Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

ESI CONTRACTING, CORP.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: CLAY
Award Number: W912DQ10C1007 Project Location - State: MO
Funding Amount: $0 Project Location - Zip Code: 640898876
Ending Date: 2010-11-25 Congressional District: 06

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: ESI CONTRACTING, CORP.
Recipient Address: 3001 E 83RD ST
Recipient City: KANSAS CITY
Recipient State: MO
Recipient Zip Code: 641322547
Congressional District: MO-05

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3135::TAS CONTRACT IS FOR THE REPAIR OF ROADS AT THE SMITHVILLE DAM LAKE AREA. ARRA::YES::ARRA






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $4,748,591
Award Description: TAS::96 3134::TAS CHANNEL MODIFICATIONS TO THE BLUE RIVER CHANNEL BRUSH CREEK TO 53RD ST IN KANSAS CITY, MISSOURI. ARRA::YES::ARRA
Amount: $469,961
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::74991::RP# BLUE RIVER CHANNEL, KANSAS CITY, MO FULLY FUND CURRENT BRUSH CREEK TO 53RD STREET CONSTRUCTION CONTRACT. ARRA::YES::ARRA
Amount: $183,400
Award Description: TAS::96 3134::TAS STABILIZATION OF THE EMBANKMENT OF THE BLUE RIVER.
Amount: $3,411,032
Award Description: TAS::96 3134::TAS RECOVRYPROJECT::74991::RP# BLUE RIVER CHANNEL, MO PROJECT IS FOR THE BLUE RIVER CHANNEL IMPROVEMENT 53RD-63RD STREET.
Amount: $10,704,706
Award Description: TAS::96 3134::TAS RECOVERYPROJECT::12381::RP# TURKEY CREEK BASIN, KS & MO PROJECT IS FOR THE CONSTRUCTION OF A CIVIL WORKS FLOOD DAMAGE REDUCTION PROJECT ALONG TURKEY CREEK, KANSAS CITY, KANSAS. PROJECT CONSISTS OF 800 FEET OF CHANNEL DEEPENING AND WIDENING WHICH WILL RESULT IN A CONCRETE WALLED CHANNEL WITH A NATURAL STREAM BOTTOM.
Amount: $18,944
Award Description: TAS::96 3134::TAS CONTRACT IS FOR THE REHABILITATION AND RESTORATION OF THE BLUE RIVER CHANNELL - FROM BRUSH CREEK TO 53RD. ST ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3134::TAS CONTRACT IS FOR THE REHABILITATION OF THE BLUE RIVER CHANNEL FROM BRUSH CREEK TO 53RD IN KANSAS CITY, MISSOURI. (CHANNEL MODIFICATIONS STATIONS) ARRA::YES::ARRA
Amount: $1,000,647
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::74991::RP# BLUE RIVER CHANNEL, KANSAS CITY, MO FULLY FUND CURRENT BRUSH CREEK TO 53RD STREET CONSTRUCTION CONTRACT. ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3134::TAS CONTRACT IS FOR THE REHABILITATION OF THE BLUE RIVER CHANNEL FROM BRUSH CREEK TO 53ST IN KANSAS CITY, MO. ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3135::TAS CONTRACT IS FOR THE REPAIR OF ROADS AT THE SMITHVILLE DAM LAKE AREA. ARRA::YES::ARRA
Amount: $13,484
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::RP# 16980 ARRA SMITHVILLE LAKE ROAD WORK
Amount: $18,082
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::RP# 16980 ARRA SMITHVILLE LAKE ROAD WORK
Amount: $915,652
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::RP# 16980 ARRA SMITHVILLE LAKE ROAD WORK
Amount: $32,528
Award Description: TAS::96 3135::TAS CONTRACT IS FOR THE REPAIR OF ROADS AT SMITHVILLE LAKE, MO ARRA::YES::ARRA
Amount: $75,536
Award Description: CONTRACT FOR TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS
Amount: $93,140
Award Description: TAS::96 3134::TAS CONTRACT IS FOR THE REPAIR OF TURKEY CREEK WALLED CHANNEL
Amount: $0
Award Description: TAS::96 3134::TAS ARRA BLUE RIVER CHANNEL - BASE BID
Amount: $0
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::74991::RP# BLUE RIVER CHANNEL, KANSAS CITY, MO MODIFICATION ISSUED AS AN IN-SCOPE UNPRICED CHANGE ORDER WITH DEFINITIZATION TO BE DOCUMENTED IN SUBSEQUENT MODIFICATIONS.
Amount: $251,674
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::74991::RP# BLUE RIVER CHANNEL, KANSAS CITY, MO MODIFICATION TO INCLUDE RECONFIGURATION OF THE GRADE CONTROL STRUCTURES AND CHANGES TO REVETMENT STRUCTURES AS SHOWN ON THE REISSUED CONTRACT DRAWINGS LISTED IN THE MODIFICATION.
Amount: -$251,674
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::74991::RP# BLUE RIVER CHANNEL, KANSAS CITY, MO MODIFICATION ISSUED AS AN IN-SCOPE UNPRICED CHANGE ORDER WITH DEFINITIZATION TO BE DOCUMENTED IN SUBSEQUENT MODIFICATIONS.
Amount: $0
Award Description: TAS::96 3134::TAS - CONTRACT IS FOR THE REPAIR OF THE BLUE RIVER CHANNEL IN KANSAS CITY.
Amount: $19,137
Award Description: TAS::96 3122::TAS ARRA::YES::ARRA CHANGE FOR DISPOSAL OF SUSPECT SOIL-REVISED TO CONTRACT FOR TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS.
Amount: $20,857
Award Description: TAS::96 3122::TAS ARRA::YES::ARRA MODIFICATION FOR TOE WALL @ SS LINE 7+09,0; WEDGE AT WING WALLS; DEMOLITION 66" RCP CONCRETE CRADLE; ADD WING PANELS TO FENCING; AND SHAFT 55L TO CONTRACT FOR TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS.
Amount: $42,594
Award Description: TAS::96 3122::TAS ARRA::YES::ARRA CHANGE FOR REVISED GRADING PLAN MISSION ROAD RAMP, WALL AT MIDPOINT NATIONAL BUILDING LOT, JUNCTION BOX AT STORM SEWER 5; AND 30" RIPRAP AT DROP STRUCTURE WALLS TO CONTRACT FOR TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS.
Amount: $0
Award Description: TAS::96 3134::TAS TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS
Amount: $136,366
Award Description: TAS::96 3134::TAS TURKEY CREEK - WALL CHANNEL FY10 AT KANSAS CITY, KANSAS

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 06
City CLAY
County CLAY
State MO
Zip 64089