 2 WILL INCLUDE 2,520 SQUARE-FEET OF BASEMENT RENOVATION; 7,744 SQUARE-FEET OF NEW INTERIOR CONSTRUCTION ON THE MAIN FLOOR TO CREATE AN EXHIBIT SPACE; AND 1,680 SQUARE-FEET OF A NEW MECHANICAL PLATFORM AT THE MEZZANINE LEVEL. WORK WILL ALSO INCLUDE SHELTERS, PHOTOVOLTAIC, AND SITE WORK. BUILDING COMMISSIONING AND LEED CERTIFICATION TO A MINIMUM OF SILVER ARE REQUIRED. |
Amount:
$498,850
Award Description: RECOVERY INDE 028059 - CONSTRUCTION MANAGEMENT SERVICES - ON-SITE CONSTRUCTION INSPECTION, SPECIAL INSPECTIONS, OFFICE SERVICES, AND SITE VISITS FOR THE REHABILITATE INDEPENDENCE HALL TOWER PROJECT, INDEPENDENCE NATIONAL HISTORICAL PARK, PHILADELPHIA, PENNSYLVANIA. |
Amount:
$60,081
Award Description: TAS::14 1041::TAS RECOVERY PARK XXXX. PMIS XXXXX. ELECTRICAL ENGINEERING QUALITY ASSURANCE SERVICES TO DETERMINE IF DESIGN DELIVERABLES REPRESENT WORK THAT MEETS THE REQUIREMENT OF NATIONAL CODES AND SPECIFIC STANDARDS SET BY THE NPS AND PROJECT INTENT. |
Amount:
$53,733
Award Description: RECOVERY GATE-77297B CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION AT FLOYD BENNETT FIELD, GATEWAY NATIONAL RECREATION AREA, |
Amount:
$227,445
Award Description: RECOVERY ROCR PMIS# 077569 ROCK CREEK PARK,
DISTRICT OF COLUMBIA COUNTY,WASHINGTON, DC, CM SERVICES FOR THE REHABILITATE PEIRCE MILL COMPLEX PROJECT. |
Amount:
$145,744
Award Description: TAS::14 1041::TAS RECOVERY NERI PMIS # 152607B CONSTRUCTION MANAGEMENT SERVICES THE WORK OF THIS CALL ORDER CONSISTS OF ON-SITE CONSTRUCTION INSPECTION, OFFICE SERVICES AND SITE VISITS FOR THE PROJECT 'PROVIDE VISITOR ACCESS AND APPRECIATION IMPROVEMENTS' AT NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA |
Amount:
$235,951
Award Description: RECOVERY FIIS PMIS #152422 CONSTRUCTION MANAGEMENT SERVICES FOR: DESIGN-BUILD REPLACE PATCHOGUE BULKHEADS, FIRE ISLAND NATIONAL SEASHORE |
Amount:
$2,336
Award Description: RECOVERY FIIS-152422, CONSTRUCTION MANAGEMENT SERVICES FOR D-B REPLACE PATCHOGUE BULKHEADS. MODIFICATION NO. 0001 TO PROVIDE OFFICE TRAILER FOR CMR. |
Amount:
$77,609
Award Description: TAS::14 1041::TAS RECOVERY PARK XXXX, PMIS XXXXX. COST ESTIMATING QUALITY ASSURANCE SERVICES TO DETERMINE IF THE OVERALL DESIGN DOCUMENTS ARE OF A QUALITY THAT WILL LEAD TO BIDDABLE AND BUILDABLE PROJECTS WITH A MINIMUM OF RFIS AND MODIFICATIONS. |
Amount:
$495,057
Award Description: RECOVERY, NO PMIS, SENIOR SCHEDULER SERVICES FOR THE DENVER SERVICE CENTER, LAKEWOOD, COLORADO |
Amount:
$143,036
Award Description: RECOVERY GRSM GRSM-054757, 054777, 054782, 090504, 090528, 090560
CONSTRUCTION MANAGEMENT SERVICES CLINGMANS DOME ROAD, REHABILITATE HISTORIC ROARING FORK MOTOR , TRAILHEAD PARKING AREAS , RESURFACE FOOTHILLS PARKWAY (EAST), RESURFACE SMOKEMONT DEVELOPED AREA , AND RESURFACE HEINTOOGA RIDGE |
Amount:
$188,506
Award Description: TAS::14 1041::TAS RECOVERY GRSM 054757 AND GRSM 054777 CM SERVICES.
THE PURPOSE OF THESE CONSTRUCTION PROJECTS IS TO REHABILITATE PAVEMENT ON MULTIPLE GREAT SMOKY MOUNTAINS ROADS, PARKING AREAS, CAMP GROUNDS, AND OVERLOOKS WITHIN GREAT SMOKY MOUNTAINS NATIONAL PARK. CONSTRUCTION OPERATIONS WILL INVOLVE PAVEMENT REHABILITATION THAT WILL INCLUDE MISCELLANEOUS FULL AND PARTIAL DEPTH PATCHING, TRANSITION MILLING, FULL DEPTH RECLAMATION (FDR), SLOPE STABILIZATION, CURB REPAIR, CULVERT REPAIR/REPLACEMENT, ASPHALT CONCRETE PAVEMENT OVERLAY, PAVEMENT STRIPING AND SIGN INSTALLATION. CONSTRUCTION WILL TAKE PLACE DURING THE WINTER, SPRING AND SUMMER OF 2010. THE FULL OBJECTIVES OF THE CONSTRUCTION PROJECT MUST BE MET WHILE ENSURING THE SAFETY OF PARK VISITORS WITH THE LEAST AMOUNT OF INCONVENIENCE AS POSSIBLE TO THEM. |
Amount:
$55,137
Award Description: TAS::14 1041::TAS RECOVERY GRSM 054757 & 054777 CM SERVICES MODIFICATION. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE INSPECTORS WORKING HOURS TO ALLOW FOR ADDITIONAL WORK TO SUPPORT NIGHTS AND WEEKEND WORK TO MEET THE INSPECTION NEEDS OF THE CONSTRUCTION PROJECT. |
Amount:
$94,975
Award Description: RECOVERY GRSM 054777 CM SERVICES TO CHEROKEE ORCHARD ROAD/ROARING FORK MOTOR NATURE TRAIL - ADDING ADDITIONAL OFFICE SERVICES AND EXTENDED FIELD SERVICES TO MATCH THE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: RECOVERY GRSM 054777 ADMINISTRATIVE CHANGE TO ACCOUNTING CODES |
Amount:
$263,000
Award Description: LOGISTICAL AND SUPPORT SERVICES FOR CORRECTIONAL FACILITIES ON TRIBAL LANDS (CFTL) |
Amount:
$98,355
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE ROBERT C. BYRD COURTHOUSE,CHARLESTON, WEST VIRGINIA
1.) ADDITIONAL COST ESTIMATING SERVICES FOR DESIGN DRAWINGS
2.) OPTION II - CONSTRUCTION MANAGEMENT SERVICES DURING CONSTRUCTION
3.) OPTION III - CONSTRUCTION MANAGEMENT SERVICES DURING POST-CONSTRUCTION |
Amount:
$92,277
Award Description: TAS::47 4543::TAS
RECOVERY PROCUREMENT - EXERCISE OPTION I, DESIGN REVIEW AND CONSTRUCTION SERVICES PHASE, PERIOD OF SERVICE IS DECEMBER 30, 2009 THRU MARCH 30, 2010. |
Amount:
-$40,000
Award Description: TAS::47 4543::TAS
DECREASE SCOPE OF WORK FOR CM SERVICES UNDER THE REFERENCED CONTRACT. HOURS NO LONGER NECESSARY TO COMPLETE PROJECT. |
Amount:
$38,058
Award Description: MODIFICATION OF EXISTING ORDER FOR IN-SCOPE SERVICES.
ADDITIONAL INSPECTION SERVICES TO SUPPORT THE ROOF AND ENERGY REPAIR & ALTERATION PROJECT, ROBERT C. BYRD COURTHOUSE, CHARLESTON, WV |
Amount:
$0
Award Description: RECOVERY SHEN PMIS # 152664 - CONSTRUCTION MANAGEMENT SERVICES FOR THE CONSTRUCTION PROJECT TO "REHABILITATE SIXTEEN HISTORIC OVERLOOKS ALONG SKYLINE DRIVE", SHENANDOAH NATIONAL PARK, SHEN-152664-MODIFICATION 0001 IS ISSUED TO REALIGN HOURS FOR CONSTRUCTION MANAGEMENT INSPECTION SERVICES, OFFICE SERVICES AND SITE VISITS LINE ITEMS BASED ON THE REMAINING EFFORT. |
Amount:
$0
Award Description: RECOVERY ROCR PMIS#026027 REHABILITATE HISTORIC LODGE AND ROSTRUM, ROCK CREEK PARK, WASHINGTON D.C. THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE TO JULY 1, 2011 FOR THE REVIEW OF THE AS-BUILT DRAWINGS SUBMITTED BY THE CONSTRUCTION CONTRACTOR. |
Amount:
$0
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE MERIWETHER LEWIS SITE LOCATED AT NATCHEZ TRACE PARKWAY. |
Amount:
$51,360
Award Description: MODIFICATION NO. 2 - PROVIDING FUNDING FOR THE TIME EXTENSION. TIME EXTENSION REQUIRED DUE TO EXTENSION OF CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: MODIFICATION NO. 4 - EXTEND PERFORMANCE PERIOD TO JUNE 30, 2011 TO COMPLETE OVERSIGHT OF THE PUNCH LIST ITEMS FROM THE CONSTRUCTION PROJECT. |
Amount:
$0
Award Description: MODIFICATION NO. 1 - EXTEND PERFORMANCE PERIOD TO MARCH 31, 2011. NO COST TIME EXTENSION |
Amount:
$17,841
Award Description: MODIFICATION 3. PROVIDE FUNDING AND EXTEND PERFORMANCE PERIOD TO COINCIDE WITH THE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: RECOVERY NERI 152607A CONSTRUCTION MANAGEMENT SERVICES, STABILIZE HISTORIC NUTTALL MINE STRUCTURES, NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA. THIS MODIFICATION NO. 0002 EXTENDS THE COMPLETION DATE TO DECEMBER 14, 2011. THE ASSOCIATED CONSTRUCTION CONTRACT COMPLETION DATE IS OCTOBER 26, 2011 AND IT IS NECESSARY TO HAVE THE CONSTRUCTION MANAGEMENT REPRESENTATIVE ON SITE DURING CONSTRUCTION ACTIVITIES AND CLOSE-OUT ACTIVITIES. |
Amount:
$0
Award Description: RECOVERY: HOCU 007890: MUSEUM COLLECTION FACILITY - CM SERVICES MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE OF SERVICES TO COVER DELAYS IN COMPLETING PUNCH LIST ITEMS AND CONTRACT CLOSEOUT ITEMS FOR WEATHER. |
Amount:
$0
Award Description: RECOVERY: HOCU 007890 - CM SERVICES FOR CONSTRUCTION OF MUSEUM COLLECTION FACILITY - MODIFICATION THREE TO EXTEND THE PERIOD OF PERFORMANCE TO ALLOW TO FINAL PUNCH LIST ITEMS AND CONSTRUCTION CLOSEOUT |
Amount:
$0
Award Description: RECOVERY MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - THIS NO-COST MODIFICATION IS TO EXTEND THE PERFORMANCE PERIOD OF THIS CALL ORDER DUE TO AN EXTENSION OF THE CONSTRUCTION CONTRACT, WHICH WAS DELAYED THROUGH NO FAULT OF THE CONTRACTOR. |
Amount:
$179,523
Award Description: RECOVERY MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - MODIFICATION 0002 EXTENDS THE PERFORMANCE PERIOD OF THIS CALL ORDER AND PROVIDES ADDITIONAL LABOR HOURS DUE TO AN EXTENSION OF THE CONSTRUCTION CONTRACT, WHICH WAS DELAYED THROUGH NO FAULT OF THE CONTRACTOR. |
Amount:
$0
Award Description: RECOVERY GATE-77297B CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION AT FLOYD BENNETT FIELD, GATEWAY NATIONAL RECREATION AREA. MODIFICATION NO. 0001 TO EXTEND PERIOD OF PERFORMANCE TO 01/31/2011. |
Amount:
$0
Award Description: RECOVERY GATE-77297B CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION AT FLOYD BENNETT FIELD, GATEWAY NATIONAL RECREATION AREA. MODIFICATION NO. 0002 TO EXTEND PERIOD OF PERFORMANCE TO 07/29/2011. |
Amount:
$0
Award Description: RECOVERY ROCR PMIS# 077569 ROCK CREEK PARK, DISTRICT OF COLUMBIA COUNTY, WASHINGTON, DC, CM SERVICES FOR THE REHABILITATE PEIRCE MILL COMPLEX PROJECT, MOD 01 TO EXTEND THE POP TO 06/30/11, AT NO COST TO EITHER PARTY |
Amount:
$0
Award Description: RECOVERY NERI 152607B CONSTRUCTION MANAGEMENT SERVICES, PROVIDE VISITOR ACCESS AND APPRECIATION IMPROVEMENTS AT HISTORIC NUTTALLBURG TOWN SITE, NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA. THIS MODIFICATION NO. 0001 EXTENDS THE COMPLETION DATE TO DECEMBER 14, 2011. THE ASSOCIATED CONSTRUCTION CONTRACT COMPLETION DATE IS OCTOBER 26, 2011, AND IT IS NECESSARY THAT THE CONSTRUCTION MANAGEMENT REPRESENTATIVE BE ON SITE DURING CONSTRUCTION ACTIVITIES AND FOR CLOSE-OUT ACTIVITIES. |
Amount:
$7,883
Award Description: RECOVERY GRSM 090560 CM SERVICES TO TRAILHEAD PARKING AREAS AT LITTLE RIVER/JAKES CREEK - EXTEND CM SERVICES TO MATCH THE CONSTRUCTION CONTRACT END DATE. |
Amount:
-$70,423
Award Description: RECOVERY CHOH-151930 CONSTRUCTION MANAGEMENT SERVICES. MODIFICATION NO. 0001 TO REDUCE FUNDING FOR UNUSED LEVEL OF EFFORT ON PROJECT. PROJECT IS COMPLETE, AND FINAL. |
Amount:
$0
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY. MODIFICATION NO. 3 EXTENDS THE CALL ORDER PERFORMANCE PERIOD FROM SEPTEMBER 16, 2011 TO NOVEMBER 30, 2011, DUE TO EXTENSION OF THE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY. MODIFICATION NO. 2 EXTENDS THE CALL ORDER PERFORMANCE PERIOD FROM MAY 13, 2011, TO SEPTEMBER 16, 2011, DUE TO EXTENSION OF THE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: RECOVERY NAMA-128232,EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM JUNE 3, 2011, TO SEPT. 30, 2011, DUE TO EXTENSIONS MADE TO THE CONSTRUCTION CONTRACT. |
Amount:
$0
Award Description: RECOVERY NAMA-128232,EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM SEPT. 30, 2011, TO NOV. 30, 2011, DUE TO EXTENSIONS MADE TO THE CONSTRUCTION CONTRACT AND TIME REQUIRED FOR MINOR TASKS DURING CONTRACT CLOSE OUT. |
Amount:
$0
Award Description: RECOVERY NAMA-128232,EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES
THE PURPOSE OF THIS MODIFICATION IS TO ADJUST THE LEVEL OF EFFORT BY LOWERING THE NUMBER OF HOURS FOR OFFICE SERVICES AND INCREASING THE NUMBER OF HOURS FOR THE ONSITE INSPECTOR RESULTING IN NO COST CHANGE TO THE CALL ORDER. |
Amount:
$4,762
Award Description: TAS::47 4543::TAS
RECOVERY PROCUREMENT - INCREASE CONSTRUCTION MANAGEMENT TASK
FOR THE ADDITIONAL LEVEL OF EFFORT AND ALL EXPENSES INCURRED UNDER THE PROJECT. |
Amount:
-$16,344
Award Description: CM SERVICES
ROOF/ENERGY R&A PROJECT
CHARLESTON WV |
Amount:
$0
Award Description: RECOVERY FIIS-152422, CONSTRUCTION MANAGEMENT SERVICES FOR D-B REPLACE PATCHOGUE BULKHEADS. THIS WITHIN SCOPE MODIFICATION NO. 0003 ISSUED IN ORDER TO EXTEND POP TO 7/31/2011. THE EXTENSION IS REQUIRED TO FACILITATE CLOSE OUT OF THE CONSTRUCTION CONTRACT. |
Amount:
-$32,630
Award Description: RECOVERY FIIS-152422, CONSTRUCTION MANAGEMENT SERVICES FOR D-B REPLACE PATCHOGUE BULKHEADS. THIS WITHIN SCOPE MODIFICATION NO. 0004 TO DEOBLIGATE/CLOSEOUT CALL ORDER. THE DEOBLIGATION IS FOR UNUSED LEVEL OF EFFORT UNDER THE FIXED-PRICE LEVEL OF EFFORT CALL ORDER. |
Amount:
$0
Award Description: RECOVERY: HOCU 007890 - MODIFICATION 5 TO EXTEND THE PERIOD OF PERFORMANCE FOR CONSTRUCTION MANAGEMENT SERVICES AT THE MUSEUM COLLECTION FACILITY TO ENABLE ATTENDANCE AT THE FINAL PROJECT INSPECTIONS. |
Amount:
$0
Award Description: RECOVERY: HOCU 007890 - CONSTRUCTION MANAGEMENT SERVICES FOR THE CONSTRUCTION OF THE MUSEUM COLLECTION FACILITY. THIS MODIFICATION EXTENDS THE PERIOD OF PERFORMANCE TO FINALIZE THE PUNCH LIST AND COMPLETE CONSTRUCTION CLOSE-OUT ACTIVITIES. |
Amount:
$0
Award Description: MODIFICATION NO. 0004 TO ALLOCATE LEVEL OF EFFORT HOURS IN DIFFERENT LABOR CATEGORIES AT NO COST TO EITHER PARTY. |
Amount:
$0
Award Description: NO-COST EXTENSION |
Amount:
$0
Award Description: INDE 028059 --EXTEND PERFORMANCE PERIOD FROM JUNE 15, 2012 TO JULY 15, 2012 TO ALLOW FOR CONSTRUCTION MANAGEMENT SERVICES DURING PUNCHLIST ACTIVITIES UNDER CONSTRUCTION PROJECT. |
Amount:
$35,000
Award Description: OTHER FUNCTIONS - MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2)CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - MODIFICATION 0006 EXTENDS THE PERFORMANCE PERIOD OF THIS CALL ORDER AND PROVIDES ADDITIONAL LABOR HOURS DUE TO AN EXTENSION OF THE CONSTRUCTION CONTRACT, WHICH WAS DELAYED THROUGH NO FAULT OF THE CONTRACTOR. |
Amount:
$92,320
Award Description: OTHER FUNCTIONS - MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - MODIFICATION 0005 EXTENDS THE PERFORMANCE PERIOD OF THIS CALL ORDER AND PROVIDES ADDITIONAL LABOR HOURS DUE TO AN EXTENSION OF THE CONSTRUCTION CONTRACT, WHICH WAS DELAYED THROUGH NO FAULT OF THE CONTRACTOR. |
Amount:
$0
Award Description: RECOVERY MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - MODIFICATION 0003 CLARIFIES THE LEVEL OF EFFORT FOR THIS CALL ORDER. |
Amount:
$0
Award Description: RECOVERY MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2 - WEST BLDG)&EXHIBITS" CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY - THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT'S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO THE DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$31,665
Award Description: OTHER FUNCTIONS - MACA PMIS # 114336 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REHABILITATE VISITOR CENTER (PHASE 2) CONSTRUCTION PROJECT, MACA-114336, MAMMOTH CAVE, EDMONSON COUNTY, KY -- MODIFICATION 0007 EXTENDS THE PERFORMANCE PERIOD OF THIS CALL ORDER AND PROVIDES ADDITIONAL LABOR HOURS DUE TO AN EXTENSION OF THE CONSTRUCTION CONTRACT, WHICH WAS DELAYED THROUGH NO FAULT OF THIS CONTRACTOR. |
Amount:
-$9,135
Award Description: OTHER FUNCTIONS - NAMA-128232, EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE THE REMAINING FUNDING AND CONTRACT CLOSE OUT. |
Amount:
$0
Award Description: RECOVERY NAMA-128232,EMERGENCY REPAIRS TO JEFFERSON MEMORIAL SEAWALL, CONSTRUCTION MANAGEMENT SERVICES
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM NOV. 30, 2011, TO DECEMBER 22, 2011, DUE TO EXTENSIONS MADE TO THE CONSTRUCTION CONTRACT AND TIME REQUIRED FOR MINOR TASKS DURING CONTRACT CLOSE OUT. |
Amount:
$82,800
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY. MODIFICATION NO. 4 INCREASED AWARD BY $82,800.00 AND EXTENDS THE CALL ORDER PERFORMANCE PERIOD FROM NOVEMBER 30, 2011 TO DECEMBER 31, 2011, DUE TO EXTENSION OF THE CONSTRUCTION CONTRACT. |
Amount:
$31,000
Award Description: RECOVERY GWMP PMIS #150123 CONSTRUCTION MANAGEMENT SERVICES FOR REHABILITATE ARLINGTON HOUSE, OUTBUILDING AND GROUNDS, PHASE 2A AND 2B, GEORGE WASHINGTON MEMORIAL PARKWAY. MODIFICATION NO. 5 INCREASED AWARD BY $31,000.00 AND EXTENDS THE CALL ORDER PERFORMANCE PERIOD FROM DECEMBER 31, 2011 TO JUNE 30, 2012. THIS EXTENSION IS OF THE RESULT OF THE CONSTRUCTION CONTRACT BEING EXTENDED WHICH HAS INCREASED THE LEVEL OF EFFORT REQUIRED BY THE CONSTRUCTION MANAGER. |
Amount:
-$25,647
Award Description: RECOVERY NERI 152607A CONSTRUCTION MANAGEMENT SERVICES, STABILIZE HISTORIC NUTTALL MINE STRUCTURES, NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA. THIS MODIFICATION NO. 0003 REDUCES THE CONTRACT VALUE IN DUE TO LEVEL OF EFFORT THAT WAS NOT EXPENDED UNDER THIS CALL ORDER. PROJECT IS COMPLETE AND THIS MODIFICATION IS INITIATED TO FACILITATE PROJECT CLOSEOUT |
Amount:
-$25,048
Award Description: RECOVERY NERI 152607B CONSTRUCTION MANAGEMENT SERVICES, PROVIDE VISITOR ACCESS AND APPRECIATION IMPROVEMENTS AT HISTORIC NUTTALLBURG TOWN SITE, NEW RIVER GORGE NATIONAL RIVER, WEST VIRGINIA. THIS MODIFICATION NO. 0002 REDUCES THE CONTRACT VALUE IN DUE TO LEVEL OF EFFORT THAT WAS NOT EXPENDED UNDER THIS CALL ORDER. PROJECT IS COMPLETE AND THIS MODIFICATION IS INITIATED TO FACILITATE PROJECT CLOSEOUT. |
Amount:
-$91
Award Description: TAS::14 1041::TAS RECOVERY - OTHER FUNCTIONS, SENIOR SCHEDULER SERVICES, DENVER SERVICE CENTER, LAKEWOOD, CO. ALL WORK UNDER THIS CALL ORDER HAS BEEN PERFORMED BY THE CONTRACTOR AND
ACCEPTED BY THE GOVERNMENT. THE CONTRACTOR HAS BEEN PAID IN FULL FOR SERVICES RENDERED, A TOTAL AMOUNT OF $509,965.20. THE PURPOSE OF THIS MODIFICATION IS TO CLOSE OUT THIS CALL ORDER AND DE-OBLIGATE THE REMAINING FUNDS. |
Amount:
$0
Award Description: CHANGE IN KEY PERSONNEL AND UPDATED HOURLY RATE SCHEDULE AND LABOR CATEGORY HOUR DISTRIBUTION AT NO COST TO THE GOVERNMENT. |
Amount:
-$16,792
Award Description: HOCU 007890 MWR-ARRA DEOBLIGATE REMAINING CONTRACT FUNDS FOR CLOSE-OUT. |