| Other Awards |
Amount:
$431,690
Award Description: TAS::21 2022::TAS ARRA::YES::ARRA
THIS IS A ARRA PROJECT FOR DESIGN AND NON DESIGN SERVICES FOR POTABLE SERVICE WATER LINE AT PICATINNY ARSENAL, NEW JERSEY |
Amount:
$163,355
Award Description: TAS::21 2022::TAS RECOVERYPROJECT#::39015::RP# FOR NON DESIGN, DESIGN AND CONSTRUCTION SERVICES FOR THE INSTALLATION OF POTABLE AND FIRE SERVICE WATER LINE, PICATINNY ARSENAL, NEW JERSEY. ARRA::YES::ARRA |
Amount:
$148,357
Award Description: W912DR07D0021; A1190A-TITLE II SERVICES & O&M MANUALS
TAS::96 3134::TAS ARRA::YES::ARRA
RECOVERY PROJECT#::109850
ENGINEERING SERVICES DURING CONSTRUCTION, GENERATION OF OPERATIONS AND MAINTENANCE MANUAL, WASHINGTON D.C. AND VICINITY, LOCAL FLOOD PROTECTION-17TH ST. CLOSURE STRUCTURE. |
Amount:
$54,472
Award Description: RECOVERY--17TH STREET CLOSURE - FLOOD PROTECTION STRUCTURAL IMPROVEMENTS TO THE EXISTING FLOOD PROTECTION MEASURES IN THE WASHINGTON DC ARE PLANNED IN AND AROUND THE NATIONAL MALL AREA. THE IMPROVEMENTS CONSIST OF CONSTRUCTING A 380+ FLOOD PROTECTION CLOSURE ACROSS 17TH ST., SOUTH OF CONSTITUTION AVE. NW. THE CLOSURE CONSISTS OF A 140+ LONG REMOVABLE POST AND PANEL SYSTEM AND TWO (2) 120+ LONG PERMANENT REINFORCED CONCRETE FLOODWALLS LOCATED ON BOTH SIDES OF THE POST AND PANEL SYSTEM. IN THE OPTIONAL WORK, THE FLOODWALLS WILL BE STONE VENEERED TO BLEND IN WITH THE SITE SETTINGS AND TO MINIMIZE VISUAL IMPACTS AND ALL DISTURBED AREAS WILL BE LANDSCAPED.
|
Amount:
$79,745
Award Description: W912DR-07-D-0021 TO. 0009
TAS::96 3122::TAS :: YES::ARRA
REVOVERY PROJECT #109850::RP
109850 REVISED 10 JANUARY 2011
SCOPE OF WORK FOR
RECOVERY ACT: SOUTH SIDEWALK AREA,
WASHINGTON D.C. AND VICINITY, LOCAL FLOOD PROTECTION + 1TH ST. CLOSURE STRUCTURE |
Amount:
$19,374
Award Description: RECOVERY ACT -- TITLE II SERVICES; O&M EDC 17TH STREET CLOSURE |
Amount:
$70,870
Award Description: DC: AE DESIGN SOUTH SIDEWALK AREA, MOD FOR SIDEWALK SPRINKLER DESIGN |
Amount:
$5,172
Award Description: EXERCISING OPTION 3A |
Amount:
$26,408
Award Description: RECOVERY ACT -- TITLE II SERVICES; O&M |
Amount:
$21,062
Award Description: ADDITIONAL SITE VISITS AND MAN HOURS TO PROVIDE FOR TECHNICAL ASSISTANCE. |
Amount:
$12,616
Award Description: RECOVERY ACT -- TITLE II SERVICES; O&M - EXERCISING OPTION |
Amount:
$6,883
Award Description: THIS MODIFICATION IS TO ADD ADDITIONAL HOURS OF TITLE II SERVICES |
Amount:
$6,883
Award Description: MOD TO EXERCISE OPTIONAL CLIN 00013 FOR ADDITIONAL TECHNCIAL ASSISTANCE--RECOVERY ACT -- TITLE II SERVICES; O&M |
Amount:
$19,906
Award Description: RECOVERY ACT -- TITLE II SERVICES; O&M 17TH ST CLOSURE MODIFICATION ACTION. |
Amount:
$30,241
Award Description: RECOVERY ACT --17TH ST CLOSURE-ADD 216 HOURS TO TASK 3F TECHNICAL ASSISTANCE |