contract- RECIPIENT AWARD SUMMARY

STANGER INDUSTRIES INCORPORATED

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: SEDGWICK
Award Number: GSP0609GY5062 Project Location - State: KS
Funding Amount: $0 Project Location - Zip Code: 672022089
Ending Date: 2010-08-16 Congressional District: 04

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: STANGER INDUSTRIES INCORPORATED
Recipient Address: 4900 LAWN AVE
Recipient City: KANSAS CITY
Recipient State: MO
Recipient Zip Code: 641302834
Congressional District: MO-05

DESCRIPTION OF WORK/SERVICE PERFORMED

RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA,KS 67202 DEMOLISH EXISTING DUCTWORK AND DIFFUSERS AS SHOWN ON DRAWING DME 1 01, INSTALL NEW PNEUMATICS TUBING, PROVIDE CREDIT FOR WORK NOT PERFORMED UNDER PROPOSAL #6, INSTALL APPROPRIATELY- SIZED VAV, DUCTWORK, CONTROLS, AND INSULATION, AND INSTALL HAIL GUARDS.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $3,865,069
Award Description: RECOVERY ACT; TAS::47 4543::TAS AWARD OF WICHITA AIR HANDLER PROJECT AT THE US COURTHOUSE, 401 N. MARKET STREET, WICHITA, KS
Amount: $655,000
Award Description: TAS::47 4543::TAS RECOVERY - WARD PARKWAY FEDERAL BUILDING IMPROVEMENTS, 8930 WARD PARKWAY, KANSAS CITY, MO
Amount: $488,000
Award Description: RECOVERY TAS::47 4543::TAS: BOILER REPLACEMENT PROJECT (RIA00072), FEDERAL BUILDING&U.S. POST OFFICE, 400 S. CLINTON, IOWA CITY, IA - THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: 1) PRE-CONSTRUCTION PHASE SERVICES INCLUDING ATTENDING TWO (2) DESIGN REVIEW MEETINGS&2) CONSTRUCTION PHASE SERVICES. THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: THE REMOVAL OF TWO (2) GAS FIRED STEAM BOILERS, THE STEAM TO HOT WATER CONVERTER, CONDENSATE RETURN PUMPS AND RECEIVERS, EIGHT (8) STEAM HEATING COILS MOUNT IN AHU+S, FOUR (4) AHU MOUNTED STEAM HUMIDIFIERS AND PIPING, SEVEN (7) HEATING WATER PUMPS, AND ALL ASSOCIATED STEAM DISTRIBUTION AND CONDENSATE PIPING THROUGHOUT. REPLACEMENT OF BOILERS WITH FOUR (4) NEW 2,000 MBH INPUT NEW GAS FIRED HOT WATER CONDENSING MODULAR BOILERS (MANUFACTURED BY AERCO OR APPROVED EQUAL), COMPLETE WITH GAS AND HEATING WATER PIPING, VALVES, FITTINGS, INSULATION, CONTROLS, AND NEW FLUES. REPLACE ALL EXISTING HEATING WATER CIRCULATING PUMPS WITH THREE (3) NEW 7.5 HP PUMPS, COMPLETE WITH VFD+S, VALVES, STRAINERS, AND DIFFUSER INLET. REPLACE ALL EXISTING 3-WAY CONTROL VALVES SERVING HEATING UNITS WITH NEW ELECTRONIC 2-WAY CONTROL VALVES. REPLACE THE STEAM COILS WITH SIX (6) NEW AHU MOUNTED HOT WATER COILS WITH AVERAGE 20 SQ FT FACE AREA. PROVIDE TYPICAL COIL PIPING FOR EACH CONSISTING 2-WAY CONTROL VALVES, STRAINERS, GATE VALVES, PRESSURE/TEMPERATE GAGES, AND BALANCING VALVES. REPLACE THE EXISTING FOUR (4) HUMIDIFIERS WITH NEW ULTRASONIC TYPE AHU MOUNTED UNITS, COMPLETE WITH PIPING AND CONTROLS. INSTALL TWO (2) NEW STEAM GENERATING UNITS TO SERVE THE HUMIDIFIERS, ONE IN BASEMENT AND THE OTHER IN THE MEZZANINE EQUIPMENT ROOM. PIPE WATER TO EACH GENERATOR SUPPLIED FROM A NEW DEMINERALIZED SYSTEM INSTALLED IN BASEMENT EQUIPMENT ROOM.
Amount: $2,193,000
Award Description: TAS::47 4543::TAS PRECONSTRUCTION PHASE SERVICES AND CONSTRUCTION PHASE SERVICES FOR THE REPLACEMENT OF SEVEN EXISTING AIR HANDLING UNITS OF VARIOUS SIZES WITH A CENTRAL STATION VARIABLE UNIT FOR THE DOLE ARRA PHASE 2 AT THE ROBERT J. DOLE US COURTHOUSE, 500 STATE AVENUE, KANSAS CITY, KS 68801.
Amount: $506,370
Award Description: ARRA REPLACE CHILLED WATER PLANT USPO AND US COURTHOUSE 801 BROADWAY HANNIBAL, MO 63401-4353 WORK TO BE COMPLETED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: PARTICIPATION IN MEETINGS, DESIGN SUBMITTAL REVIEWS, VALUE ENGINEERING AND COST ESTIMATING. WORK ALSO INCLUDES PURCHASE FOR TWO MAG-LEV CHILLERS AND INSTALLATION.
Amount: $0
Award Description: RECOVERY: WARD PARKWAY ARRA PROJECT, 8930 WARD PARKWAY, KANSAS CITY, MO. THIS MODIFICATION IS BEING ISSUED TO FFP ELEMENTS OF THE GMP FOR COOLING TOWER WORK.
Amount: $0
Award Description: RECOVERY: WARD PARKWAY ARRA PROJECT, 8930 WARD PARKWAY, KANSAS CITY, MO. THIS MODIFICATION IS BEING ISSUED TO AUTHORIZE THE CONTRACTOR TO PURCHASE ONE (1) COOLING TOWER.
Amount: $0
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA,KS 67202 COMPENSATE CONTRACTOR FOR CHANGES TO ELECTRICAL SYSTEM AFTER FIRM FIXED PRICE AWARDED.
Amount: $0
Award Description: TAS::47 4543::TAS THIS MODIFICATION WAS ISSUED TO FIRM FIX PRICE THE CONSTRUCTION PHASE SERVICES FOR THE WICHITA ARRA AIR HANDLING PROJECT AT THE WICHITA US COURTHOUSE, 401 N. MARKET STREET, WICHITA KS.
Amount: $157,423
Award Description: RECOVERY KS0070ZZ, WICHITA AIR HANDLER REPLACEMENT,IKS00005 401 N. MARKET STREET WICHITA, KS 67202-2089 MODIFICATION PS04 IS ISSUED TO PROVIDE THE SUPPLY OF MATERIALS, TOOLS, EQUIPMENT, AND LABOR TO REPAIR HOT WATER LOOP AND VAV BOXES IN BASEMENT, ADVANCED METERING SYSTEM FOR ELECTRIC, GAS, AND WATER UTILITY MAINS (DOMESTIC, TOWER MAKE-UP, WATER TO CHEMICAL WASTE),AND INTEGRATE MEZZANINE AIR HANDLERS, EXHAUST FANS AND RELIEF FANS INTO THE NEW JCI EMCS. INTEGRATION SHALL INCLUDE THE ABILITY TO CONTROL MEZZANINE EQUIPMENT AS PREVIOUSLY AVAILABLE WITH HONEYWELL EMCS AND BE EXPANDABLE TO FULL DDC INTEGRATION AS MEZZANINE EQUIPMENT IS REPLACED IN FUTURE PROJECTS.
Amount: $74,395
Award Description: RECOVERY KS0070ZZ, WICHITA AIR HANDLER REPLACEMENT,IKS00005 401 N. MARKET STREET WICHITA, KS 67202-2089 MODIFICATION PS05 IS ISSUED TO COMPLETE HVAC INSTALL IN 2ND FLOOR (NE) COURTROOM.
Amount: $0
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT AND YEAR AROUND COOLING U.S COURTHOUSE 401 N. MARKET ST. WICHITA, KS 67202 INSTALL DRAIN PAINS UNDER AHU 33, 41, AND 51, CONDENSATE DRAINAGE, AND INSTALL LIGHTING IN ATTIC SPACE.
Amount: $0
Award Description: RECOVERY: BUILDING NO. IA0119ZZ, FEDERAL BUILDING & U.S. POST OFFICE, BOILER REPLACEMENT PROJECT (PROJECT #RIA00072), 400 S. CLINTON STREET, IOWA CITY, IA. TOTAL GUARANTEED MAXIMUM PRICE (GMP) FOR OPTION NO. 1 ($420,000) WAS OBLIGATED AT TIME OF AWARD. MODIFICATION PS01 IS BEING ISSUED AS A NO-COST MODIFICATION THAT ALLOWS FOR THE ORDERING OF EQUIPMENT WITH A LONG-LEAD DELIVERY SCHEDULE. PORTION OF OVERALL GMP AMOUNT NOW FIRM-FIXED-PRICED WITH THE ISSUANCE OF PS01 IS $133,888.00.
Amount: $0
Award Description: 100% CONTRUCTION DOCUMENTS ATTACHED FOR: RECOVERY: BUILDING NO. IA0119ZZ, FEDERAL BUILDING & U.S. POST OFFICE, BOILER REPLACEMENT PROJECT (PROJECT RIA00072), 400 S. CLINTON STREET, IOWA CITY, IA.
Amount: $4,129
Award Description: RECOVERY: WARD PARKWAY ARRA, 8930 WARD PARKWAY, KANSAS CITY, MISSOURI. THIS MODIFICATION IS BEING ISSUED TO EXERCISE OPTIONS PREVIOUSLY IDENTIFIED IN MODIFICATION PS03.
Amount: $0
Award Description: RECOVERY: ARRA (MO0134ZZ) ARRA WARD PARKWAY IMPROVEMENTS IMO00239 FEDERAL BUILDING 8930 WARD PARKWAY KANSAS CITY, MO 64114 THIS MODIFICATION PA06 IS ISSUED TO CORRECT REVISED COMPLETION DATE ON PS04 FROM 9/2/2010 TO 9/27/2010. PS04 EXTENDED THE ORGINAL COMPLETION DATE 30 DAYS. THERE ARE NO OTHER CHANGES TO MODIFICATION PS04 AND THIS MODIFICATION PA06 HAS NO IMPACT ON THE LINE ITEMS OR COST RELATED TO MODIFICATION PS04.
Amount: $0
Award Description: RECOVERY; WARD PARKWAY ARRA PROJECT, 8930 WARD PARKWAY, KANSAS CITY, MO. THIS MODIFICATION IS BEING ISSUED TO FFP THE GMP.
Amount: $63,784
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS07 IS ISSUED TO PROVIDE STEEL STRUCTURE IN EAST 2ND AND 3RD FLOOR MECHANICAL SPACES AND TO INSTALL METAL FLUE ASSEMBLY INSIDE EXISTING STEAM BOILER CHIMNEY, AND MODIFY BOILER EXHAUST FROM WINDOW EXIT TO CHIMNEY.
Amount: $0
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA,KS 67202 DEMOLISH EXISTING DUCTWORK AND DIFFUSERS AS SHOWN ON DRAWING DME 1 01, INSTALL NEW PNEUMATICS TUBING, PROVIDE CREDIT FOR WORK NOT PERFORMED UNDER PROPOSAL #6, INSTALL APPROPRIATELY- SIZED VAV, DUCTWORK, CONTROLS, AND INSULATION, AND INSTALL HAIL GUARDS.
Amount: $2,397
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS08 IS ISSUED TO SUPPLY ALL PRECONSTRUCTION SERVICES TO SUPPORT WORK INCLUDED IN P8.
Amount: $219,013
Award Description: THIS IS THE FIRM FIX PRICE SETTLEMENT FOR THE GMP. STANGER INDUSTRIES MODIFICATION PS03, WORK ITEM #1037 IS HEREBY ISSUED TO REPLACE TWO STEAM HEATING BOILERS AND WORK ITEM #1044 IS HEREBY ISSUED TO REPLACE STACE BOILERS WITH MODULATING HOT WATER BOILERS.
Amount: $0
Award Description: RECOVERY; ROBERT J. DOLE US COURTHOUSE, 500 STATE AVENUE, KANSAS CITY, KS 66101-2448. THIS ZERO DOLLAR MODIFICATION PA02 IS ISSUED TO CHANGE THE FUNCTION CODE ON THE ACCOUNT CODING. THIS MODIFICATION DOES NOT CHANGE ANY OTHER TERMS AND CONDITIONS. ZERO DOLLAR MODIFICATION, DOES NOT CHANGE OVERALL VALUE OF CONTRACT
Amount: $19,015
Award Description: RECOVERY. FEDERAL BUILDING/PO/USCH 801 BROADWAY HANNIBAL, MO 63401 WORK TO BE COMPLETED UNDER THIS MODIFICATION, PS01, INCLUDES BUT IS NOT LIMITED TO: PROVIDE ASBESTOS ABATEMENT WORK AS DEFINED IN THE SCOPE OF WORK. WORK INCLUDES REMOVAL, CONTAINMENT AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS.
Amount: $0
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS09 IS ISSUED TO PROVIDE NEW 50 HP VFDS ON EACH OF THE TWO CONDENSER WATER PUMPS. $29,077.00 MODIFICATION PS09 IS ISSUED TO PROVIDE AND INSTALL A NEW 7000 AMP CT ON THE MAIN BUS TO BE WIRED TO THE EXISTING 7330 ION METER. $18,893.00 MODIFICATION PS09 IS ISSUED TO PROVIDE A "HONED" FINISH ON THE TILE IN THE VESTIBULE IN FRONT OF THE DOUBLE DOORS, THE REVOLVING DOOR, AND AS YOU ENTER INTO THE EXISTING DOORS. $944.00 THIS MODIFICATION IS BEING FUNDED AS A DRAW DOWN ON PC08. 90,428.66 -48,914.00 41,514.66 REMAINING OWNER CONTROLLED CONTINGENCY
Amount: $6,006
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS03 IS ISSUED TO USE BUILDING AIR FOR THE INVERTER ROOM VENTILATION AND EXHAUST THE AIR TO THE CORRIDOR PLENUM.
Amount: $0
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS12 IS ISSUED TO PROVIDE ALL LABOR, MATERIALS, EXPERTISE, AND MANAGEMENT TO INSTALL A MAGNETIC LOCK RELEASE ON THE NORTH (OUTSIDE) VESTIBULE DOOR. $434.00 THIS MODIFICATION IS BEING FUNDED AS A DRAW DOWN ON PC08. 90,428.66 PS09 -48,914.00 PS11 -20,873.00 PS12 -434.00 REMAINING OWNER CONTROLLED CONTINGENCY $20,207.66
Amount: $0
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS11 IS ISSUED TO INSTALL A GALVANIZED SAFETY CABLE RAIL AT THE THIRD FLOOR ROOF. $20,873.00 THIS MODIFICATION IS BEING FUNDED AS A DRAW DOWN ON PC08. 90,428.66 PS09 -48,914.00 PS11 -20,873.00 REMAINING OWNER CONTROLLED CONTINGENCY 20,641.66
Amount: $4,596
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS07 IS ISSUED TO PROVIDE A KNEE WALL AROUND THE THREE SIDES OF THE VESTIBULE, AN ACCESS DOOR IN THE EXISTING VESTIBULE TO ACCESS SHUT OFF VALUES, AND TO PROVIDE COST FOR THE LOST MAN HOURS ON 11/15/10 DUE TO THE BUILDING ELECTING TO PUT THE CHILLERS BACK ONLINE.
Amount: $13,920
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 OWNER CONTROLLED ALLOWANCE/FALL PROTECTION MODIFICATION PS13 IS ISSUED TO COVER THE COST FOR ADDITIONAL FALL PROTECTION. THE OWNER(GSA)HAS SOLE DISCRETION OVER THE USE OF THESE ALLOWANCE FUNDS. AT THIS TIME THE CONTRACTOR IS NOT AUTHORIZED TO PROCEED WITH ANY WORK. SUBSEQUENT CONTRACT MODIFICATIONS (SF30)WILL BE ISSUED TO IDENTIFY DETAILED SCOPE, NEGOTIATED FIRM FIXED PRICE, AND PROVIDE THE CONTRACTOR WITH AUTHORIZATION TO PROCEED. ANY FUNDS NOT USED, AT THE GSA'S SOLE DISCRETION, WILL BE CREDITED BACK TO THE GOVERNMENT.
Amount: -$10,333
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS10 IS ISSUED TO PROVIDE A DEDUCT ASSOCIATED WITH DESCOPING THE INSTALLATION OF NEW CT'S, AND PROVIDE ANY COST TO ENSURE THAT THE EXISTING SYSTEM IS FUNCTIONING AND COMPLETELY OPERATIONAL.
Amount: $4,000
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS05 IS ISSUED TO PROVIDE FOR SPRAY INSULATION.
Amount: $4,353
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS06 IS ISSUED TO FURNISH AND INSTALL EXIT DEVICES, POWER TRANSFER, POWER TRANSFER HINGE, AND KEY SWITCH. PROVIDE A CREDIT FOR HARDWARE THAT WAS ORIGINALLY CALLED OUT.
Amount: $90,428
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PC08 IS ISSUED TO PROVIDE AND INSTALL 2 NEW VFDS FOR THE EXISTING CONDENSER WATER PUMPS, THE ASSOCIATED WIRING OF THE VFDS, AND THE REQUIRED ADDITIONAL PROGRAMMING TO TIE THE PUMPS BACK TO THE BAS. MODIFICATION PC08 IS ISSUED TO PROVIDE NEW CT INSTALLED ON THE MAIN BUS AND CONTROL WIRING TO BE TIED BACK TO THE EXISTING ION METER, AS WELL AS, DISCONNECTING THE TWO EXISTING CTS. MODIFICATION PC08 IS ISSUED TO PROVIDE A "HONED" FINISH ON THE EXISTING GRANITE TILE AT THE (2)ENTRANCE OF THE VESTIBULE. (WEST DOUBLE DOORS AND REVOLVING DOOR) MODIFICATION PC08 IS ISSUED AS PRICE TO BE DETERMINED (PDL) FUNDING RETAINED FOR CONDITIONS DURING THE CONSTRUCTION AND CLOSEOUT PHASES OF THE PROJECT SUCH AS, BUT NOT LIMITED TO THE FOLLOWING: A. ADDITIONAL CONSTRUCTION COSTS RESULTING FROM DISCOVERY OF UNFORESEEN OR DIFFERING SITE AND/OR BUILDING CONDITIONS BEYOND THE CONTROL OF THE GENERAL CONTRACTOR. B. ADDITIONAL CONSTRUCTION AND CLOSEOUT PHASE MODIFICATION COSTS BEYOND THE BASE BID, ALL PREVIOUS MODIFICATIONS INCURRED AND RESULTING FROM ITEM A. ABOVE; REQUEST(S) FOR PROPOSAL(S) (RFP); REQUEST(S) FOR INFORMATION (RFI). C. ADDITIONAL CONSTRUCTION COSTS RESULTING FROM EXTREME AND UNEXPECTED MATERIAL PRICE INCREASES BEYOND THE CONTROL OF THE GENERAL CONTRACTOR. D. COSTS INCURRED BY THE GENERAL CONTRACTOR DUE TO DELAY OF CONSTRUCTION PROGRESS BEYOND HIS/HER CONTROL IN ACCORDANCE WITH FAR 52.249-10 E. ADDITIONAL AGENCY REQUESTS BEYOND THE CONTROL OF THE GENERAL CONTRACTOR. F. PROJECT ACCELERATION REQUESTED BY AGENCY BEYOND THE CONTROL OF THE GENERAL CONTRACTOR. G. UNFORESEEN CONDITIONS ENCOUNTERED IN THE COMMISSIONING PROCESS AND CONDITIONS THAT REQUIRE ADDITIONAL PRE-CONSTRUCTION SERVICES BEYOND THE CONTROL OF THE GENERAL CONTRACTOR.
Amount: $12,944
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS04 IS ISSUED TO PROVIDE FOR A SMOOTH TRANSITION BETWEEN THE NEW PLAIN OF THE REVOLVING DOOR AND THE EXISTING BRICK AND PAVER PLAIN, RUN CONDUITS IN THE SOFFIT FROM EAST TO WEST TO HOUSE THE SECURITY CAMERA WIRES AT THEIR NEW LOCATION, AND RELOCATE THE CARD READER AND HANDICAP BUTTON.
Amount: $52,482
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS12 IS ISSUED TO SUPPLY ALL MATERIALS, TOOLS, EQUIPMENT, AND LABOR NEEDED TO REMOVE TWO EXISTING 100 GALLON DOMESTIC HOTWATER HEATERS AND REPLACE WITH TWO NEW ELECTRONIC IGNITION 100 GALLON GAS HOTWATER HEATERS. PROVIDE AND INSTALL APPROPRIATE SIZE BLADDER TYPE EXPANSION TANK. PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT, AND LABOR NEEDED TO INSTALL TWO-WAY CONTROL VALVES ON BOTH THE HOTWATER AND CHILLED WATER SUPPLY OF MEZZANINE AIR HANDLERS 11, 12, AND 13. PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT, AND LABOR NEEDED TO HYDRONIC TEST AND BALANCE TWO 5 HORSE POWER CHILLED WATER PUMPS, TWO 15 HORSE POWER CHILLED WATER PUMPS. AIR TEST AND BALANCE FIVE BUILDING RELIEF FANS.
Amount: $475
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS11 IS ISSUED TO PROVIDE A FIRM PRICE SETTLEMENT FOR SUPPLYING ALL MATERIALS, TOOLS, EQUIPMENT, AND LABOR NEEDED TO REMOVE GSA GAS METER, REPLACE WITH STEEL SPOOL PIECE, AND RESTART ALL BUILDING GAS EQUIPMENT, AS WELL AS, TO PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT, AND LABOR TO MAKE OPERATIONAL PNEUMATIC CONTROLS ON MEZZANINE AIR HANDLING UNITS.
Amount: $16,912
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS09 IS ISSUED TO PROVIDE A TECHNICAL SOLUTION FOR MEZZANINE RELIEF AIR UNITS AS WELL AS INSTALL THE REQUIRED ADDITIONAL ELECTRICAL CIRCUIT TO THE AIR COOLED CHILLER TO POWER THE EVAPORATOR HEATING UNIT.
Amount: $5,000
Award Description: RECOVERY: ARRA (KS0070ZZ) WICHITA AIR HANDLER REPLACEMENT IKS00005 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PC10 IS ISSUED TO PROVIDE A TECHNICAL SOLUTION TO REMOVE GAS METER AND RESTART BOILER PLANT, HOT WATER HEATERS AND GARAGE HEATER AT A PRICE-TO-BE-DETERMINED LATER BASIS NOT TO EXCEED $5,000.
Amount: -$2,823
Award Description: RECOVERY: MO0134ZZ ,FEDERAL BUILDING, 8930 WARD PARKWAY, KANSAS CITY, MISSOURI. MODIFICATION PS05 IS ISSUED TO DEDUCT FOR ION MAPPING SERVICE NOT PROVIDED AND REPAIRS ON CHILLER #1 AT 50% COST.
Amount: -$186,000
Award Description: P-6, ADMINISTRATIVE MODIFICATION PA06, IS HEREBY ISSUED TO RE-ASSIGN NON-ARRA FUNDS (BA55), USED FOR MODIFICATION PS03, TO THE CORRECT TAS NUMBER IN FPDS-NG. NON-ARRA FUNDS, THAT WERE USED TO FUND MODIFICATION PS03, WERE INITIALLY ASSIGNED TO AND REPORTED UNDER THE ARRA TAS NUMBER 47 4543 001. NON-ARRA FUNDS ARE TO BE ASSIGNED TO AND REPORTED UNDER NON-ARRA TAS NUMBER 47 4542 001. THIS MODIFICATION ASSIGNS THE NON-ARRA FUNDS TO THE CORRECT TAS NUMBER FOR FUTURE REPORTING PURPOSES. TOTAL NON-ARRA FUNDS INITIALLY REPORTED UNDER ARRA TAS TO BE DE-OBLIGATED IN THIS MODIFICATION: $186,000.00 FUNDS WILL BE RE-OBLIGATED UNDER CORRECT NON-ARRA TAS NUMBER IN SUBSEQUENT MODIFICATION.
Amount: $31,543
Award Description: ARRA: P-5, MODIFICATION PS05--BOILER REPLACEMENT PROJECT (RIA00072)--FEDERAL BUILDING&U.S. POST OFFICE, 400 SOUTH CLINTON, IOWA CITY, IA. PROVIDE/INSTALL FOUR (4) VALVES AND 16 TEMPERATURE SENSORS ON THE PERIMETER TO CONTROL THE FIN TUBE RADIATOR.
Amount: $19,957
Award Description: RECOVERY. FEDERAL BUILDING/PO/USCH 801 BROADWAY HANNIBAL, MO 63401 WORK TO BE COMPLETED UNDER THIS MODIFICATION INCLUDES BUT IS NOT LIMITED TO: REPLACE THE CHEMICAL FEED EQUIPMENT AND CONNECTIONS FOR CHILLED WATER AND CONDENSER WATER FOR NEW CHILLER INSTALLATION. AT THIS TIME, THE CONTRACTOR IS ONLY ABLE TO ASSIST GSA WITH FINALIZING THE DESIGN AND SPECIFICATION REQUIREMENTS. THIS IS A PRICE TO BE DETERMINED LATER (PDL) ACTION WHICH WILL BE DEFINITIZED IN A SUPPLEMENTAL AGREEMENT.
Amount: -$11,607
Award Description: RECOVERY. FEDERAL BUILDING/PO/USCH 801 BROADWAY HANNIBAL, MO 63401 THIS MODIFICATION IS THE FIRM PRICE SETTLEMENT OF PC04. SETTLEMENT PRICE WAS $8,350 WHEREAS THE PDL PC04 WAS ISSUED FOR $19,957. THIS ACTION IS THE NET CHANGE OF THE DIFFERENCE.
Amount: $39,650
Award Description: RECOVERY. FEDERAL BUILDING/PO/USCH 801 BROADWAY HANNIBAL, MO 63401 THIS MODIFICATION IS A FIRM FIXED PRICE SETTLEMENT OF THE ORIGINAL AWARDED GUARANTEED MAXIMUM PRICE. IN ADDITION, OTHER WORK IS ADDED TO THIS MODIFICATION WHICH INCLUDES BUT IS NOT LIMITED TO COLD WATER COLLECTION BASIN LINER, A NEW MARLEY HOT WATER BASIN AND OTHER MECHANICAL EQUIPMENT SERVICE.
Amount: -$31,527
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PS16 IS ISSUED TO PROVIDE ALL MATERIALS, LABOR, AND EXPERTISE TO RE-COMMISSION MCQUAY CHILLERS. (*FUNDED BY "OWNER CONTROLLED CONTINGENCY") MODIFICATION PS16 IS ISSUED TO DE-OBLIGATE THE REMAINING FUNDS OF THE "OWNER-CONTROLLED CONTINGENCY" FROM THE CONSTRUCTION CONTRACT CREATED BY PC08, AND TO DE-OBLIGATE THE FUNDS OF THE "OWNER-CONTROLLED ALLOWANCE" CREATED BY PS13.
Amount: $0
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 PA14 IS ISSUED TO TRANSFER PROJECT FUNDS TO THE NECESSARY ASIDS TO PAY INTEREST CHARGES FOR PAYMENT 9.
Amount: -$25
Award Description: RECOVERY: ARRA (KS0094ZZ) DOLE ARRA PHASE 2 IKS00008 ROBERT J. DOLE U.S. COURTHOUSE 500 STATE AVENUE KANSAS CITY, KS 66101-2448 MODIFICATION PA15 IS ISSUED TO CORRECT PA14 TO REFLECT THE CORRECT TRANSFER OF PROJECT FUNDS TO THE NECESSARY ASIDS TO PAY INTEREST CHARGES FOR PAYMENT 9.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 04
City SEDGWICK
County SEDGWICK
State KS
Zip 67202