contract- RECIPIENT AWARD SUMMARY
Q2 REMEDIATION SERVICES JOINT VENTURE
| AWARD OVERVIEW |
|
Agency Name: Environmental Protection Agency |
Project Location:
PIERCE |
|
Award Number: W912DW10C0019 |
Project Location - State: WA |
|
Funding Amount:
$3,233,265 |
Project Location - Zip Code: 984076542 |
|
Ending Date:
2012-01-02 |
Congressional District: 06 |
RECIPIENT INFORMATION (AWARD)
| RECIPIENT INFORMATION (AWARD) |
|
Recipient Name:
|
Q2 REMEDIATION SERVICES JOINT VENTURE |
|
Recipient Address:
|
13588 FLORIDA BLVD |
|
Recipient City:
|
BATON ROUGE |
|
Recipient State:
|
LA |
|
Recipient Zip Code:
|
708193101 |
|
Congressional District:
|
LA-06 |
DESCRIPTION OF WORK/SERVICE PERFORMED
TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
| Other Awards |
Amount:
$3,233,265
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION. |
Amount:
$136,207
Award Description: NA1010-NON-ARRA - REMEDIATION CONTRACT -NA1010-NON-ARRA FUNDING FOR MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00014
NW009 INTERIM QTY INCREASE
NW015 CASE NW009 QTY ABOVE 115% |
Amount:
-$105,150
Award Description: ARRA RUSTON N. TACOMA CONSTRUCTION CONTR
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION. |
Amount:
$96,712
Award Description: NON-ARRA) RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA.
REFERENCE NO. R00019
NW019 QUANTITY INCREASE NO.3 (ABOVE 115%) |
Amount:
$0
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00004
NW006 REPLACEMENT OF EXISTING WOOD FENCE |
Amount:
$38,228
Award Description: NA1010-NON-ARRA - REMEDIATION CONTRACT -NA1010-NON-ARRA FUNDING FOR MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00011
NW012 REPLACE RETAINING WALL AT 4244 N44TH ST |
Amount:
$0
Award Description: ARRA) RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA.
REFERENCE NO. R00007 NW008 ASBESTOS CONTAINING MATERIAL DISPOSAL |
Amount:
$0
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
R00002 NW002 QTY OVERRUN WOOD DEBRIS, CLIN 004 |
Amount:
$97,814
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00017
NW017 QUANTITY INCREASE NO. 2 (UP TO 115%)
NW018 QUANTITY INCREASE NO. 2 (ABOVE 115%) |
Amount:
$0
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION. |
Amount:
$0
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00015
NW014 UNIT QTY ADJUSTMENT (CLIN0002)
ARRA RUSTON N. TACOMA CONSTRUCTION CONTR |
Amount:
$4,900
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
R00010 NW010 SPREADING OF WOOD PILE
ARRA RUSTON N. TACOMA CONSTRUCTION CONTR |
Amount:
-$96,790
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION. |
Amount:
$0
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
NW001 REVISED CONTRACTOR LAY DOWN YARD
THE ORIGINALLY ANTICIPATED CONTRACTOR LAYDOWN AND STORAGE AREA
IDENTIFED IN THE RFP, SHEET C-1, IS NO LONGER AVAILABLE AT THE
ORIGINAL TERMS. AFTER DISCUSSION BETWEEN PM AND EPA
IT WAS DECIDED TO FIND ALTERNATE LOCATION OUTSIDE OF THE POINT RUSTON PROPERTY. |
Amount:
$0
Award Description: TAS::68 8195::TAS ARRA::YES::ARRA
RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
REFERENCE NO. R00006 NW005 POINT RUSTON MEMORANDUM OF AGREEMENT FOR CONTRACT LINE ITEM 0003.
POINT RUSTON SOIL STOCKPILE DISPOSAL REQUIRES PRIVATE
PROPERTY ACCESS, COORDINATION, AND COMPLIANCE WITH PROPERTY OWNER
MEANS AND METHODS THAT WERE NOT SPECIFICALLY ADDRESSED IN THE BID
DOCUMENTS. Q2 IS TO NEGOTIATE A MEMORANDUM OF AGREEMENT WITH POINT RUSTON, TO BE APPROVED BY THE CORPS OF ENGINEERS, FOR ADDITIONAL COSTS RELATED TO DISPOSAL OF THE POINT RUSTON SOIL STOCKPILE. ADDITIONAL PAYMENT WILL ONLY BE MADE FOR COSTS IN ADDITION TO THE "EXCAVATION, TRANSPORTATION, DISPOSAL, AND LOCAL SURFACE CLEANUP/RESTORATION FOR AN EXISTING STOCKPILE(S) OF SOIL" ALREADY ACCOUNTED FOR IN THE CONTRACT. |
Amount:
-$56,080
Award Description: NON-ARRA) RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA.
R00018 NW020 QTY DECREASE #4 (CLIN0001) |
Amount:
$0
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
THIS MODIFICATION CORRECTS AMOUNTS DUE TO AN UNDERRUN OF CLIN 0003. |
Amount:
$2,404
Award Description: RECOVERYPROJECT#::324637::RP#
MISCELLANEOUS REMEDIAL CONSTRUCTION SERVICES, BUNKER HILL MINING AND METALLURGICAL COMPLEX SUPERFUND FACILITY FOR THE STATES OF IDAHO AND WASHINGTON.
SERVICES, INCLUDING (BUT NOT LIMITED TO) REMEDIATION SERVICES SUCH AS MANAGEMENT OF TAILINGS PILES, CAPPING OF SURFACE SOILS, DUST CONTROL, SLOPE STABILIZATION, BANK STABILIZATION, ACCESS CONTROL, DISPOSAL OF CONTAMINATED SOILS, SURFACE WATER MANAGEMENT, ROAD AND CULVERT REPAIR, AND RESTORATION OF SURFACE AND RE-VEGETATION.
R00013 NW013 PROPERTY SURVEY AT 4424 N 44TH ST |
Amount:
-$306,118
Award Description: ARRA RUSTON N. TACOMA CONSTRUCTION CONTR
CONTRACT FOR RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA.
REFERENCE NO. R00020
NW022 FINAL QUANTITIES |
Amount:
$128,753
Award Description: ARRA RUSTON N. TACOMA CONSTRUCTION CONTR
CONTRACT FOR RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA.
REFERENCE NO. R00021
NW021 R00011 ROCK WALL CHANGES
NW023 OVER-RUN/UNDER-RUNS
NW024 ADDITIONAL WORK AT 4117 N VERDE |
Amount:
$0
Award Description: ARRA - REMEDIATION CONTRACT - R00022
NW025 REPAIR OF 5910 N 42ND ST |
Amount:
$5,443
Award Description: ARRA RUSTON N. TACOMA CONSTRUCTION CONTR
CONTRACT FOR RECOVERY - ASARCO RUSTON YARD CLEAN-UP AT TACOMA, WA. REFERENCE NO. R00023
NW026 70% EXPEDITURE DATE REA |
| Location Information |
| Latitude, Longitude |
0º 0' 0",
0º 0' 0" |
| Congressional District |
06 |
| City |
PIERCE |
| County |
PIERCE |
| State |
WA |
| Zip |
98407 |
|