contract- RECIPIENT AWARD SUMMARY
WESTERN ALLIED MECHANICAL, INC.
| AWARD OVERVIEW |
|
Agency Name: General Services Administration |
Project Location:
SAN FRANCISCO |
|
Award Number: GS09P10KSC0041 |
Project Location - State: CA |
|
Funding Amount:
$22,900 |
Project Location - Zip Code: 941023434 |
|
Ending Date:
2011-04-02 |
Congressional District: 08 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
WESTERN ALLIED MECHANICAL, INC. |
|
Recipient Address:
|
1180 O'BRIEN DR |
|
Recipient City:
|
MENLO PARK |
|
Recipient State:
|
CA |
|
Recipient Zip Code:
|
940251411 |
|
Congressional District:
|
CA-14 |
DESCRIPTION OF WORK/SERVICE PERFORMED
PROJECT: ARRA HVAC/MECHANICAL IMPROVEMENT
PHILLIP BURTON USCH & FB, SAN FRANCISCO, CA
THE PURPOSE OF THIS MODIFICATION IS TO ADD UTILITY METERING FOR THE COOLING TOWER WATER TO THE EXISTING CONTRACT, IN AN AMOUNT OF $22,900.00.
THIS CHANGE WILL INCREASE THE TOTAL CONTRACT PRICE FROM $2,859,344.00 TO $2,882,244.00.
CONTRACTOR SHALL PROVIDE ALL LABORS, EQUIPMENT, MATERIAL AND SERVICES TO INSTALL METERS ON MAAKEUP (1 EACH) AND BLOW-DOWN (2 EACH) FOR COOLING TOWERS, ESTABLISHED COMMUNICATIONS TO EXISTING POWERLOGIC SYSTEM (USING WIRELESS RECEIVER/ TRANSMITTER).
ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
| Other Awards |
Amount:
$0
Award Description: ARRA HVAC/MECHANICAL IMPROVEMENT
US GEOLOGICAL SURVEY
MENLO PARK, CA
THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ACCOUNTING AND APPROPRIATION DATA - COST ELEMEN SHOULD BE CHANGED FROM 94 TO 954, BUILDING NUMBER SHOULD BE CHANGED CA091500 TO CA0915OO, AND ADD WORK ITEM 016.
ALL TERMS AND CONDITIONS REMAIN THE SAME. |
Amount:
$5,818,815
Award Description: TAS::47 4543::TAS ARRA HVAC/MECHANICAL IMPROVEMENT
US GEOLOGICAL SURVEY
MENLO PARK, CA |
Amount:
$281,644
Award Description: ARRA HVAC/MECHANCIAL IMPROVEMENT
PHILLIP BURTON FEDERAL BUILDING
SAN FRANCISCO, CA.
TO INCLUDE ADDITIONAL QUNATITIES TO THE AWARDED LINE ITEMS.
IN ADDITION, TO ADD WATER AND GAS METERS, AND PROGRAMMING FOR HVAC MEASURES.
|
Amount:
$2,577,700
Award Description: TAS::47 4543::TAS ARRA HVAC - MECHANICAL IMPROVEMENT
PHILLIP BURTON FEDERAL BUILDING AND USCH
SAN FRANCISCO, CA |
Amount:
$122,500
Award Description: PROJECT: ARRA HAVA AND MECHANICAL IMPROVEMENT
US GEOLOGICAL SURVEY, MENLO PARK, CA
THE PURPOSE OF THIS MODIFICAITON IS TO INCLUDE ADDENDUM 1- WATER AND GAS METERS TO THE EXISTING CONTRACT, IN AN AMOUNT OF $122,500.00.
THIS CHANGE WILL INCREASE THE CONTRACT TOTAL AMOUNT FROM $5,818,815.00 TO $5,941,315.00.
ALL TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$22,900
Award Description: PROJECT: ARRA HVAC/MECHANICAL IMPROVEMENT
PHILLIP BURTON USCH & FB, SAN FRANCISCO, CA
THE PURPOSE OF THIS MODIFICATION IS TO ADD UTILITY METERING FOR THE COOLING TOWER WATER TO THE EXISTING CONTRACT, IN AN AMOUNT OF $22,900.00.
THIS CHANGE WILL INCREASE THE TOTAL CONTRACT PRICE FROM $2,859,344.00 TO $2,882,244.00.
CONTRACTOR SHALL PROVIDE ALL LABORS, EQUIPMENT, MATERIAL AND SERVICES TO INSTALL METERS ON MAAKEUP (1 EACH) AND BLOW-DOWN (2 EACH) FOR COOLING TOWERS, ESTABLISHED COMMUNICATIONS TO EXISTING POWERLOGIC SYSTEM (USING WIRELESS RECEIVER/ TRANSMITTER).
ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
|
Amount:
$106,274
Award Description: PROJECT: ARRA HVAC AND OTHER MECHANICAL IMPROVEMENT
USGS CAMPUSES, MENLO PARK, CA
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING TO THE CONTRACT:
1. TO INCLUDE AN INDUSTRIAL HYGIENIST SURVEY TO ESTABLISH LABORATORY AIRFLOW REQUIREMENTS; IH REVIEW OF EXISTING AND PROPOSED SYSTEMS; PREPARE IH REPORT OF FINDINGS, IN AN AMOUNT OF $20,300.
2. TO ADD 3 ELECTRICAL METERS FOR HVAC EQUIPMENT IN BUILDING 3 AND INTEGRATE WITH BAS, IN AN AMOUNT OF $8,646.
3. TO ADD 1 ELECTRICAL METER FOR HVAC EQUIPMENT IN BUILDING 15 AND INTEGRATE WITH BAS, IN AN AMOUNT OF $2,882.
4. TO INCLUDE CHANGES TO BUILDING 15 CHILLED WATER SYSTEM: (1) ADD VFD FOR CHWP-3; (2) CONVERT CHWP-3 MANUAL ISOLATION VALVES TO AUTO ISOLATION, IN AN AMOUNT OF $28,577.
5. TO CONVERT VAVS IN BUILDING 3A TO NEW BACNET BAS, IN AN AMOUNT OF $45,869.
THESE CHANGES WILL INCREASE THE CONTRACT TOTAL PRICE FROM $6,168,315 TO $6,274,589.
ARRA FUNDED: $6,274,589
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$227,000
Award Description: PROJECT: ARRA HVAC AND OTHER MECHANICAL IMPROVEMENT
USGS CAMPUSES, MENLO PARK, CA
1. TO EXTEND THE PROJECT SUBSTANTIAL COMPLETION DATE TO MARCH 31, 2012. HOWEVER, CONTRACTOR IS STILL REQUIRED TO FOLLOW THE PROJECT SCHEDULE. ANY CHANGES OR REQUEST FOR EXTENSION REGARDING THE PROJECT SCHEDULE WILL NEED TO BE SUBMITTED TO THE GSA PROJECT MANAGER, DAVID J STONE.
2. PROJECT 13 - REPLEACE THE AIR COOLED TRANE CHILLER FOR BUILDING 1 AND 2 WAS NOT AWARDED WITH THE ORIGINAL CONTRACT DUE TO THE LIMITATION OF THE FUNDING. THE PURPOSE OF THIS MODIFICATION IS TO INCLUDE THE AWARD OF THIS PROJECT INTO THE CONTRACT, IN AN AMOUNT OF $227,000.00.
THIS CHANGE WILL INCREASE THE CONTRACT TOTAL AMOUNT FROM $5,941,315.00 TO $6,168,315.00.
ARRA FUNDED: $6,168,315.00
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
Amount:
$0
Award Description: PROJECT: ARRA HVAC/MECHANICAL IMPROVEMENT
PHILLIP BURTON USCH&FB, SAN FRANCISCO, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 4/30/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES. |
Amount:
$0
Award Description: PROJECT: ARRA HVAC/MECHANICAL IMPROVEMENT
PHILLIP BURTON USCH&FB, SAN FRANCISCO, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 06/30/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES.
ARRA FUNDED: $2,882,244.00 |
Amount:
$0
Award Description: PROJECT: ARRA HVAC/MECHANICAL IMPROVEMENT
PHILLIP BURTON USCH&FB, SAN FRANCISCO, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 12/31/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES. |
Amount:
-$30,263
Award Description: PROJECT: ARRA HVAC AND OTHER MECHANICAL IMPROVEMENT
USGS CAMPUSES, MENLO PARK, CA
THE PURPOSE OF THIS MODIFICATION IS AS FOLLOW:
1. ACCOUNTING CORRECTIVE ACTION - TO CANCEL AND DEOBLIGATE THE FUNDS IN PS03, IN ORDER TO ADDRESS THE CONCERNS FROM THE OFFICE OF INSPECTOR GENERAL. AN AMOUNT OF $227,000.00 WILL BE DEOBLIGATED.
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$227,000.00>WITH THE DEDUCTION OF $227,000.00, THE TOTAL CONTRACT AMOUNT IS DECREASED FROM $6,274,589.00 TO $6,047,589.00.
2. UPWARD ADJUSTMENTS: TO INCORPORATE THE FOLLOWING SCOPE OF WORK AND NEGOTIATED COSTS INTO THE CONTRACT.
I. FIRE ALARM LIFE SAFETY - SYSTEM INVESTIGATION PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.01<$18,238.00>II. FIRE ALARM LIFE SAFETY - RETROFIT
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$150,590.00>III. ADDITIONAL VAV CONTROLLERS FOR BUILDING 1&2
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$58,636.00>IV. INSTALLATION OF VFDS FOR BUILDING 15
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$40,961.00>V. ADD BOILER GAS METER FOR BUILDING 15
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$6,850.00>VI. ADD BOOSTER FAN FOR LAB M-2063 FOR BUILDING 15
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<$3,500.00>VII. FLOW METERING BTU METERING CREDIT
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH12.VCA00064.CA915OO.016<- $22,428.00>VIII. AIR ECONOMIZER ON ROOFTOP AHU OF BLDG 3A&4 CREDIT
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH30.VCA00064.CA915OO.016<-$45,000.00>IX. RECOMMISION VAV SEQUENCE OPERATION FOR THE BUILDINGS CREDIT
PN0J00846.2011.442.09.PG03.P0920002.N20.PGH14.VCA00064.CA915OO.016<-$14,700.00>IN ACCORDANCE WITH THE GUIDANCE FROM CENTRAL OFFICE ATTACH TO THIS MODIFICATION, PS03 WILL BE DELETED IN ITS ENTIRETY (-$227,000.00), AND A NEW UPWARD ADJUSTMENT FOR PS06 WILL BE EXECUTED ($196,737.00). THE NET EFFECT TO THE CONTRACT IS A $30,263.00 REDUCTION. THE AMOUNT OF $196,737.00 MUST REMAIN IN PEGASYS SO AS TO ALLOW FINANCE TO DO A FUTURE COST TRANSFER OF THE FUNDS. UPON THE DE-OBLIGATION OF $30,263.00, THE CONTRACTING OFFICER WILL ISSUE A MODIFICATION IN THE AMOUNT OF $196,737.00 FROM THE FUNDS. THIS WILL BE DONE AS AN UPWARDS ADJUSTMENT. THE CFO WILL PERFORM A COST TRANSFER FROM THE ORIGINAL REMAINING FUNDS IN PS03 TO THE NEW MODIFICATION PS06. THIS WILL THEN ALLOW THE CONTRACTING OFFICER TO DE-OBLIGATE THE REMAINING FUNDS FROM PS03.
IN SUM, THE NEW CONTRACT AMOUNT AFTER THE SUBTRACTION OF THE $227,000.00 AND THE REISSUANCE OF CERTAIN LINE ITEMS IDENTIFIED THROUGH THIS MODIFICATION ABOVE FOLLOWING THE UPWARD ADJUSTMENT PROCESS, IS $30,263.00 FOR A NEW TOTAL CONTRACT AMOUNT OF $6,244,326.00.
THIS HAS THE NET EFFECT OF A DE-OBLIGATION OF $30,263.00 FROM THE CONTRACT NO. GS09P10KSC0074.
ARRA FUNDED: $6,244,326.00 |
Amount:
$0
Award Description: PROJECT: ARRA HVAC AND OTHER MECHANICAL IMPROVEMENT
USGS CAMPUSES, MENLO PARK, CA
THIS IS A UNILATERAL MODIFICATION TO EXTEND THE TERM OF THE CONTRACT TO 12/31/2012 SOLELY FOR GSA INTERNAL ACCOUNTING PURPOSES. THIS MODIFICATION IN NO WAY CHANGES PRICE, TERMS OR CONDITIONS TO INCLUDE EXISTING REQUIRED COMPLETION DATES. |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
08 |
| City |
SAN FRANCISCO |
| County |
SAN FRANCISCO |
| State |
CA |
| Zip |
94102 |
|