contract- RECIPIENT AWARD SUMMARY
GRUNLEY CONSTRUCTION COMPANY INCORPORATED
| AWARD OVERVIEW |
|
Agency Name: General Services Administration |
Project Location:
DISTRICT OF COLUMBIA |
|
Award Number: GS11P10MKC0061 |
Project Location - State: DC |
|
Funding Amount:
$52,278,000 |
Project Location - Zip Code: 205710001 |
|
Ending Date:
2014-04-30 |
Congressional District: 00 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
GRUNLEY CONSTRUCTION COMPANY INCORPORATED |
|
Recipient Address:
|
5010 NICHOLSON LANE, SUITE I |
|
Recipient City:
|
ROCKVILLE |
|
Recipient State:
|
MD |
|
Recipient Zip Code:
|
208523108 |
|
Congressional District:
|
MD-08 |
DESCRIPTION OF WORK/SERVICE PERFORMED
RECOVERY ACT - TAS::47 4543::TAS
GENERAL CONSTRUCTION SERVICES FOR THE LAFAYETTE BUILDING MODERNIZATION PROJECT WHICH IS A GSA MODERNIZATION OF AN APPROXIMATELY 565,000 GROSS SQUARE FOOT EXISTING OFFICE BUILDING, INCLUDING BUT NOT LIMITED TO A TOTAL REFURBISHMENT OF THE EXTERIOR FA¦ADE AND WINDOWS, REPLACEMENT/UPGRADE OF INTERIOR FINISHES, PRESERVATION OF SIGNIFICANTLY HISTORIC FEATURES AND UPGRADE OF ALL BUILDING MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, INCLUDING PHYSICAL BUILDING SECURITY SYSTEMS.
| Other Awards |
Amount:
$16,575,000
Award Description: TAS:00:0000:000 ARRA - USDA SOUTH BUILDING MODERNIZATION, PHASE-4A - BASE BID |
Amount:
$8,500,000
Award Description: TAS::47 4543::TAS
*RECOVERY* THIS MOD IS TO EXERCISE OPTION 1, PHASE 2, ALTERNATE 7. PROVIDE ALL LABOR AND MATERIALS FOR LESSONS LEARNED IN PHASE 1. PROVIDE ALL LABOR AND MATERIALS FOR PRICING ESCALATION AND LATE START OF PHASE 2. REPLACE THE GSAM CLAUSE 552.232-70. |
Amount:
$0
Award Description: TAS::47 4543::TAS
THIS MODIFICATION CORRECTS THE FUND CITE FOR LINE ITEM 0056 DUE TO THE PROJECT NUMBER BEING INADVERTENTLY ENTERED INCORRECTLY:
FROM: PN5N04087.2009.4429.11.PG03.P1140001.954.PG413.VDC01049.DC0033ZZ.221
TO: PN5N04087.2009.4429.11.PG03.P1140001.954.PG413.LDC01049.DC0033ZZ.221 ARRA::YES::ARRA |
Amount:
$34,914,000
Award Description: TAS::47 4543::TAS
(EXERCISE OPTION 1 PHASE 2 FOR CONSTRUCTION SERVICES FOR THE MARY E. SWITZER BUILDING MODERNIZATION PROJECT) ARRA::YES::ARRA |
Amount:
$34,034,795
Award Description: TAS::47 4543::TAS MODIFICATION TO EXERCISE OPTION 4 AND SELECTED OPTIONS, UNDER THE MAJOR RENOVATION OF DOI MAIN BLDG, WASH., DC |
Amount:
$144,081
Award Description: SUPPLEMENTAL AGREEMENT INCORPORATING UNFORESEEN ISSUES MOSTLY STRUCTURAL STEEL |
Amount:
$33,692
Award Description: MULTIPLE RFIS RESPONSES 96, 97, 106, 125, 100, 134, 140, FINALIZE 127, 128, 130. ISOLATION VALVES AND HAND DRYERS |
Amount:
$129,322
Award Description: REVISED FIRE ALARM, ATTIC PIPE RE-ROUTING, CHILLER BYPASS, AND STRUCTURAL LOAD TEST |
Amount:
-$27,498
Award Description: USDA SOUTH BUILDING MODERNIZATION, PHASE-4A - BASE BID |
Amount:
$59,178
Award Description: SUPPLEMENTAL AGREEMENT INCORPORATING ADDITIONAL WORK RESULTING FROM RFI RESPONSES |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS BEING ISSUED TO REPLACE THE CONTRACTOR+S PROJECT MANAGER. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY CONSTRUCTION SERVICES FOR THE U.S. CUSTOM HOUSE ENVELOPE RENOVATION PROJECT. U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106-2912. MODIFICATION PS02 INCORPORATES INCORPORATES INTO THE CONTRACT GSAR 552.243-71 EQUITABLE ADJUSTMENTS (JAN 09). THIS CLAUSE REPLACES GSAR 552.243-71 (APR 84). |
Amount:
$23,857,000
Award Description: TAS::47 4543::TAS. RECOVERY CONSTRUCTION SERVICES FOR THE U.S. CUSTOM HOUSE ENVELOPE RENOVATION PROJECT. U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106-2912. |
Amount:
$107,070
Award Description: TAS:: 47 4543::TAS. RECOVERY CONSTRUCTION SERVICES FOR THE U.S. CUSTOM HOUSE ENVELOPE RENOVATION PROJECT. U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106-2912. MODIFICATION PS03 INCORPORATES A BOILER FEEDWATER UNIT TO SUPPLEMENT THE ENERGY EFFICIENT BOILER REPLACEMENT ALREADY INCORPORATED INTO THE PROJECT. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY CONSTRUCTION SERVICES FOR THE U.S. CUSTOM HOUSE ENVELOPE RENOVATION PROJECT. U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106-2912. MODIFICATION PS01 INCORPORATES NOTICE TO PROCEED AND GOVERNMENT DELEGATIONS FOR THIS CONTRACT. |
Amount:
$0
Award Description: RECOVERY CONSTRUCTION SERVICES FOR THE U.S. CUSTOM HOUSE ENVELOPE RENOVATION PROJECT. U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA PA 19106-2912. MODIFICATION PA05 INCLUDES AN ADMINISTRATIVE ACTION TO UPDATE THE APPROPRIATE HIGH PERFORMANCE GREEN BUILDING ACCOUNTING CODES FOR THIS PROJECT. |
Amount:
$212,700
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT, IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE'S 505, 506, 512, 513, 519 AND 520 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
-$42,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO THE CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 522, CE 526, AND CE531 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$4,759,926
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE551, SITE GREENING(HPGB) IMPROVEMENTS IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$7,897,674
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR HIGH PERFORMANCE GREEN BUILDING(HPGB) UPGRADES IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$45,000
Award Description: TAS::47 4543::TAS
*RECOVERY* THIS MODIFICATION IS A PDL THAT ESTABLISHES NTE PRICES FOR CE503,CE504,CE505,CE506,CE507 FOR THE MARY E. SWITZER MODERNIZATION PROJECT |
Amount:
$122,450
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE504, CE507, CE510, CE514, AND CE524 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$56,500
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE518, 1ST FLOOR LEVELING, AND CE525, 1ST AND 6TH FLOOR SLAB INFILLS, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT.
|
Amount:
$700,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT, IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE92R, PHASE II BLAST WINDOWS, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$340,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE534, PLASTERWELD, MESH, AND SKIM COAT FINISHING, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT.
|
Amount:
$36,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT, IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE'S 509, 511, 515, 516, AND 521 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$21,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE527, DRY SPRINKLER RECONNECT TO FIRE ALARM, AND CE533, REPAIR 6TH FLOOR THERMAL JOIST IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT.
|
Amount:
$850,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE560, UPPER LEVEL BLAST SKYLIGHT UPGRADES TO THE WEST AND CENTER OF THE MARY E. SWITZER BUILDING |
Amount:
$5,957,000
Award Description: "RECOVERY ACT" TAS::47 4543::TAS
THIS MODIFICATION IS FOR PREPARATION OF EXISTING ROOF MEMBRANE/FLASHING AT DIFFERENT ELEVATIONS, AND ADDITION OF INTENSIVE AND EXTENSIVE GARDEN ROOF SYSTEM AS OUTLINED IN DRAWINGS AND SPECIFICATIONS. |
Amount:
$4,596,000
Award Description: "RECOVERY ACT" TAS::47 4543::TAS
THE PURPOSE OF THIS MODIFICATION IS TO ADD BUILDING EXTERIOR CLEANING, AND STONE REPAIRS PER ASSOCIATED DRAWINGS AND SPECIFICATIONS. |
Amount:
$2,000,000
Award Description: "RECOVERY ACT" TAS::47 4543::TAS
THE PURPOSE OF THIS MODIFICATION IS TO ADD EXTERIOR WATERPROOFING WORK AT WINGS 1,2,5 AND 6 PER ASSOCIATED DRAWINGS AND SPECIFICATIONS. |
Amount:
$321,000
Award Description: "RECOVERY ACT" TAS::47 4543::TAS
THE PURPOSE OF THIS MODIFICATION IS TO ADD MAINTENANCE OF EXISTING BOLLARD SYSTEM AND NEW ELECTRICAL BOLLARD SYSTEM DURING CONSTRUCTION PERIOD OF 24 MONTHS. |
Amount:
$3,440,000
Award Description: "RECOVERY ACT" TAS::47 4543::TAS
THE PURPOSE OF THIS MODIFICATION IS TO ADD REPLACEMENT OF BOLLARD SYSTEM PER ASSOCIATED DRAWINGS AND SPECIFICATIONS. |
Amount:
$34,464,600
Award Description: TAS::47 4543 001::TAS RECOVERY: ADAPTIVE REUSE OF VARIOUS BUILDINGS, ST. ELIZABETH WEST CAMPUS, WASHINGTON, DC |
Amount:
$22,072,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
THIS MODIFICATION AWARDS OPTION 2 WITH PLA. OPTIONS 2A AND 2B ARE EXERCISED. |
Amount:
$3,596,819
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CONTRACT IS MODIFIED TO INCLUDE UNIT PRICES AND ALLOWANCE FOR INTERIOR SPACE RECONFIGURATION, HVAC DUCT REPLACEMENT, ADDITIONAL PROJECT REQUIREMENTS, AND SITE STAGING AND LOGISTICS. |
Amount:
$52,278,000
Award Description: RECOVERY ACT - TAS::47 4543::TAS
GENERAL CONSTRUCTION SERVICES FOR THE LAFAYETTE BUILDING MODERNIZATION PROJECT WHICH IS A GSA MODERNIZATION OF AN APPROXIMATELY 565,000 GROSS SQUARE FOOT EXISTING OFFICE BUILDING, INCLUDING BUT NOT LIMITED TO A TOTAL REFURBISHMENT OF THE EXTERIOR FA¦ADE AND WINDOWS, REPLACEMENT/UPGRADE OF INTERIOR FINISHES, PRESERVATION OF SIGNIFICANTLY HISTORIC FEATURES AND UPGRADE OF ALL BUILDING MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, INCLUDING PHYSICAL BUILDING SECURITY SYSTEMS. |
Amount:
$75,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CONTRACT IS MODIFIED TO INCLUDE THE FOLLOWING CHANGES: CE#4008/G2525 DUCT RISERS FED FROM AHU-CRW, CE#4021/G2514 PARTITION REVISION FROM P2 TO P1 AT COLUMN LINE 32 FOR 6E, 7E & 7W, CE#4022/G2489 SECURITY CAMERA POLE, WING 2 WEST PLANTER BOX, CE#4023/G2539 STREET HYDRANT IN WING 3 EAST, ACCESSIBLE EGRESS, CE#4026?G2585 RISER CONFLICTS IN COFFEE ROOM FOR R10, W308 & S309, CE#4027/G2557 SCH8 & HW8 CONFLICT IN BASEMENT, CE#4028/G2618 AIR SIGNAGE AT PENTHOUSE LEVEL, STAIR 21A, CE#4030/G2620 VAT ADHERING TO CARPET, MUSEUM ROOMS 1238N, 1238M & 1238P, CE#4033/G2648 CARPET ADHERING TO UNFORESEEN CORK FLOORING, ROOM 7238, AND CE#4035/G2650 CARPET ADHERING TO UNFORESEEN VAT, ROOM 3238. |
Amount:
$21,550
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CONTRACT IS MODIFIED TO INCLUDE THE FOLLOWING CHANGES; CE#4009/G2478 ELEVATOR PIT GROUP C WATER, CE#4101/G2488 EXISTING TREE IN WING 2 EAST PLANTER BOX, CE#4011/G2540 EXISTING PRV STATION & CONDENSATE LINES CONFLICT WITH NEW PIPING, M-LEVEL, CE#4012/G2524 DRINKING FOUNTAIN LOCATED IN PENTHOUSE 1, CE#4013/G2550 GOVERNMENT STORED MATERIALS, WING 2 MECHANICAL LEVEL, CE#4015/G2563 LIGHTS IN B000A UNDER GRAND STAIRCASE, CE#4016/G2559 AIR SUPPLY TO WING 2 BASEMENT DURING CONTINUED OCCUPANCY, CE#4017/G2533 SOUTH PENTHOUSE OCCUPANCY THROUGH APRIL 2010, CE#4018/G2513 ACCESS TO ROOM 6026, CE#4019/NO G OCCUPIED GOVERNMENT SPACES, WING 2 BASEMENT WEST, AND CE#4020/G2515 ANSEL ADAMS IMAGES, FLOORS 1 & 2; PAINTINGS, BASEMENT & FLOOR 7. |
Amount:
$0
Award Description: RECOVERY ACT
TAS::47 4543::TAS
MODIFICATION TO TRANSFER CONTRACTING OFFICER AUTHORITY FROM VINCENT E. MATNER TO CHRISCHANDA S. SMITH. |
Amount:
$3,327,000
Award Description: RECOVERY ACT -
TAS::47 4543::TAS
CONTRACT IS MODIFIED TO INCLUDE PROJECT LABOR AGREEMENT.
|
Amount:
$8,900
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE557 AND CE558 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$99,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE FOR CE 530, AND CE 517 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$51,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 535, AND CE 553 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION
|
Amount:
$12,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE548, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION. |
Amount:
$749,000
Award Description: TAS:: 47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED PDL MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 583, LANDSCAPING IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT |
Amount:
$0
Award Description: TAS::47 4543::TAS
"RECOVERY"
THE PURPOSE OF THIS MODIFICATION IS TO ADD LANGUAGE TO LINE ITEM 76 OF THIS CONTRACT IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$42,500
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE542 AND CE543, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$12,000
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE538 AND CE540, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$160,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 564 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION
|
Amount:
$35,500
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE FOR CE 545, AND CE 547 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION
|
Amount:
$9,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 562, AND CE 563 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION
|
Amount:
$23,750
Award Description: TAS::47 4543::TAS
"RECOVERY"
THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIALS, AND EQUIPMENT FOR CE536 AND CE537, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$12,700
Award Description: TAS::47 4543::TAS
+RECOVERY+ + THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 555, AND TO DEFINITIZE CE 503 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION
|
Amount:
$15,599,764
Award Description: RECOVERY: PHASE 1B ADAPTIVE REUSE 6 BLDGS. @ THE ST. ELIZABETH WEST CAMPUS IN WASHINGTON, D.C.. |
Amount:
$199,104
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE OPTION 4 PRICING WHICH WAS PREVIOULY AWARDED VIA MOD POR1. |
Amount:
$123,750
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CE4102 / G2796 CONFLICTS DUCT RISERS WITH TELECOM RISERS AT WING 2 WEST , CE4103 / G2833 FLASHING AND LANDING ELEVATION AT ROOF STAIRS 20&23, CE4111 / G2674 DEMOLITION OF CEILING IN ROOM 7238, CE4185 / G2878.1 HOT WATER RETURN PUMP AND ROOM SPACE HEATER FOR ROOM B104, CE4193 / G3040 SHAFT WALL TO CONCEAL EXHAUST DUCT IN CLOSET OF ROOM
6212, CE4196 / G3055 ENCLOSURE FOR DUCT RISERS RA/2WA, RF/2WA2 AT CL 30 AND MM, CE4201 / G3056 FREIGHT VESTIBULE FLOORING EAST CORRIDOR, CE4202 / G3034 CORRIDOR RETURN RISER RA/2WB AT 2ND FLOOR, CE4203 / G3048 DUCTWORK DEMOLITION IN BASEMENT WEST CORRIDOR B201B, CE4204 / G3052 CONDENSATE DRAIN FOR R/6 RISER LOCATED IN WING 1, CE4205 / G3075 WING2 CARPET ADHESIVE AND INSTALLATION, CE4210 / G3077 EXISTING SINK PLUMBING NOT ON DRAWINGS FLOOR 2 WEST, CE4212 / G3035 NEW SUPPLY GRILLE AT FLOOR 1 WEST LOCATED IN EXISTING MARBLE, CE4213 / G3069 UNFORESEEN ACM INSULATED PIPES FLOOR 2 WING 2 WEST, CE4214 / G3085 SHOWER BASINS BASEMENT WEST TOILET ROOMS, CE4221 / G3106 FOOTING IN CONFLICT WITH FLOOR DRAIN ROOM B103H, CE4184 / G2678.2 EXPANSION TANK MAKE UP WATER PIPING. |
Amount:
$72,500
Award Description: RECOVERY ACT MODIFICATION
TAS::47 4543::TAS
CONTRACTOR TO ADD THE FOLLOWING SCOPE OF WORK:
CE #4119 / G2872 EXISTING LOUVERS IN CONFLICT WITH PAINTING COOLING TOWER GRILLES; CE4160 / G2848 WING 2 - 1ST FLOOR WEST MECHANICAL CONFLICTS; CE #4168 / G2987 UNFORESEEN VAT IN 1 WEST ROOMS 1240, 1024, AND 1028A; CE #4149 / G2914 DEMOLITION OF FAN F27-14 REQUIRED TO INSTALL FAN TR-3; CE #4150 / G2915 CONDENSATE LINES FOR AHUS IN ELEVATOR MACHINE ROOMS; CE #4151 / G2916 DEMOLITION OF UNFORESEEN EXISTING UNITS IN THE MUSEUM AND BASEMENT WEST; CE #4152 / G2890 PACM AT MUSEUM PERIMETER WALLS AND CONFLICTS WITH MEP DEMOLITION; CE #4162 / G2913 CONFLICTS WITH INSTALLATION OF OA/12; AND CE#4166 / G2908 PCBS IN TRANSFORMER ROOM B103D. |
Amount:
$34,000
Award Description: RECOVERY ACT MOD |
Amount:
$0
Award Description: TAS::47 4543::TAS
THIS MODIFICATION IS FOR INTERNAL/COMPRIZON PURPOSE ONLY TO CORRECT THE ACCOUNTING STRING FOR MOD PCAY. |
Amount:
$19,250
Award Description: RECOVERY ACT
TAS::47 4543::TAS
REFERENCE: DOI GC SERVICES
CE#4024/G2627 EMERGENCY EGRESS FOR WING 2 BASEMENT AT STAIR 22, CE#4029/G2583 FAN FOR TOILET EXHAUST LOCATED IN WING 1 WEST, CE#4036/G2612 CLARIFICATION OF M-LEVEL EAST HVAC PIPE SIZES, CE#4037/G2656 PACM IN SHAFT ADJACENT TO JANITOR CLOSET ROOMS 6235 & 7235, CE#4039/G2641 FAN SIZE REQUIREMENTS FOR WING 2, CE#4040/G2669 DEMOLITION OF CHASE WALL AT COLUMN LINE SS/27 IN MUSEUM, CE#4043/G2608 STAIR 23 CHANGE (BULLETIN 5-4), CE#4044/G2571 VAT WING 2 EAST STAIR 20 ROOF DRAIN, CE#4045/G2665 STAIR BARRIER RAILS AT STAIRWELLS 21 & 22, AND CE#4046/G2668 CROWN MOLDING SALVAGE FOR DEMO OF CHASE WALLS. |
Amount:
$39,300
Award Description: RECOVERY ACT MOD
TAS:: 47 4543::TAS
CE#4115/G2881 ROOM 3063 WATER DAMAGE TO BULKHEAD AND PERIMETER WALL; ADD: $4,500
CE#4141/G2883.1 BRICK MISSING FROM 5 WEST ENCLOSURE AT CL PP/32 AND CL PP/29; ADD: $3,000
CE#4137/G2876 PANELS FED FROM SWITCHGEAR 4; ADD: $4,000
CE#4142/G2861.1 EXISTING EXHAUST DUCT IN GARAGE B; ADD $5,500
CE#4143/G2856 PACM CONFLICT WITH EXISTING BEAM ALONG COLUMN LINE 30 AT ROOF LEVEL STAIRS 20 AND 23; ADD: $5,000
CE#4118/G2849 WING 2 SECOND FLOOR WEST MECHANICAL CONFLICTS; ADD: $10,000
CE#4117/G2846 CONDENSATE LINE FOR AHU-2E ; ADD: $10,000 |
Amount:
$38,500
Award Description: TAS::47 4543::TAS
RECOVERY ACT
CONTRACTOR TO ADD THE FOLLOWING SCOPE OF WORK:
CE #4164 / G2967 UNFORESEEN EXISTING WOOD BASE AT WING 2 FLOOR 6; CE #4165 / G2960 VISUAL DISPLAY BOARDS IN COFFEE ROOMS; CE #4167 / G2988 UNFORESEEN ACM CEILING IN WOMEN'S ROOM 1240; CE #4169 / G2977 FINISH FOR NEW ACCESSIBLE TOILET ROOM 1230; CE #4174 / G2980 EXHAUST GRILLE TER-5 IN ROOM B259; CE #4175 / G2999 M LEVEL DISMANTLING OF TEMPORARY DUCTWORK TAPS; AND CE #4097 / G2793&2793.1 CONFLICTS WITH RIBS AND URINALS FLOORS 2 THRU 7. |
Amount:
$69,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CE#4183 / G3005 UNFORESEEN ACM IN BASEMENT WEST ROOMS B024, B026, AND B026A, CE#4191 / G3033 UNFORESEEN VAT IN ROOMS 7026 AND 4022, CE#4189 / G3036 EXISTING CROWN MOULDING AND CHAIR RAIL IN ROOM B243, CE#4188 / G3039 DEMOLITION REQUIRED AT DOOR 4229D, CE#4192 / G3041 GRILLES AT CEILINGS OF TELEPHONE ALCOVES 2019 AND 1019, CE#4190 / G2982 FIRE DAMPERS AT TOILET ROOMS B242A AND B039, CE#4182 / G2620.1 VAT ADHERING TO CARPET AND BROWN SUBFLOORING IN MUSEUM (REVISED CHANGE ORDER), CE#4052 / G2611&G2611.1 ROOM B3261 COMPLETION FOR OCCUPANCY ABATE LOOSE ACM, AND CE#4059 / G2721 SANITARY RISER S/310 AT EAST PENTHOUSE ROOF. |
Amount:
$2,466,000
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CONTRACT IS MODIFIED TO INCLUDE CURRENT NEEDS FUND. |
Amount:
$24,500
Award Description: TAS::47 4543::TAS
RECOVERY ACT
CONTRACTOR TO ADD THE FOLLOWING SCOPE OF WORK:
CE #4147 / G2928 M LEVEL DOORS M207B IN CONFLICT WITH EXISTING CABLE TRAYS; CE #4148 / G2918 CEILING HEIGHT&ROOF DRAIN PIPING AT STAIRS 20&23; CE #4153 / G2932 INSULATION FOR ACTIVE STEAM MAIN IN W2 EAST AND LOOSE DEBRIS IN FLOOR 1 TOILET CHASES; CE #4154 / G2921 EXISTING CONDITIONS OF ELEVATOR CAB 25; CE #4155 / G2927 HARDWARE REVISIONS FOR DOORS 4027A AND 3256A; CE #4156 / G2949 UNFORESEEN TERRA COTTA AT FACADE OF NEW STAIRS 20 AND 23; CE #4161 / G2963 CHASE FOR OUTSIDE AIR DUCTWORK AT CL 30&SS AT FLOORS 3 THRU 5; CE #4163 / G2965 CONCRETE BASE AT PERIMETER SHAFTS OF WING 2 DOGLEG OFFICES. |
Amount:
$292,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CE4206 / G2821.1 WING 2, FIRST FLOOR EAST - ADDITIONAL LEAD ABATEMENT, CE4207 / G2821.3 ABATEMENT OF ACOUSTICAL PLASTER CEILINGS, CE4062 / G2714&G2714.1 CONFLICTS IN SOUTH PENTHOUSE BATHROOMS P1206 AND P1209/URINAL VENT IN PENTHOUSE BATHROOM P1209, CE4064 / G2746 ROOF DRAIN CONCERN AT WESTERN END OF WING 2 WEST ROOF / NEW STAIR 23, CE4065 / G2730 FINISH AND ABATEMENT NOTES, CE4120 / G2730.1 FINISH AND ABATEMENT NOTES, CE4068 / G2716 EMERGENCY SHOWER AND CLEANING CHEMICAL STATION IN ROOM B260, CE4072 / G2782 AUTOMATIC DOOR OPERATORS FOR WING 2, CE4081 / G2798 INSTALLATION OF NIGHT SETBACK THERMOSTATS, CE4085 / G2733 WING 2 DIFFERING SITE CONDITIONS, AND CE4208 / G2673, G2673.1, G2673.2, G2673.3, G2673.4, G2673.5, G2673.6, G2673.7, G2673.8, G2673.9, G2673.10, G2673.11 AND G2673.12 SPRINKLER AND BULKHEAD CONFLICTS AT 1W, 2E, 2W, 3E, 3W, 4E, 4W, 5E, 5W, 6E, 6W, 7E AND 7W. |
Amount:
$26,300
Award Description: RECOVERY ACT MODIFICATION
TAS::47 4543::TAS
CONTRACTOR TO ADD THE FOLLOWING SCOPE OF WORK: CE4082 / G2720, G2720.1 AND G2720.2 VENT PIPING BEHIND PENTHOUSE MURALS (G2720)&ADDITIONAL BULKHEAD TO CONCEAL VENT PIPING, CONFLICT WITH SPRINKLER PIPING AT 7 EAST (G2720.1) AND CONFLICT WITH VENT PIPING AT COLUMN LINE D/29 (G2720.2); CE #4089 / G2726 RETURN RELIEF RISERS FOR STAIR 20 AT WING 2 EAST; CE #4096 / G2795 AND G2795.1 RETURN/RELIEF DUCT SHAFTS @CL MM/30&31 FOR FLOORS 3 THROUGH 7 AT W2 WEST AND PIPING, IN LIEU OF THE CONTRACT INSTALLATION; CE #4094 / G2771 AND G2771.1 7 WEST RAIN LEADER AND RAIN LEADER ARE STAIR 23; AND CE #4158 / G2883.2 BRICK MISSING FROM 3 EAST ENCLOSURE AT CL P&32. |
Amount:
$38,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES TO PERFORM THE WORK DESCRIBED IN THE ATTACHED SCOPE OF WORK, CE#4101, 4123, 4124, 4122, 4125, 4126, 4127, AND 4130. THE FINAL SETTLEMENT OF COSTS FOR PCAW WILL BE NEGOTIATED AND DEFINITIZED VIA CONTRACT MODIFICATION TO REFLECT THE FINAL TOTAL COST. |
Amount:
$108,790
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$44,812
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$27,739
Award Description: TAS::47 4543::TAS. REVOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$1,915
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$236,012
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$20,700
Award Description: TAS::47 4543::TAS.RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFIFCATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS AN ADMINISTRATIVE ACTION. |
Amount:
$75,497
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR KNOWN WORK NEEDED, THAT IS WITHIN SCOPE. |
Amount:
$4,972
Award Description: TAS::47 4543::TAS.RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$407,899
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$162,710
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT REGARDING THE SUBSTITUTION OF THE ROOFING SUBCONTRACTOR FOR THE PROJECT. |
Amount:
$18,047
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$10,379
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITH THE SCOPE OF THE PROJECT. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$41,808
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$382,134
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$161,650
Award Description: TAS::45 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION IS TO PROVIDE FOR CE 571, AND CE 580 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION |
Amount:
$6,050
Award Description: RECOVERY ACT MODIFICATION TO EXISTING CONTRACT
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 569, REPLACING DEMOLISHED PORTION OF EXISTING THE EXISTING-TO-REMAIN BEAM AND PROVIDING CIP BEAM TO STAL CONNECTION. ALSO, CE 570, PROVIDING SLAB INFILSS TO FILL GAP AT OURSIDE EDGE OF EACH ROUGH WINDOW OPENING. |
Amount:
$24,850
Award Description: RECOVERY ACT MODIFICATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND SUPPLIES FOR CE 567, RELOCATING MECHANICAL ROOM 1102 DUCT SPRINKLER, AND CE 568, NEW PANEL SBLGA IN ELECTRIC ROOM 0065, AND RE-FEED EXISTING AIR COMPRESSOR AND SUMP PUMP. |
Amount:
$75,999
Award Description: "RECOVERY"- THIS ARRA FUNDED MODIFICATION IS TO DEFINITIZE MOD PC90 AND PROVIDE A CREDIT FOR CE 508 FOR THE MARY E. SWITZER PROJECT. |
Amount:
$22,800
Award Description: RECOVERY ACT MODIFICATION TO EXISTING CONTRACT
PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 573. |
Amount:
$0
Award Description: "RECOVERY" -DEFINITIZES CLIN0076 PC67 IN A NTE, PRICE TO BE DETERMINED $7,897,674.84 MODIFIED UNDER PAA1 SCOPING CLIN0076 NTE $2,384,000 AND ESTABLISH CLIN0114 NTE $5,513,674.84. |
Amount:
$0
Award Description: - RECOVERY ACT MODIFICATION - ADMINISTRATIVE MOD TO FULLY DEFINE THE SCOPE OF HPGB WITHIN TWO CLINS...(CLIN 0076 AND CLIN 0114) |
Amount:
$37,500
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE FOR CE 593 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION |
Amount:
$402,423
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION IS TO PROVIDE FOR AN ALLOWANCE FUND TO DELIVER A FINISHED, FULLY FUNCTIONING PROJECT THAT COMPLIES WITH ARRA AND ANCILLARY PROGRAMS IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$0
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ADMINISTRATIVE MODIFICATION IS TO CLEARLY DEFINE SCOPE FOR CE 560 AND CE560.1 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION. |
Amount:
$28,000
Award Description: RECOVERY ACT MODIFICATION - THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE576, R&R GSA FACILITIES LIGHTING, AND CE 574, DOG HOUSE INFILLS. |
Amount:
$11,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION IS TO PROVIDE FOR CE 577 AND CE 588 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION. |
Amount:
$15,500
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION TO CONTRACT IS TO PROVIDE FOR CE 572 IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION |
Amount:
$51,500
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE532 AND CE541, IN SUPPORT OF THE MARY E. SWITZER MODERNIZATION PROJECT. |
Amount:
$1,800,000
Award Description: TAS::47 4543::TAS
"RECOVERY" - THIS ARRA FUNDED MODIFICATION OF CONTRACT IS TO PROVIDE LABOR, MATERIAL, AND EQUIPMENT FOR CE 550, NEW SKYLIGHTS AT THE LIGHT COURT AREAS D & E IN THE MARY E. SWITZER BUILDING. |
Amount:
$0
Award Description: TAS::47 4543::TAS
RECOVERY - DELAY IN ACCESS TO RETAIL SPACES WILL NOT RESULT IN ANY TIME OR COST IMPACTS. |
Amount:
$0
Award Description: TAS::47 4543::TAS
RECOVERY ACT
CONTRACTOR TO DELETE INTERIOR PROJECT SIGN REQUIREMENT. |
Amount:
$0
Award Description: CONTRACTING OFFICER AUTHORITY IS TRANSFERRED FROM:
CHRISCHANDA S. SMITH
CONTRACTING OFFICER
GENERAL SERVICES ADMINISTRATION/NCR
301 7TH ST., SW
WASHINGTON, DC 20407
202-365-6394
TO:
PATRICIA K. LUDLOW
CONTRACTING OFFICER
GENERAL SERVICES ADMINISTRATION/NCR
301 7TH ST., SW
WASHINGTON, DC 20407
202-205-5696 |
Amount:
$0
Award Description: TAS::47 4543::TAS
"RECOVERY ACT"
CONTRACTOR TO PROVIDE DECORATIVE WOOD FENCE FOR SITE STAGING ALONG 15TH STREET AND VERMONT AVENUE IN LIEU OF A SITE STAGING FENCE CONSISTING OF CHAIN LINK WITH PRIVACY SCREENS AS OUTLINED IN SPECIFICATION SECTION 01500. |
Amount:
$5,400,000
Award Description: TAS::47 4543::TAS
RECOVERY ACT MODIFICATION
MODIFICATION IS ISSUED ON A PDL BASIS FOR NEW BUILDING SYSTEMS, HAZARDOUS MATERIAL ABATEMENT, EXTENDED FIELD OVERHEAD, RESEQUENCING AND REPHASING WORK, DEMOLITION OF EXISTING BUILDINGS, AND HISTORIC PRESERVATION AND RESTORATION. |
Amount:
$55,140
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CE# 6003 / G2666 BOLLARD REPAIRS: RAMP G HISSING NOISE, LOSS OF HYDRAULIC FLUID, CYLINDER REPLACEMENT, CE# 6004 / G2707 BOLLARD REPAIRS: RAMP B BOLLARDS NOT RETRACTING FULLY, CE# 6005 / G2825 BOLLARD REPAIRS: RAMP B GATE ARM FAILURE/INTERMITTENT OPERATIONS, CE# 6006 / G2841 BOLLARD REPAIRS: RAMP A ENTRY SIDE BOLLARD NOT RETRACING, ENTRY SIDE GATE ARM FAILURE, CE# 6007 / G2866 BOLLARD REPAIRS: RAMP G EXIT SIDE BOLLARDS FAILURE TO RE-DEPLOY TO THE UPRIGHT POSITION, CE# 6008 / G2892 BOLLARD REPAIRS: RAMP A RIGHT SIDE ENTRY BOLLARD NOT DRAINING RAIN WATER, CE# 6009 / G2904 LEAD PAINT AND WIRE AT RAMP C EXISTING STEEL BEAM, CE# 6010 / G3016 BOLLARD REPAIRS - RAMP G BOLLARD STICKING, FAULTY KEY SWITCH, FAULTY CONTROL BUTTONS, CE# 6011 / G3017 BOLLARD REPAIRS: RAMP B BOLLARD DOES NOT DEPLOY ON EXIT SIDE, CE# 6012 / BR-G2992 RAMP C - ROUTING OF STORM DRIP PAN DRAIN, CE# 6013 / 2892.1 BOLLARD REPAIRS: RAMP A FAILURE TO DRAIN WATER, CE# 6014 / GB-2934 OFF-SITE STORAGE AND PROTECTION OF GUARD BOOTHS, CE#6015 / G2955 TESTING OF TOPPING SLAB AT RAMPS - COMPRESSION/AIR ENTRAINMENT TESTING, CE#6016 / G3095 BOLLARD REPAIR: RAMP G HYDRAULIC LEAK AT RAMP G BOLLARD HPU, CONTACTOR TO REPLACE EXISTING HYDRAULIC PUMP AT RAMP G, CE# 6201 / G2598 STRUCTURAL TESTING SKETCHES, CE# 6601 / G2526.1 TEST PIT FOR ROOT BALL AT 18TH ST. MAGNOLIA, CE#6602 / G2526.2 PRUNING FOR STREET TREE AND MAGNOLIA LOCATED AT WING 2 EAST PLANTER AND PLANTER FILL FOR RE-TRANSPLANTING WING 2 EAST MAGNOLIA, CE# 6605 / G2941 REPLACE RUSTED HOSE BIB IN WING 4 EAST PLANTER, AND CE# 6607 / G2966 MOLD ABATEMENT AT ELEVATOR 26 MACHINE ROOM OF CAFETERIA. |
Amount:
$23,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES TO PERFORM THE WORK DESCRIBED IN THE ATTACHED SCOPE OF WORK, CE#4025, 4057, 4058, 4079, 4098 AND 4100. THE FINAL SETTLEMENT OF COSTS FOR PCAY WILL BE NEGOTIATED AND DEFINITIZED VIA CONTRACT MODIFICATION TO REFLECT THE FINAL TOTAL COST. |
Amount:
$52,000
Award Description: TAS::47 4543::TAS
"RECOVERY ACT"
CE#4014 / G2543 EXISTING METAL SHELVING AND METAL RAMPS AT M LEVEL; CE#4054 / G2681 HOT WATER FIN TUBE IN BULKHEAD AT GARAGE B; CE#4182 / G2620.1 VAT ADHERING TO CARPET AND BROWN SUBFLOORING IN MUSEUM; CE#4066 / G2754 EXIT LIGHTS AT CORRIDOR 6200&VESTIBULE 7260 AND LIGHT FIXTURE AT FLOOR 7 ELEVATOR HOIST WAY; CE#4056 / G2759 ADDITIONAL ABATEMENT FOR 7E ROOMS 7025A, 7021 AND 7030; CE#4087 / G2807 6W DEMO @ COLUMN LINES AA AND 31; CE#4093 / G2811 FABRIC WALL COVERING ON FLOOR 7 EAST; CE#4180 / G2995 CEILING OF MECHANICAL LEVEL ROOM M205; CE#4176 / G3006 UNFORESEEN ACM INSULATED DUCTWORK AT RAMP B; CE#4178 / G3007 CLARIFICATION OF DUCT SIZES FOR BASEMENT WEST; CE#4177 / G3008 DUCTWORK FOR RETURN GRILLES IN MUSEUM. |
Amount:
$22,500
Award Description: RECOVERY ACT
TAS::47 4543::TAS
PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES TO PERFORM THE WORK DESCRIBED IN THE ATTACHED SCOPE OF WORK, CE#4088, 4083, 4095, 4129, AND 4131. THE FINAL SETTLEMENT OF COSTS FOR PCAX WILL BE NEGOTIATED AND DEFINITIZED VIA CONTRACT MODIFICATION TO REFLECT THE FINAL TOTAL COST. |
Amount:
$85,000
Award Description: ARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS
PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES TO PERFORM THE WORK DESCRIBED IN THE ATTACHED SCOPE OF WORK, CE-4132. THE FINAL SETTLEMENT OF COSTS FOR PCAV WILL BE NEGOTIATED AND DEFINITIZED VIA CONTRACT MODIFICATION TO REFLECT THE FINAL TOTAL COST. |
Amount:
$35,000
Award Description: RECOVERY ACT
TAS::47 4543::TAS
REFERENCE: DOI GC SERVICES
CONTRACT IS MODIFIED TO INCLUDE THE FOLLOWING: CE#2246/G1696.7 BOLLARD REPAIRS: USE RAMP C GATE ARM MOTOR AT RAMP B, CE#2246/G1696.7 BOLLARD REPAIRS: USE RAMP C GATE ARM MOTOR AT RAMP B, CE#691.5A/G1696.13 BOLLARD REPAIRS: RAMP A EMERGENCY SERVICE 2/27/09, CE#707/G1999 BOLLARD REPAIRS: BOLLARD EMERGENCY SERVICE CALL FOR RAMP A & RAMP G, CE#708/G2129 BOLLARD REPAIRS: RAMP C EMERGENCY REPAIRS 8/6/09, CE#704/G2351 BOLLARD REPAIRS: REPLACE TOP PLATE BOLTS AT RAMP B AND RAMP G BOLLARDS, CE#705/G2352 BOLLARD REPAIRS: REPLACE MANIFOLD HOSES FOR RAMP C BOLLARDS, CE#706/G2360 BOLLARD REPAIRS: BOLLARD-NON FUNCTIONAL CONTROL BUTTON AT RAMP G, CE#711/G2235 BOLLARD REPAIRS: RAMP G BOLLARD REAPIRS-TRIPPING BREAKER REPORTED, CE#712/G2236 BOLLARD REPAIRS: RAMP C BOLLARD REPAIRS GATE ARM LIMIT SWITCH FAILURE. |
Amount:
$12,250
Award Description: RECOVERY ACT MODIFICATION CE#4121/G2728 AND G2728.1 RETURN AND RELIEF RISERS RF/2WA1, RF/2WA2, RA/2WA (G2728), AND CLARIFICATION ON RISER DIAGRAM FOR RF/2WA1, RF/2WA; ADD: $0
CE#4114/G2776 WING 2 SECOND FLOOR EAST MECHANICAL LEVEL CONFLICT; ADD: $5,000
CE#4135/G2923 SPRINKLER LAYOUT IN CONFLICT WITH EXISTING PIPES AT CL 31/CC ON 7 WEST; ADD: $750
CE#4138/G2930 INFILL OF CHASE BEHIND MECHANICAL LEVEL TOILET ROOM M205; ADD:$1,000
CE#4145/G2929 EXPANSION JOINT IN CONFLICT WITH SOUTH WALL OF ROOM M207; ADD:$3,500
CE#4139/G2906 CUT AND CAP OF STEAM CONDENSATE IN BASEMENT TRENCHES; ADD: $2,000 |
Amount:
$0
Award Description: TAS::47 4543::TAS
THIS MODIFICATION IS FOR INTERNAL/COMPRIZON PURPOSE ONLY TO CORRECT THE ACCOUNTING STRING. |
Amount:
$72,937
Award Description: RECOVERY ACT MODIFICATION
TAS::47 4543::
HEAT PUMPS&AC WINDOW UNITS FOR WING 1 DOGLEG OFFICES IN SUPPORT OF THE DOI MODERNIZATION PROJECT. |
Amount:
$12,777
Award Description: TAS::47 4543::TAS
"RECOVERY ACT"
CONTRACTOR TO PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES TO PERFORM THE WORK DESCRIBED IN CE#4006, 4047, 4067, 4034, 4070, 3217, 4010 AND 4051. THE FINAL SETTLEMENT OF COSTS FOR PSAZ WILL BE NEGOTIATED AND DEFINITIZED VIA CONTRACT MODIFICATION TO REFLECT THE FINAL TOTAL COST. |
Amount:
$308,689
Award Description: RECOVERY ACT
TAS::47 4543::TAS
CONTRACTOR TO ADD CE4181/G2830, G2830.1&G2830.2 - TYPICAL OFFICE LIGHT FIXTURE CHANGES (PER BULLETIN 5-5) TO THE SCOPE OF WORK. |
Amount:
$390,000
Award Description: ADAPTIVE REUSE OF VARIOUS BUILDINGS, ST. ELIZABETH WEST CAMPUS, SE, WASHINGTON, DC
THE SOW AS DESCRIBED IN CE021 FOR BUILDING 31 FACADE REVISIONS AND CE029 FOR BUILDING 33/34 FACADE REVISIONS AS AN ADD TO THE CONTRACT IN THE AMOUNT OF $390,000. |
Amount:
$0
Award Description: ARRA FUNDED: RECOVERY - ADAPTIVE REUSE OF VARIOUS BUILDINGS, ST. ELIZABETH WEST CAMPUS, SE, WASHINGTON, DC |
Amount:
$0
Award Description: ADAPTIVE REUSE OF VARIOUS BUILDINGS, ST. ELIZABETH WEST CAMPUS, SE, WASHINGTON, DC |
Amount:
$0
Award Description: ADAPTIVE REUSE OF SEVERAL HISTORICAL BUILDINGS AT THE ST. ELIZABETHS WEST CAMPUS IN WASHINGTON, DC. |
Amount:
$0
Award Description: ADAPTIVE REUSE OF VARIOUS BUILDINGS, ST. ELIZABETH WEST CAMPUS, SE, WASHINGTON, DC |
Amount:
-$390,000
Award Description: ADAPTIVE REUSE OF VARIOUS HISTORICAL BUILDINGS, ST ELIZABETHS, SE, WASH., DC |
Amount:
$394,584
Award Description: SECURITY GUARD SERVICES |
Amount:
$2,768
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$24
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$14,755
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, 200 CHESTNUT STREET, U.S. CUSTOM HOUSE, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$421
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$2,733
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$4,160
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUST STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$33
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$6,599
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$804
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$247,961
Award Description: THIS MODIFICATION PROVIDES DIRECTION TO PROCEED WITH WORK IN ACCORDANCE TO CE603.4, INTERIOR PIPING AND EQUIPMENT FOR GROUND SOURCE HEAT PUMPS, DATED 26 JANUARY 2012.
THIS MODIFICATION ESTABLISHES A NOT-TO-EXCEED PRICE FOR THE WORK AT $247,961.51. THE FINAL PRICE WILL BE DETERMINED LATER. |
Amount:
$0
Award Description: RECOVERY ACT MODIFICATION
TAS::47 4543::TAS
REFERENCE: DOI - GC SERVICES
THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE WORK RELATED TO "WING 2 LESSONS LEARNED" WHICH WAS PREVIOUSLY ISSUED ON A PRICE-TO-BE-DETERMINED LATER BASES VIA MODIFICATION POR1 ON 7/24/09. IN ADDITION, MODIFICATIONS PCAC, PCAD, PCAJ, PCAX, PCAY, PCAV, PCAW, PCBA, PCBB, PCBC, PCBF, PCBG, PCBH, PCBJ, PCBL, PCBQ, PCBT, PCBV, AND PCBX, ARE HEREBY DEFINITIZED VIA THIS MODIFICATION WHICH WERE PREVIOUSLY ISSUED ON A PRICE-TO-BE-DETERMINED LATER (PDL) BASIS AND SETTLED FOR $21,418,914.00 AS DETAILED IN THE ATTACHED DOCUMENT. |
Amount:
$7,419
Award Description: FOR ELECTRICAL REVISIONS FOR THE DEPT. OF EDUCATION TENT FIT OUT. |
Amount:
-$92,219
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$15,512
Award Description: TAS::47 4543::TAS RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$83,504
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
-$23,748
Award Description: TAS::47 4543::TAS. RECOVERY ENVELOPE RENOVATION PROJECT, U.S. CUSTOM HOUSE, 200 CHESTNUT STREET, PHILADELPHIA, PA, 19106. THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE. |
Amount:
$0
Award Description: DEFINITIZE THE SCOPE AND PRICING TO MOD PC68, PC73, PC88, PCA7, PAA1 AND PAB3 |
Amount:
$4,065,047
Award Description: ADAPTIVE REUSE OF VARIOUS HISTORIC BUILDINGS, ST. ELIZABETH WEST CAMPUS, SE, WASHINGTON, DC |
Amount:
$338,846
Award Description: ADAPTIVE REUSE OF VARIOUS HISTORICAL BUILDINGS, ST ELIZABETHS WEST CAMPUS, SE, WASH., DC |
Amount:
-$2,070,893
Award Description: DE-OBLIGATION OF PC09 UNDEFINITIZED FUNDS. |
Amount:
$1,347,377
Award Description: DEFINITIZE PC09 |
Amount:
$233,500
Award Description: DEFINITIZE PC09 |
Amount:
$484,380
Award Description: UNILATERAL MOD. FOR PC09 DEFINITIZATION |
Amount:
$273,123
Award Description: TEMPORARY RAMP AT C STREET ENTRANCE AND VALUE ENGINEERING |
Amount:
$87,354
Award Description: TELECOM SYSTEM INSTALLATION IN CHILD CARE CENTER AND SECURITY SYSTEM INSTALLATION |
Amount:
$1,300,000
Award Description: FINAL SETTLEMENT OF REQUEST FOR EQUITABLE ADJUSTMENT OF GRUNLEY RELATED ADDITIONAL COSTS AND IMPACTS SUSTAINED BY THEIR SUBCONTRACTOR GOEL DURING OPTION 2 |
Amount:
-$1,125,000
Award Description: CONTRACT IS MODIFIED TO DE-SCOPE WORK RELATED TO BLAST WINDOWS AND ADD THE HVAC UPGRADE SERVICES AT THE SOUTH PENTHOUSE. |
Amount:
$300,000
Award Description: SETTLE ALL CHANGE ORDERS PRIOR TO OPTION 4. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
00 |
| City |
DISTRICT OF COLUMBIA |
| County |
DISTRICT OF COLUMBIA |
| State |
DC |
| Zip |
20571 |
|