APSI CONSTRUCTION MANAGEMENT

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: TRAVIS
Award Number: GS07P09UYC0002 Project Location - State: TX
Funding Amount: $444 Project Location - Zip Code: 787013822
Ending Date: 2013-04-14 Congressional District: 21

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: APSI CONSTRUCTION MANAGEMENT
Recipient Address: 8885 RESEARCH DR
Recipient City: IRVINE
Recipient State: CA
Recipient Zip Code: 926182830
Congressional District: CA-48

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::47 4543::TAS RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX ADD COST ESTIMATING SERVICES FOR CHANGING GLAZING






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $2,092,924
Award Description: TAS::47 4543::TAS RECOVERY CM SERVICES FOR US FEDERAL COURTHOUSE IN BAKERSFIELD CA
Amount: $2,982,135
Award Description: TAS::47 4543::TAS CONSTRUCTION MANAGEMENT AS AGENT (CMA) SERVICES FOR THE NEW U.S. COURTHOUSE IN AUSTIN, TX.
Amount: $0
Award Description: BLANKET PURCHASE AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE DESIGN AND CONSTRUCTION DIVISION, DENVER SERVICE CENTER, LAKEWOOD, COLORADO
Amount: $438,519
Award Description: RECOVERY, SERVICES NOT SPECIFIC TO ONE PARK AND/OR PROJECT, CONSTRUCTION MANAGEMENT SERVICES FOR THE DESIGN AND CONSTUCTION DIVISION, DENVER SERVICE CENTER, LAKEWOOD, COLORADO
Amount: $30,000
Award Description: RECOVERY, SERVICES NOT SPECIFIC TO ONE PARK AND/OR PROJECT, CONSTRUCTION MANAGEMENT SERVICES FOR THE DESIGN AND CONSTRUCTION DIVISION, DENVER SERVICE CENTER, LAKEWOOD, COLORADO
Amount: $0
Award Description: TAS::47 4543::TAS ADD ARRA CLUASES TO CONTRACT NUMBER GS-09P-09-KS-D-0069. ADDITIONAL CLUASES ADDED: 1. 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009), 2. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAR 2009), 3. 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT-REPORTING REQUIREMENTS (MAR 2009), 4. 52.215-2 AUDIT AND RECORDS-NEGOTIATION (MAR 2009) ALTERNATE I
Amount: $73,110
Award Description: RECOVERY ACT - IDIQ CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES, "ENERGY UPGRADES", B. R. THOMPSON FEDERAL BUILDING, RENO, NV
Amount: $444
Award Description: TAS::47 4543::TAS RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX ADD COST ESTIMATING SERVICES FOR CHANGING GLAZING
Amount: -$33,220
Award Description: TAS::47 4543::TAS RECOVERY: CMA SERVICES FOR THE NEW U.S. COURTHOUSE IN AUSTIN, TX DELETE PROPOSED FIRE PROTECTION ENGINEER (FPE)
Amount: $28,342
Award Description: RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX PROVIDE COST RECONCILIATION SERVICES
Amount: $787,429
Award Description: RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE JFK WINDOW REPLACEMENT PROJECT
Amount: $0
Award Description: TAS::47 4543::TAS MODIFICATION PA01 FOR IDIQ CONTRACT FOR CM SERVICES, +RECOVERY-CONSTRUCTION MANAGEMENT FOR HVAC AND CONTROLS PROJECTS: USCH 312 N. SPRING STREET, ROYBAL FB, CHAMBERS USCH, CHET HOLIFIELD FB", LOS ANGELES, CA, CONTRACT NO. GS-09P-09-KS-D-0074, DELIVERY ORDER NO. GS-09P-10-KS-C-0065
Amount: $486,946
Award Description: TAS::47 4543::TAS IDIQ CONTRACT FOR CM SERVICES, +RECOVERY-CONSTRUCTION MANAGEMENT FOR HVAC AND CONTROLS PROJECTS: USCH 312 N. SPRING STREET, ROYBAL FB, CHAMBERS USCH, CHET HOLIFIELD FB", LOS ANGELES, CA
Amount: $275,200
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES THE PURPOSE OF THIS MODIFICATION IS TO ADD THE CONSTRUCTION MANAGEMENT SERVICES AS FOLLOW: 1. MANAGEMENT OF CONSTRUCTION OF LEED CAFETERIA AT THE FEDERAL BUILDING IN LOS ANGELES, 300 NORTH LOS ANGELES, LOS ANGELES, CA. PERIOD OF PERFORMANCE IS ANTICIPATED TO BE FROM AUGUST 2011 TO AUGUST 2012. 2. THE REQUIREMENTS AND SCHEDULE ARE REMAINED THE SAME. 3. FOR THIS PROJECT, THE GSA PROJECT MANAGER IS DANIELLE BOGNI, 415-522-3396, DANIELLE.BOGNI@GSA.GOV. 4. THIS CHANGE IS IN THE AMOUNT OF $275, 200. PROJECT MANAGER $1,055 PER DAY X TOTAL OF 190 HOURS = $200, 541. INSPECTOR $667 PER DAY X TOTAL OF 112 HOURS = $74,659.
Amount: $166,402
Award Description: PROVIDE CONSTRUCTION MANAGEMENT SERVICES
Amount: $28,393
Award Description: ADDITIONAL CM/CX SERVICES TO AGREE WITH AWARDED CONSTRUCTION CONTRACT OPTION ITEMS 11, 12, AND 14
Amount: $65,197
Award Description: CONTRUCTION MANAGEMENT ASSISTANCE AND ELECTRICAL INSPECTION SERVICES IN SUPPORT OF THE ARRA LIGHTING UPGRADES PROJECT AT THE UNITED STATES COURTHOUSE, 700 STEWART STREET, SEATTLE, WA.
Amount: $9,363
Award Description: MODIFICATION TO EXTEND PERIOD OF PERFORMANCE FOR CONTRUCTION MANAGEMENT ASSISTANCE AND ELECTRICAL INSPECTION SERVICES IN SUPPORT OF THE ARRA LIGHTING UPGRADES PROJECT AT THE UNITED STATES COURTHOUSE, 700 STEWART STREET, SEATTLE, WA.
Amount: $70,504
Award Description: CM/CX SERVICES FOR DESIGN-BUILD PROJECT.
Amount: $0
Award Description: PROJECT: ARRA CONTRUCTION MANAGEMENT SERVICES, MULTI-SITES IN SOUTHERN CA THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING CHANGES: 1. THIS IS A NO-COST CHANGE. 2. THIS CHANGE WAS INITIATED BY BOTH GSA AND CONTRACTOR. 3. SPECIFICATION ALTERATION - ADDITION OF A PROJECT ENGINEER FOR THE 4 APSI AWARDED PROJECTS. BASE CONTRACT AWARD NOT TO BE EXCEEDED. POSITION TO BE ADDED VIA A REDISTRIBUTION OF HOURS WITHIN THE CONTRACT. THE DUTIES OF THE PROJECT ENGINEER ARE INCLUDING BUT NOT LIMITED TO: DOCUMENT CONTROL OF ALL SUBMITTALS AND RFIS, TRACK AND PERFORM FOLLOW UP OF SUBMITTALS AND RFI REVIEWS, DEVELOP MEETING NOTES, TRACK AND FOLLOW UP WITH CONTRACTORS REGARDING SECURITY CLEARANCES, ORGANIZE AND LABEL ALL DOCUMENTATION FOR EASE OF ACCESS IN THE FUTURE, VERIFY THAT ALL SUBMITTALS MEET "ARRA BUY AMERICA" REQUIREMENT.
Amount: $74,996
Award Description: CONSTRUCTION MANAGEMENT SERVICES
Amount: $39,980
Award Description: ADDITIONAL PART TIME CM SERVICES FOR THE IMPLEMENTATION OF ENERGY CONSERVATION MEASURES @ US COURT OF APPEALS - 95 7TH STREET- SAN FRANCISCO, CA 94103
Amount: $73,407
Award Description: RECOVERY. AMERICAN RECOVERY AND REINVESTMENT ACT. THIS MODIFICATION IS FOR A TIME EXTENSIUON AS REQUIRED DUE TO THE DELAY EXTENSION PROCESSED ON THE APPLICABLE D/B CONTRACT.
Amount: $327,991
Award Description: CONSTRUCTION MANAGEMENT SERVICES, LPOE, MORGAN, MT
Amount: $240,324
Award Description: RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX
Amount: $79,678
Award Description: RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX ADD PHOTOGRAPHIC RECORDATION SERVICES AND SERVICES OF A FIRE PROTECTION ENGINEER.
Amount: $8,255
Award Description: THIS MODIFICATION IS FOR CONTRACTOR'S OFFICE RENTAL SPACE AND AN INSPECTION SITE VISIT TO THE WINDOW MANUFACTURING COMPANY IN SAINT LOUIS, MISSOURI.
Amount: $871,159
Award Description: RECOVERY: JFK WINDOW REPLACEMENT PROJECT - BOSTON MA. EXTENSION OF CONSTRUCTION MANAGER AS AGENT FROM 9/1/2011 TO 8/31/2012.
Amount: $37,502
Award Description: *RECOVERY* U.S. COURTHOUSE IN BAKERSFIELD, CA. THIS MODIFICATION IS BEING ISSUED TO MODIFY TWO CONSTRUCTION SITE WEB CAMERAS AND UTILITY RELOCATION OF EXISTING UTILITY POLE AND GAS METER TO BE MANAGED BY THE CONSTRUCTION MANAGER AS PER THE PROPOSAL SENT FROM ADVANCED SECURITY TO APSI ON 03/09/2011. 1) TWO CONSTRUCTION SITE WEB CAMERAS $16,502.00 2) MONTHLY MAINTENANCE FOR CONTRACT DURATION $1,000.00 3) PG&E UTILITY RELOCATION $20,000.00 THIS MODIFICATION IS IN THE AMOUNT OF $37,502.00 AS NEGOTIATED AND ACCEPTED ON 03/10/2011. NO TIME EXTENSION WILL BE ADDED TO COMPLETE THIS WORK.
Amount: $0
Award Description: EXTENSION OF CONTRACT COMPLETION DATE TO NOVEMBER 19, 2010.
Amount: $16,728
Award Description: INCORPORATED WARRANTY EVALUATION AND SEASONAL TESTING.
Amount: $16,148
Award Description: ARRA PROJECT - MODIFICATION OF EXTEND PART TIME CONSTRUCTION MANAGEMENT SERVICES UNTIL JUNE 2011.
Amount: $0
Award Description: EXTENSION OF PART-TIME CONSTRUCTION MANAGEMENT SERVICES
Amount: $0
Award Description: ADMINISTRATIVE MODIFICATION TO EXTEND THE PROJECT COMPLETION DATE TO JUNE 30, 2011.
Amount: $0
Award Description: ADMINISTRATIVE MODIFICATION ISSUED TO INCORPORATE CORRECT ARRA FUNDING CODE 4421 INTO ACCTNG. STRING.
Amount: $14,795
Award Description: TASK ORDER MODIFICATION TO EXTEND PART-TIME CONSTRUCTION MANAGEMENT SERVICES AT THE JAMES R. BROWNING U.S. COURTHOUSE - 95 SEVENTH STREET, S.F., CA 94103-1518
Amount: $12,855
Award Description: MODIFICATION FOR ADDITIONAL PART-TIME CONSTRUCTION MANAGEMENT SERVICES.
Amount: $0
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES MULTI-SITES IN SOUTHERN CA THE PURPOSE OF THIS MODIFICATION IS TO DO AN ADMINSTRATIVE CHANGE FOR THE FUNDING ALLOCATION. A $12,000 WILL BE TRANSFER FROM LOS ANGELES USCH (CA0041ZZ)TO ROYBAL FEDERAL BUILDING (CA0283CC). THIS IS A NO COST CHANGE. THE CHANGE WILL NOT EFFECT THE CONTRACT TOTAL PRICE. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $110,614
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES MULTI-SITES IN SOUTHERN CA THE PURPOSE OF THIS MODIFICATION IS AS FOLLOW: 1. THE DELIVERY DATE FOR THE CONTRACT IS EXTEND TO MARCH 31, 2012. THIS ACTION IS GSA PROCUREMENT SYSTEM REQUIREMENT. CONTRACTOR IS STILL REQUIRE TO FOLLOW THE PROJECT SCHEDULE AND AS NEEDED BY PROJECT MANAGERS. 2. TO INCLUDE ADDITIONAL CONSTRUCTION MANAGEMENT SUPPORT FOR THE MONTH OF MARCH THROUGH SEPTEMBER 2011, IN AN AMOUNT OF $110,614.00. THE NUMBER OF WORKING HOURS ARE ESTIMATED. GSA MAY INCREASE OR DECREASE THE NUMBER OF WORKING HOURS WITH NO CHANGE TO THE PER HOURLY RATES. THE FOLLOWING BUILDINGS AND RATES ARE APPLICABLE FOR THIS MODIFICATION: BUILDINGS - USCH LOS ANGELES (CA0041ZZ), ROYBAL FB (CA0283CC), AND CHET HOLIFIED FB (CA0521SS). RATES CONSTRUCTION MANAGER (10% DISCOUNT) -OPTION YR 1 $ 124.75 CONSTRUCTION MANAGER (10% DISCOUNT) -OPTION YR 2 $ 129.74 PROJECT ENGINEER (10% DISCOUNT) -OPTION YR 1 $79.09 PROJECT ENGINEER (10% DISCOUNT) -OPTION YR 2 $82.25 INSPECTOR (10% DISCOUNT) -OPTION YR 1 $78.75 INSPECTOR (10% DISCOUNT) -OPTION YR 2 $81.90 THIS CHANGE WILL BRING THE TOTAL CONTRACT AMOUNT FROM $965,909.00 TO $1,076,523.00. ARRA FUNDED - FROM $933,428 TO $1,044,042. NON ARRA FUNDED - NO CHANGE, $32,481.
Amount: $57,500
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES FOR THE ARRA PROJECTS IN SOUTHERN CA THIS MODIFICATION IS PERTINENT TO THE CAFETERIA BUILD-OUT AT 300 NORTH LOS ANGELES LOCATION. THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE ADDITIONAL CM SERVICES TO THE EXISTING CONTRACT, NOT TO EXCEED AN AMOUNT OF $57,500, WITH THE BELOW APPLICABLE RATES. PROJECT MANAGER: $124.76/HR PROJECT ENGINEER/INSPECTOR: $78.79/HR TO SUM, THIS CHANGE WILL INCREASE THE TOTAL CONTRACT AMOUNT FROM $1,156,499.00 TO $1,219,999.00 ARRA FUNDED: FROM $1,124,018.00 TO $1,181,518.00 NON-ARRA FUNDED: NO CHANGE, $32,481.00 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $0
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES MULTI-SITES IN SOUTHERN CA THE PURPOSE OF THIS MODIFICATION IS TO DO AN ADMINISTRATIVE CHANGE FOR THE FUNDING ALLOCATIONS. A $500 WILL BE TRANSFERRED FROM LOS ANGELES USCH (CA0041ZZ) TO ROYBAL FEDERAL BUILDING (CA0283CC). THIS IS A NO COST CHANGE. THE CHANGE WILL NOT EFFECT THE CONTRACT TOTAL VALUE. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $171,282
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SERVICES, MULTI-SITES IN SOUTHERN CA. THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE AN ADDITION OF A PART-TIME PROJECT ENGINEER AND A FULL-TIME PROJECT INSPECTOR TO THE FOLLOWING BUILDINGS, IN AN AMOUNT OF $171,282.00. CHAMBERS, USCH, PASADENA - $3,426 USCH 312 N. SPRING ST. LOS ANGELES - $34,256.00 ROYBAL FB, 255 E. TEMPLE, LOS ANGELES - $85,641.00 CHET HOLIFIELD FB, 24000 AVILA ROAD - $47,959.00 THIS CHANGE WILL INCREASE THE TOTAL CONTRACT AMOUNT AS FOLLOWS: ARRA FUNDED - FROM $762,146.00 TO $933,428.00 NON-ARRA- NO CHANGE, $32,481.00
Amount: $4,648
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT FOR THE ARRA PROJECTS IN SOUTHERN CALIFORNIA LOCATIONS THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE ADDITIONAL CONSTRUCTION MANAGEMENT HOURS DUE TO THE CHANGES OF THE LIGHTING SCOPE, IN AN AMOUNT OF $4,648.47. - FOR ROYBAL FEDERAL BUILDING: NOT TO EXCEED $1900.43 - FOR CHET HOLIFIED FEDERAL BUILDING: NOT TO EXCEED $2,748.00. THIS CHANGE WILL INCREASE THE CONTRACT TOTAL TASK ORDER PRICE FROM $1,219,999.00 TO $1,218,647.67 ARRA FUNDED: FROM $1,181,518.00 TO $1,186,166.67 NON-ARRA FUNDED: NO CHANGE, $32,481.00 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $79,976
Award Description: PROJECT: ARRA CONSTRUCTION MANAGEMENT SUPPORT MULTI-SITES IN SOUTHERN CALIFORNIA THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE ADDITIONAL CONSTRUCTION MANAGEMENT SUPPORT FOR THE ARRA ENERGY IMPROVEMENT PROJECTS IN SOUTHERN CALIFORNIA, IN AN AMOUNT OF $79,976.00. THE NUMBERS OF WORKING HOURS ARE ESTIMATED. GSA MAY INCREASE OR DECREASE THE NUMBER OF WORKING HOURS WITH NO CHANGE TO THE HOURLY RATES. (1) CONSTRUCTION OF LEED CAFE AT THE LOS ANGELES FEDERAL BUILDING (CA0150CC): WELDING INSPECTOR FOR 320 HOURS AT $78.79 PER HOUR, NOT TO EXCEED $25,213.00 (2) OTHER ARRA ENERGY IMPROVEMENT PROJECTS - CHAMBERS USCH IN PASADENA (CA9551RR): NOT TO EXCEED $459 - LOS ANGELES COURTHOUSE (CA0041ZZ): NOT TO EXCEED $36,417 - ROYBAL FEDERAL BUILDING (CA0283CC): NOT TO EXCEED $11,466 - CHET HOLIFIED FEDERAL BUILDING (CA0521SS): NOT TO EXCEED $6,421. THIS CHANGE WILL BRING THE TOTAL CONTRACT AMOUNT FROM $1,076,523.00 TO $1,156,499.00 ARRA FUNDED: FROM $1,044,042.00 TO $1,124,018.00 NON-ARRA: NO CHANGE, $32,481.00 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $1,200
Award Description: MECHANICAL ENGINEERING SUPPORT
Amount: $2,500
Award Description: MECHANICAL ENGINEERING SUPPORT
Amount: $268,320
Award Description: MECHANICAL ENGINEERING SERVICES
Amount: $0
Award Description: NO COST TIME EXTENSION
Amount: $37,964
Award Description: ADDITIONAL CM SERVICES DUE TO ADDITIONAL CISTERN INSTALLATIONS BY CONSTRUCTION CONTRACTOR ALLEN BRADBURY CONSTRUCTION (ABC)
Amount: $0
Award Description: EXTEND CONTRACT SERVICES TO AGREE WITH CONSTRUCTION PERFORMANCE PERIOD
Amount: $0
Award Description: PSC CORRECTING MOD
Amount: $52,717
Award Description: ADDITIONAL CM/CX SERVICES AND CORRECTED COMPLETION DATE TO INCLUDE APRIL 01, 2012
Amount: $2,061
Award Description: ADDITIONAL CM HOURS
Amount: $45,879
Award Description: THIS MODIFICATION IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE FOR A PERIOD OF 50 DAYS.
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY - OTHER FUNCTIONS, SENIOR CONTRACT MANAGEMENT SERVICES, DENVER SERVICE CENTER, LAKEWOOD, COLORADO. THIS MODIFICATION IS TO EXTEND THE COMPLETION DATE TO OCTOBER 31, 2012. THIS IS A NO COST MODIFICATION.
Amount: $0
Award Description: RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX REVISE CONTRACT COMPLETION DATE
Amount: -$478
Award Description: RECOVERY: NEW U.S. COURTHOUSE IN AUSTIN, TX DEFINITIZE MODIFICATION TO EXTEND CMA SERVICES.
Amount: $431,015
Award Description: RECOVERY: JOHN F. KENNEDY FEDERAL BUILDING WINDOW REPLACEMENT PROJECT - BOSTON MA, IS HEREBY MODIFIED AS FOLLOWS: CONSTRUCTION MANAGER AS AGENT CONTRACT EXTENSION FROM SEPTEMBER 1, 2012 TO DECEMBER 31, 2012; INCLUSIVE OF PROJECT MANAGEMENT AND INSPECTION SERVICES REGARDING ABATEMENT PERFORMED BY OTHERS.
Amount: $0
Award Description: THIS MODIFICATION DEOBLIGATES $320,460 FROM LINE ITEM 0004 FOR THE DELETION OF A PM FROM 3/1/2012 THRU 8/31/2012 (DUE TO RELOCATION) AND $65,974 FROM LINE ITEM 0005 FOR THE DELETION OF A FIELD ADMINISTRATION CLERK FROM 1/1/2012 THRU 8/31/2012. $188,782 IS REOBLIGATED TO LINE ITEM 0007 FOR A CONSTRUCTION MANAGER AS REFERENCED IN LINE ITEM 0004 FROM 3/1/2012 THRU 8/31/2012, $158,468 TO LINE ITEM 0008 FOR A PROJECT MANAGER/CLAIMS ANALYST AND FIELD ENGINEER FROM 3/1/2012 THRU 8/31/2012. LINE ITEM 0009 IDENTIFIES THE NEED FOR A PCB INSPECTOR AND TESTING/SAMPLING FOR $39,184.
Amount: $0
Award Description: PZ MOD TO VERIFY CO IS CORRECT. SEE VISTA GIFFORD EMAIL ENTITLED COMPRIZON CLEAN UP PROJECT DATED MAY 31, 2012.
Amount: $0
Award Description: CORRECTION LINE ITEM DESCRIPTION
Amount: $0
Award Description: PROJECT: NON-ARRA CONSTRUCITON MANAGEMENT SUPPORT FOR THE ARRA PROJECTS IN SOUTHERN CALIFORNIA, MULTI-SITES THE PURPOSE OF THIS MODIFICATION IS TO DO AN ADMINISTRATIVE CHANGE FOR THE FUNDING ALLOCATIONS. AN AMOUNT OF $7,780.50 WILL BE TRASNFERRED FROM CLIN 0013 LOS ANGELES FB (CA0150CC) TO CLIN 0014 LOS ANGELES USCH (CA0041ZZ). THIS CHANGE WILL DECREASE CLIN 13 FROM $22,500 TO $14,719.50 THIS CHANGE WILL INCREASE CLIN 0014 FROM $22,500 TO $30,280.50 THIS IS A NO COST CHANGE. THE CHANGE WILL NOT EFFECT THE TASK ORDER TOTAL VALUE. PLEASE NOTE: THIS MODIFICAITON IS NOT FUNDED BY THE RECOVERY ACT. PLEASE TRACK AND INVOICE SEPARATELY FROM THE ARRA FUNDED WORKS. DO NOT INCLUDE THIS MODIFICATION INTO THE ARRA FEDERAL REPORTING. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE CM SERVICES FOR THE NEW U.S. COURTHOUSE LOCATED IN BAKERSFIELD, CA. $115,778.00 WILL BE MOVED FROM THE CONSTRUCTION CLOSEOUT PHASE SERVICES TO THE CONSTRUCTION PHASE SERVICES LEAVING A TOTAL OF FOUR DOLLARS ($4.00) IN THE CONSTRUCTION CLOSEOUT PHASE SERVICES. THE CONSTRUCTION PHASE SERVICES WILL BE EXTENDED FROM 04/30/2012 TO 07/15/2012. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT REMAINS THE SAME AT $2,130,426.00.
Amount: $9,175
Award Description: THIS MODIFICATION IS ISSUED TO ADD FUNDS FOR THE PERIOD OF PERFORMANCE EXTENSION.
Amount: $0
Award Description: RECOVERY: CONTRACT NO. GS-23F-0054S/GS-P-01-10-BZ-0008 JOHN F. KENNEDY FEDERAL BUILDING WINDOW REPLACEMENT PROJECT - BOSTON MA, IS HEREBY MODIFIED AS FOLLOWS: CONSTRUCTION MANAGER AS AGENT CONTRACT EXTENSION FROM DECEMBER 31, 2012 TO APRIL 30, 2013.
Amount: $0
Award Description: PROJECT: NON-ARRA CONSTRUCITON MANAGEMENT SUPPORT FOR THE ARRA PROJECTS IN SOUTHERN CALIFORNIA, MULTI-SITES THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 12/31/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES.
Amount: $79,107
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE CLOSE OUT PHASE SERVICES FOR THE CONSTRUCTION MANAGER AS DEFINED IN THE BASIC SCOPE OF WORK FOR THE NEW U.S. FEDERAL COURTHOUSE LOCATED IN BAKERSFIELD, CA. THE BASE CONTRACT INCLUDED CLOSE OUT PHASE SERVICES INCLUDING COLLECTION OF FINAL PROJECT DOCUMENTATIONS, TRAINING FOR THE PROPERTY MANAGER ON CONSTRUCTION METHODS IN THE PROJECT, SECURING CLOSE OUT DOCUMENTS AND RELATED ACTIVITIES. THE DESIGN-BUILD CONSTRUCTION CONTRACT WAS DELAYED AND PROVIDED TIME EXTENSION WHICH REQUIRED THE CM CONTRACT TO BE EXTENDED AS WELL. SINCE ARRA PROJECTS DID NOT HAVE CONTINGENCY, THE FUND SOURCE FOR EXTENDING CM SERVICES WAS SECURED BY DEDUCTING FROM CLOSE OUT PHASE SERVICES ALREADY ON CONTRACT. SINCE THAT OSTENSIBLY DELETED THE SERVICE AT THE TIME, THE NEED FOR CLOSE OUT PHASE IS STILL VALID AND ESSENTIAL TO SUCCESSFUL CLOSE OUT AND TURNOVER OF THE BUILDING TO THE PROPERTY MANAGER. THIS MODIFICATION IS IN THE AMOUNT OF $79,107.60 AS NEGOTIATED AND ACCEPTED AND AN EXTENSION OF 65 DAYS IS ADDED TO THE CONTRACT. THE 65 DAYS WILL COMMENCE UPON RECEIPT OF THE CONTRACTING OFFICER'S SIGNED SF30. THE CURRENT TOTAL AMOUNT OF THIS CONTRACT IS $2,209,533.60. IN CONSIDERATION OF THIS MODIFICATION AGREED TO HEREIN AS A COMPLETE AND EQUITABLE ADJUSTMENT OF BOTH COST AND TIME FOR THE WORK INCORPORATED IN THIS CHANGE, THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY FURTHER LIABILITY UNDER THIS CONTRACT FOR ANY ADDITIONAL EQUITABLE ADJUSTMENT ATTRIBUTABLE TO THE CIRCUMSTANCES GIVING RISE TO THIS MODIFICATION.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 21
City TRAVIS
County TRAVIS
State TX
Zip 78701