contract- RECIPIENT AWARD SUMMARY

JENSEN DRILLING COMPANY

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: KING
Award Number: W912DW09C0016 Project Location - State: WA
Funding Amount: $22,548 Project Location - Zip Code: 980510001
Ending Date: 2009-09-17 Congressional District: 08

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: JENSEN DRILLING COMPANY
Recipient Address: 1775 HENDERSON AVE
Recipient City: EUGENE
Recipient State: OR
Recipient Zip Code: 974032371
Congressional District: OR-04

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3135::TAS RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON PROVIDE ADDITIONAL DUST CONTROL MEASURES ON THE MAIN ACCESS ROAD (5500 ROAD) TO HOWARD HANSON DAM IN THE CITY OF TACOMA WATERSHED, GREEN RIVER WASHINGTON.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $916,874
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON
Amount: $1,945,830
Award Description: AS A PART OF AN DAM SAFETY MONITORING UPGRADE EFFORT ON THE DWORSHAK DAM, ARRA FUNDS ARE BEING USED TO SUPPLY AND INSTALL AN UPGRADED INSTRUMENTATION SYSTEM AS PART OF THE NATIONAL DSAC PROGRAM. THE INTENT IS TO RAISE THE DSAC RATING OF THE DAM ABOVE 3. THE WORK IS BEING PERFORMED BY JENSON DRILLING COMPANY OUT OF THEIR EUGENE, OR OFFICE UNDER THE DIRECTION OF THE U.S. CORPS OF ENGINEERS, WALLA WALLA DISTRICT - P2# 148415; ARRA PROJECT # 5090."
Amount: $1,936
Award Description: RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON PROVIDE ADDITIONAL DUST CONTROL MEASURES ON THE MAIN ACCESS ROAD (5500 ROAD) TO HOWARD HANSON DAM IN THE CITY OF TACOMA WATERSHED, GREEN RIVER WASHINGTON. FL007 FINAL QUANTITY REVISION. THIS MODIFICATION FINALIZES UNIT-PRICED CONTRACT QUANTITIES.
Amount: $15,246
Award Description: RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON PROVIDE ADDITIONAL DUST CONTROL MEASURES ON THE MAIN ACCESS ROAD (5500 ROAD) TO HOWARD HANSON DAM IN THE CITY OF TACOMA WATERSHED, GREEN RIVER WASHINGTON. FL003 STAINLESS STEEL CASING FOR VENT SHAFT VENT SHAFT CASING - DELETE REQUIREMENT FOR CONTRACTUALLY-REQUIRED ASTM A 53 10-INCH NOMINAL DIAMETER SCHEDULE 40 STEEL PIPE STEEL CASING AND REPLACE REQUIREMENT WITH 304 STAINLESS STEEL 10-INCH PIPE AND WELDMENTS.
Amount: $34,000
Award Description: RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON PROVIDE ADDITIONAL DUST CONTROL MEASURES ON THE MAIN ACCESS ROAD (5500 ROAD) TO HOWARD HANSON DAM IN THE CITY OF TACOMA WATERSHED, GREEN RIVER WASHINGTON. FL002 CHANGE TO NON-SHRINK GROUT MIX FL004 THD-15 ABANDONMENT AND REPLACEMENT PULL THE INSTALLED SCREEN AND CASING FROM THD-15, REDRILL THE BOREHOLE TO 170 FEET, INSTALL MANCHETTE PORTS AND BLANK STAINLESS STEEL PIPE FOR THE FULL LENGTH, AND GROUT THE BOREHOLE FROM THE TUNNEL WALL TO ITS DRILLED DEPTH. A REPLACEMENT HORIZONTAL DRAIN WILL BE INSTALLED NEAR THE ABANDONED THD-15. THE REPLACEMENT DRAIN WILL BE THD-19.
Amount: $22,548
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::321586::RP# 321586-HHD INTEGRITY INVESTIGATION RA HOWARD HANSON DAM RIGHT ABUTMENT INTERIM MEASURE -- DRAINAGE TUNNEL IMPROVEMENTS, GREEN RIVER, WASHINGTON PROVIDE ADDITIONAL DUST CONTROL MEASURES ON THE MAIN ACCESS ROAD (5500 ROAD) TO HOWARD HANSON DAM IN THE CITY OF TACOMA WATERSHED, GREEN RIVER WASHINGTON.
Amount: $123,212
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $276,321
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: -$21,572
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $8,887
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $102,759
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $0
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $2,343
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: -$9,682
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $0
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $16,628
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $0
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: -$343,560
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $9,019
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $14,828
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $4,938
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $0
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: $29,925
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE
Amount: -$5,250
Award Description: DAM SAFETY MONITORING SYSTEM UPGRADE

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 08
City KING
County KING
State WA
Zip 98051