Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

HDR ENGINEERING, INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of the Interior Project Location: JEFFERSON
Award Number: INP10PB76092 Project Location - State: CO
Funding Amount: $9,948 Project Location - Zip Code: 802285497
Ending Date: 2012-10-02 Congressional District: 06

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: HDR ENGINEERING, INC.
Recipient Address: 8404 INDIAN HILLS DR
Recipient City: OMAHA
Recipient State: NE
Recipient Zip Code: 681144049
Congressional District: NE-02

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::14 1041::TAS RECOVERY - OTHER FUNCTIONS, SENIOR COST ESTIMATOR SERVICER FOR THE DENVER SERVICE CENTER, LAKEWOOD, COLORADO. THIS MODIFICATION INCORPORATES ADDITIONAL HOURS NEEDED FOR CLAIM REVIEW AND SUPPORT AND EXTENDS THE PERIOD OF PERFORMANCE TO SEPTEMBER 30, 2012.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $53,300
Award Description: DESIGN, DESIGN REVIEW
Amount: $26,823
Award Description: TAS::14 1035::TAS RECOVERY DSB, A-E SERVICES FOR "HOUSING" LOCATED AT GRAND PORTAGE NATIONAL MONUMENT, MN.
Amount: $18,000
Award Description: TAS::14 1041::TAS RECOVERY MISCELLANEOUS MEETINGS AND TASKS FOR GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $63,700
Award Description: TAS::14 1041::TAS RECOVERY PREPARATION OF DESIGN BUILD REQUEST FOR PROPOSAL INCLUDING 35% DESIGN DEVELOPMENT, VALUE ANALYSIS, CONSTRUCTION DOCUMENTS, VALUE ANALYSIS, CONSTRUCTION DOCUMENT, AND COST ESTIMATING SERVICES, REPLACE AND REHABILITATE HEATING SYSTEM IN HISTORIC AIRCRAFT HANGAR B, KINGS COUNTY, NY.
Amount: $173,287
Award Description: TAS::14 1041::TAS RECOVERY VICK 150797, MINT SPRING BLUFF STABILIZATION, DESIGN SERVICES FOR DESIGN DEVELOPMENT & CONSTRUCTION DOCUMENTS
Amount: $392,400
Award Description: TAS::14 1041::TAS RECOVERY; BLUE RIDGE PARKWAY, REPLACE HISTORIC GUARDWALLS, BLRI-153096. DESIGN SERVICES FOR DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS FOR HISTORIC STONE GUARDWALLS.
Amount: $457,500
Award Description: TAS::14 1041::TAS RECOVERY PREDESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND CONSTRUTION DOCUMENT SERVICES; STABILIZATION OF ELLIS ISLAND SEAWALL (COMPLETION OF PHASE I); STATUE OF LIBERTY NATIONAL MONUMENT, ELLIS ISLAND, NEW YORK COUNTY, NY
Amount: $26,500
Award Description: TAS::14 1041::TAS RECOVERY MOD 0001 - INCORPORATES SEA WALL CORE SAMPLES AND TESTING NOT INCLUDED IN TASK ORDER AWARD. STLI-152319 TASK ORDER - PREDESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND CONSTRUTION DOCUMENT SERVICES; STABILIZATION OF ELLIS ISLAND SEAWALL (COMPLETION OF PHASE I); STATUE OF LIBERTY NATIONAL MONUMENT, ELLIS ISLAND, NEW YORK COUNTY, NY.
Amount: $35,032
Award Description: TAS::14 1041::TAS RECOVERY CUVA 094479 CUYAHOGA VALLEY NATIONAL PARK, SUMMIT COUNTY, OHIO 'ELIMINATE FAILING SEPTIC SYSTEMS IN VILLAGE OF EVERETT' AE SERVICES FOR SUBMITTAL REVIEW, OFFICE SERVICES AND SITE VISITS
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY (ADMINISTRATIVE MODIFICATION 0001 TO CORRECT FUNDING STRIP ONLY; ALL OTHER TERMS AND CONDITIONS OF THE TASK ORDER REMAIN UNCHANGED.) - PREDESIGN AND SCHEMATIC DESIGN SERVICES FOR INSTALLATION OF A NEW 12.5KV SUBMARINE CABLE THROUGH THE SAN FRANCISCO BAY TO REPLACE DIESEL GENERATED POWER AT GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $229,265
Award Description: TAS::14 1041::TAS RECOVERY PREDESIGN AND SCHEMATIC DESIGN SERVICES FOR INSTALLATION OF A NEW 12.5KV SUBMARINE CABLE THROUGH THE SAN FRANCISCO BAY TO REPLACE DIESEL GENERATED POWER AT GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $28,287
Award Description: TAS::14 1041::TAS RECOVERY THE WORK CONSISTS OF PREPARING PRE-DESIGN, SKEMATIC DESIGN, AND CONSTRUCTION DOCUMENTS FOR THE CANOPIES ADJACENT TO THE HISTORIC TRAIN STATION AT VALLEY FORGE NATIONAL HISTORICAL PARK.
Amount: $229,485
Award Description: TAS::14 1041::TAS RECOVERY PREDESIGN AND SCHEMATIC DESIGN DOCUMENTS FOR INSTALLATION OF SOLAR PHOTOVOLTAIC (PV) PANELS AT GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND (GOGA-150682), SAN FRANCISCO COUNTY, CALIFORNIA 94123-1308
Amount: $222,297
Award Description: TAS::96 3133::TAS LAND SURVEY OF CREST GAGES IN TEN COUNTIES WITHIN THE PORTLAND DISTRICT TO RELATE THE CREST GAGE DATUM TO THE GEOGRAPHIC DATUM FOR PORTLAND DISTRICT'S FLOODPLAIN MANAGEMENT SYSTEM ARRA::YES::ARRA
Amount: $79,990
Award Description: TAS::96 3133::TAS RECIVERYPROJECT#::323959 NEHALEM RIVER FLOOD MODELING FOR THE CITY OF VERNONIA, OREGON
Amount: $24,686
Award Description: TAS::96 3134::TAS RECOVERY PROJ C - GARRISON DAM A/E DESIGN SERVICES
Amount: $212,710
Award Description: TAS::96 3134::TAS PREPARE PLANS AND SPECIFICATIONS IN SUPPORT OF THE DESIGN/BUILD CONTRACT FOR THE WYETH FISHING TREATY ACCESS SITE AND STANLEY ROCK DOCK REPAIR AND TO PROVIDE TECHNICAL ASSISTANCE ONLY WHEN AUTHORIZED. ARRA::YES::ARRA
Amount: $44,753
Award Description: TAS::96 3135::TAS KEY MEMBERS OF THE CONTRACTOR'S INSPECTION TEAM SHALL ATTEND THE LEVEE PERIODIC INSPECTION WORKSHOP AND ENSURE INSPECTION TEAMS CONDUCT THE INSPECTION IN COMPLIANCE WITH THE STANDARDIZATION WORKSHOP.
Amount: $1,073,986
Award Description: TAS::96 3135::TAS SPILLWAY GATE HYDRAULIC STEEL STRUCTURES INSPECTIONS AND ANALYSIS AT SIX PROJECTS IN THE WILLAMETTE VALLEY (BLUE RIVER, COUGAR, DETROIT, FALL CREEK, FERN RIDGE AND LOOKOUT POINT).
Amount: $0
Award Description: MODIFICATION TO INCORPORATE HDR SUBCONTRACTING PLAN AND CHANGE CONTRACT MANAGER
Amount: -$249,999
Award Description: DESIGN, DESIGN REVIEW
Amount: $93,420
Award Description: TAS::12 1073::TAS RECOVERY PROFESSIONAL A&E CONSTRUCTION MANAGEMENT SERVICES FOR NEWTON COUNTY, MISSOURI
Amount: $35,204
Award Description: INDEPENDENT REVIEW OF THE NICHOLS DAM REHABILITATION DESIGN IN MASSACHUSETTS. CONTRACT NUMBER: AG-3A75-C-09-0019.
Amount: $33,208
Award Description: TAS::12 1142::TAS RECOVERY INDEPENDENT DESIGN REVIEW, SWITZLER CREEK WATERSHED, SITE 7, OSAGE COUNTY, KANSAS UNDER CONTRACT AG-3A75-C-09-0019
Amount: $30,615
Award Description: INDEPENDENT DESIGN REVIEW OF LITTLE SANDY - TRAIL CREEK WATERSHED SITE 1 - MADISON COUNTY, GEORGIA.
Amount: $28,037
Award Description: RECOVERY-DESIGN REVIEW OF MARBURY SITE IN GA
Amount: $22,244
Award Description: 39. DESIGNATE THE CO AND GR IN LTC SITUATIONS WHERE NRCS WILL CONTRACT DIRECTLY WITH THE LAND USER. LONG-TERM CONTRACTING, GM 120, PART 404.41. X TAS::12 1142::TAS RECOVERY DESIGN REVIEW IN BORROW, JACKSON, AND MADISON COUNTIES GEORGIA UNDER CONTRACT: AG-3A75-C-09-0019.
Amount: $322,411
Award Description: AMERICAN RECOVERY AND REINVESTMENT ACT - ARCHITECT & ENGINEERING SERVICES
Amount: $0
Award Description: POP EXTENSION, TAS::14 1035::TAS RECOVERY DSB, A-E SERVICES FOR "HOUSING" LOCATED AT GRAND PORTAGE NATIONAL MONUMENT, MN.
Amount: $74,447
Award Description: TAS::14 1035::TAS RECOVERY GRPO PMIS# 152409 THE WORK CONSISTS OF TITLE I A-E SERVICES FOR "SEASONAL HOUSING" LOCATED AT GRAND PORTAGE, MN.
Amount: $27,557
Award Description: TAS:: 14 1035:: RECOVERY GRPO PMIS# 152409. THE WORK CONSISTS OF TITLE III A-E SERVICES FOR "SEASONAL HOUSING" LOCATE AT GRAND PORTAGE, MN.
Amount: $2,158
Award Description: TAS:: 14 1035:: RECOVERY GRPO PMIS# 152409. THE WORK CONSISTS OF OF AN ADDITIONAL SITE VISIT FOR GREEN RATERFOR "SEASONAL HOUSING" LOCATE AT GRAND PORTAGE, MN.
Amount: $25,523
Award Description: RECOVERY GATE-153130- REQUIRED TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE "INSTALL PHOTOVOLTAIC SYSTEMS AT FIVE SANDY HOOK BEACH CENTERS" PROJECT.
Amount: $658,204
Award Description: RECOVERY GRTE 083219, CONSTRUCTION MANAGEMENT SERVICES, REHABILITATION OF MOOSE MAINTENANCE BUILDING, GRAND TETON NATIONAL PARK
Amount: $39,100
Award Description: TAS::14 1041::TAS RECOVERY SHEN PMIS #152664 - A/E TITLE III SERVICES FOR THE CONSTRUCTION PROJECT TO "REHABILITATE SIXTEEN HISTORIC OVERLOOKS ALONG SKYLINE DRIVE". AS THE ENGINEER OF RECORD, THE CONTRACTOR SHALL PERFORM ARCHITECT-ENGINEERING SERVICES DURING THE CONSTRUCTION OF THE PROJECT RELATED TO REVIEWING REQUESTS FOR INFORMATION AND SUBMITTALS, ASSISTING IN INSPECTIONS, AND PREPARING- FINAL AS-BUILT DRAWINGS.
Amount: $63,500
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL.
Amount: -$111
Award Description: TAS::14 1041::TAS RECOVERY GOGA PMIS # 150682 GOLDEN GATE NATIONAL RECREATION AREA-ALCATRAZ ISLAND, SAN FRANCISCO (SAN FRANCISCO COUNTY), CALIFORNIA 94123-1308 DE-OBLIGATION OF $111.30 OF ARRA FUNDS BASED ON INSPECTION, RECEIPT, AND ACCEPTANCE OF VENDOR'S PROPER FINAL INVOICE NO. 136947-H, DATED 09/11/2009 IN THE AMOUNT OF $17,888.70.
Amount: $0
Award Description: RECOVERY GATE PMIS #118298, MODIFICATION 0002 FOR A NO COST TIME EXTENSION: DESIGN - REHAB WEST PORCH VC FIRE EGRESS, GATEWAY NATIONAL RECREATION AREA, SANDY HOOK, NEW JERSEY
Amount: $185,900
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL. MOD 0001 INCORPORATES DESIGN SERVICES FOR ADDITIONAL LINEAR FOOTAGE OF SEAWALL IN ACCORDANCE WITH THE ORIGINAL SCOPE OF SERVICES
Amount: $11,220
Award Description: RECOVERY DEVA 139752 MOD NO. 1 ADDITIONAL CONSTRUCTION MANAGEMENT SERVICES FOR DEATH VALLEY KEANE TRAMWAY STABILIZATION
Amount: $0
Award Description: RECOVERY GATE PMIS #118298, DESIGN - REHAB WEST PORCH VC FIRE EGRESS, GATEWAY NATIONAL RECREATION AREA, SANDY HOOK, NEW JERSEY
Amount: $376,775
Award Description: RECOVERY, NO PMIS, SENIOR COST ESTIMATING SERVICES FOR THE DENVER SERVICE CENTER, LAKEWOOD, COLORADO
Amount: $369,194
Award Description: TAS::14 1041:TAS RECOVERY GLAC # 087500A/C, CONSTRUCTION MANAGEMENT SERVICES, CORRECT CRITICAL HEALTH AND LIFE SAFETY ISSUES AT MANY GLACIER HOTEL, GLAIER NATIONAL PARK, GLACIER COUNTY, MONTANA.
Amount: $8,500
Award Description: PROCUREMENT OF COLOR PRODUCTION COPIER FOR REPRODUCTION OF CONTRACT DOCUMENTS THROUGHOUT THE DURATION OF THE CROW CREEK TRIBAL SCHOOL CONSTRUCTION PROJECT.
Amount: $1,718,505
Award Description: RECOVERY CRCR PMIS#156772 CONSTRUCTION MANAGEMENT (CM) SERVICES FOR THE DESIGN-BUILD CROW CREEK TRIBAL SCHOOL REPLACEMENT PROJECT IN STEPHAN (HYDE COUNTY), SOUTH DAKOTA, 57346-6120
Amount: $130,404
Award Description: RECOVERY DENA PMIS 023409 SUBMITTAL REVIEW, OFFICE SERVICES, SITE VISITS AND AS-BUILT DRAWINGS. FRONT COUNTRY WASTEWATER TREATMENT SYSTEM, DENALI NATIONAL PARK
Amount: $14,817
Award Description: RECOVERY STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE A/E OFFICE SERVICES, SUBMITTAL REVIEW, ON-SITE SERVICES, AND AS-CONSTRUCTED DRAWINGS IN SUPPORT OF THE STABILIZE ELLIS ISLAND SEAWALL CONSTRUCTION PROJECT. THIS MODIFICATION ADJUSTS THE CONTRACT PRICE DUE TO CALCULATION ERROR AT THE TIME OF AWARD.
Amount: $799,048
Award Description: RECOVERY STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE A/E OFFICE SERVICES, SUBMITTAL REVIEW, ON-SITE SERVICES, AND AS-CONSTRUCTED DRAWINGS IN SUPPORT OF THE STABILIZE ELLIS ISLAND SEAWALL CONSTRUCTION PROJECT.
Amount: $69,829
Award Description: TAS::14 1041::TAS RECOVERY GRSM 149646 THIS PROJECT IS TO CONSTRUCT AND OR REHABILITATION TO MAKE ACCESSIBLE COMFORT STATIONS, PICNIC SITES, AND CAMP SITES FOR THOSE WHO ARE DISABLED. EXISTING CAMPSITE AND PICNIC SITES DO NOT MEET THE CURRENT NEED FOR ACCESSIBLE FACILITIES. BOTH PICNIC AND CAMPGROUNDS DO NOT AFFORD THE DISABLED VISITOR THE RANGE OF CHOICE (STREAMSIDE, WOODED, SUNNY) AVAILABLE TO OTHER VISITORS WHO ARE NOT MOBILITY IMPAIRED. WHEN NO CAMPSITES ARE AVAILABLE, SOME DISABLED CAMPERS ATTEMPT TO USE NON-ACCESSIBLE SITES AND PUT THEM AT RISK OF INJURY. PICNIC AREAS ALSO OFFER ONLY A LIMITED NUMBER OF ACCESSIBLE PICNIC SITES WITH SOME AREAS OFFERING NO ACCESSIBLE SITES.
Amount: $111,002
Award Description: RECOVERY KEWE PMIS #152272 REHABILITATION OF THE UNION BUILDING -PHASE 2; KEWEENAW NATIONAL HISTORICAL PARK, HOUGHTON COUNTY, CALUMET, MI; CM SERVICES
Amount: $0
Award Description: TAS:: 14 1041:: TAS RECOVERY TITLE III SERVICES FOR REHAB COMFORT STATIONS AND PICNIC AREAS
Amount: -$2,546
Award Description: TAS::14 1041::TAS RECOVERY GRSM 149646 REHABILITATE COMFORTSTATIONS AND PICNIC AREAS: ARCHITECTURAL/ENGINEERING CONSTRUCTION SERVICES. ALL ARCHITECTURAL, ENGINEERING AND LANDSCAPE ARCHITECTURE DESIGN WORK PRODUCED UNDER THIS TASK ORDER SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES, ACCEPTED INDUSTRY STANDARDS, AND THE SECRETARY OF INTERIOR STANDARDS FOR TREATMENT OF HISTORIC PROPERTIES, 1995. ALL WORK SHALL BE UNDER THE DIRECT SUPERVISION OF A PROFESSIONAL ARCHITECT/ENGINEER/LANDSCAPE ARCHITECT LICENSED IN THE STATE OF NORTH CAROLINA OR TENNESSEE. ALL DESIGN WORK PERFORMED UNDER THIS TASK ORDER SHALL BE STAMPED. THE WORK SHALL CONSIST OF SUBMITTAL REVIEW, COORDINATION OF SUSTAINABILITY REQUIREMENTS, OFFICE SERVICES, AND SITE VISITS AS OUTLINED BELOW. ALL WORK SHALL BE PERFORMED UNDER A SINGLE CONTRACT. ALL WORK PERFORMED ON THE FACILITIES SHALL BE UNDERTAKEN WITH THE UTMOST CARE TO ENSURE THE RESPECT AND PRESERVATION OF NATURAL AND CULTURAL RESOURCES. ALL WORK SHALL PROCEED IN A MANNER THAT WILL MINIMIZE DISRUPTION OF ON-GOING NPS OPERATIONS AND FACILITY MAINTENANCE ACTIVITIES WITHIN THE PARK.
Amount: -$23,279
Award Description: A-E DESIGN SERVICES FOR DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS FOR THE MINT SPRINGS BLUFF STABILIZATION AT VICKSBURG NATIONAL MILITARY PARK, MS
Amount: $19,774
Award Description: TAS:: 14 1041::TAS RECOVERY, OLYM, 005375, GRIFF CREEK CULVERT, AE SERVICES, ADDITIONAL OFFICE SERVICES
Amount: $0
Award Description: EXTEND TASK ORDER COMPLETION DATE FROM AUGUST 2, 2010 TO AUGUST 31, 2010. CUYAHOGA VALLEY NATIONAL PARK, SUMMIT COUNTY, OHIO, 'ELIMINATE FAILING SEPTIC SYSTEMS IN VILLAGE OF EVERETT' CONSTRUCTION PROJECT, A/E CONSTRUCTION SERVICES, CUVA 094479
Amount: $19,681
Award Description: TAS::14 1041:: TAS RECOVERY VAFO PMIS #152410 VALLEY FORGE NATIONAL HISTORICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA ARCHITECT - ENGINEERING SERVICES FOR SUBMITTAL REVIEW, OFFICE SERVICES AND SITE VISITS.
Amount: $0
Award Description: RECOVERY VAFO PMIS #152410 VALLEY FORGE NATIONAL HISTORICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA THIS MODIFICATION IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE TO SEPT. 30, 2010 AT NO COST TO EITHER PARTY.
Amount: $29,927
Award Description: TAS::14 1041::TAS RECOVERY VAFO PMIS# 152410 RECENT CONSTRUCTION IN THE WASHINGTON'S HEADQUARTERS AREA HAS RESULTED IN DRAINAGE ISSUES. IN ORDER TO RESOLVE THESE ISSUES, NPS IS REQUESTING TOPOGRAPHIC SURVEY, AND DRAINAGE ANALYSIS AND RECOMMENDATIONS.
Amount: $0
Award Description: RECOVERY VAFO PMIS #152410, REHABILITATE WASHINGTON'S HEADQUARTERS PHASE III, TOPOGRAPHIC SURVEY. MODIFICATION 0001 IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE JULY 30, 2010 AT NO COST TO EITHER PARTY DUE TO WEATHER DELAYS IMPACTING SURVEY.
Amount: $4,957
Award Description: TAS::14 1041::TAS RECOVERY VAFO PMIS # 152410 THE WORK CONSISTS OF PREPARING PRE-DESIGN, SKEMATIC DESIGN, AND CONSTRUCTION DOCUMENTS FOR THE CANOPIES ADJACENT TO THE HISTORIC TRAIN STATION AT VALLEY FORGE NATIONAL HISTORICAL PARK.
Amount: $0
Award Description: NATIONAL MALL AND MEMORIAL PARKS, NAMA 150274, REHABILITATION OF LINCOLN MEMORIAL REFLECTING POOL AND SURROUNDING AREAS, CONTRACTOR TO REVIEW AND PROVIDE EVALUATION OF ASBESTOS SAMPLING AND TESTING ACTIVITIES AND RESULTANT DESIGN DOCUMENTS.
Amount: $48,300
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL.
Amount: $22,428
Award Description: RECOVERY VICK #150797 MINT SPRINGS BLUFF STABILIZATION, VICKSBURG NATIONAL MILITARY PARK, VICKSBURG, MS
Amount: $37,000
Award Description: RECOVERY GATE PMIS #77297B A/E SERVICES - REPLACE PRIMARY SWITCHGEAR, FLOYD BENNETT FIELD, GATEWAY NATIONAL RECREATION AREA
Amount: $0
Award Description: MODIFICATION 0001. INITIATED TO UPDATE FUNDING LINES WITHIN THE AWARD. NO CHANGE IN SCOPE, PERIOD OF PERFORMANCE OR AWARD AMOUNT.
Amount: $0
Award Description: RECOVERY GATE PMIS #110018, REPLACE AND REHABILITATE HEATING SYSTEM IN HISTORIC HANGER B. GATEWAY NATIONAL RECREATION AREA, BROOKLYN, NY
Amount: $9,799
Award Description: OLYM, ELWHA RIVER RESTORATION, NPI OUTFALL, MISCELLANEOUS MEETINGS AND TASKS ASSOCIATED WITH CONSTRUCTION PROPOSAL REVIEW.
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL. THIS ADMINISTRATIVE MODIFICATION 5 IS ISSUED TO MAKE A CORRECTION TO THE ACCOUNTING CODES.
Amount: $11,300
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL.
Amount: $78,600
Award Description: RECOVERY BLRI PMIS #153096 CONSTRUCTION ADMINISTRATION SERVICES, RECONSTRUCT HISTORIC STONE GUARDWALLS, BLUE RIDGE PARKWAY
Amount: $488,400
Award Description: TAS::14 1041::TAS RECOVERY STLI PMIS # 152319 CONTRACTOR TO PROVIDE CONSTRUCTION DOCUMENTS FOR STABILIZE ELLIS ISLAND SEAWALL.
Amount: $203,877
Award Description: RECOVERY EVER PMIS # 152464 - CONSTRUCTION MANAGEMENT SERVICES FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION PROJECT. THE WORK TO BE PERFORMED UNDER THE CALL ORDER AGAINST THE BPA CONSISTS OF PROVIDING ON-SITE CONSTRUCTION INSPECTION AND ADMINISTRATION, OFFICE SERVICES AND SITE VISITS FOR THE "REPLACE TWO FAILED PLUGS (DAMS) AT CAPE SABLE" CONSTRUCTION CONTRACT. THE PRIMARY DUTIES OF THE CONTRACTOR WILL BE TO PROVIDE ON-SITE CONSTRUCTION MANAGEMENT REPRESENTATIVES TO MANAGE THE NPS CONSTRUCTION CONTRACT.
Amount: $48,229
Award Description: RECOVERY EVER PMIS # 152464 - CM SERVICES FOR CAPE SABLE EVERGLADES NP, FL RE-CONSTRUCTION OF EAST CAPE CANAL AND HOMESTEAD CANAL DAMS - ADMINISTRATIVE MODIFICATION TO CALL ORDER TO CORRECT CONTRACTOR ADDRESS.
Amount: $412,058
Award Description: RECOVERY, PSR MULTIPLE PMIS 129933, 148438, 149859,148500, AML CM SERVICES FOR SEVERAL PARKS IN THE PACIFIC WEST REGION
Amount: $340,573
Award Description: RECOVERY GOGA PMIS#150682 CONSTRUCTION MANAGEMENT (CM) SERVICES FOR THE PHOTOVOLTAIC, BATTERY POWER STORAGE, DIESEL GENERATOR ELECTRICAL SYSTEM, AND REPLACEMENT OF THE ROOF OF THE MAIN CELLHOUSE BUILDING ON ALCATRAZ ISLAND, SAN FRANCISCO COUNTY, CA, 94123-1308, USA.
Amount: $0
Award Description: RECOVERY GOGA PMIS# 150682 NO-COST MODIFICATION TO NATIONAL PARK SERVICE (NPS) BLANKET PURCHASE AGREEMENT (BPA) CALL ORDER FOR CONSTRUCTION MANAGEMENT (CM) SERVICES FOR THE PHOTOVOLTAIC, BATTERY POWER STORAGE, DIESEL GENERATOR ELECTRICAL SYSTEM, AND REPLACEMENT OF THE ROOF OF THE MAIN CELLHOUSE BUILDING ON ALCATRAZ ISLAND. THIS NO-COST MODIFICATION 0001 SIMPLY SHIFTS THE SCHEDULE TO THE LEFT FOR EXISTING LEVEL OF EFFORT CONTAINED IN THE EXISTING SCOPE OF WORK (TO WIT: SUBMITTAL REVIEW OF LONG-LEAD PROCUREMENT ITEMS). MOREOVER, THIS MODIFICATION 0001 SERVES AS GOVERNMENT ACCEPTANCE OF THE VENDOR'S PROPOSED SUBSTITUTION OF KEY PERSONNEL.
Amount: $0
Award Description: RECOVERY CAVE PMIS #116245 CONSTRUCTION MANAGEMENT SERVICES FOR CARLSBAD CAVERNS CONSTRUCTION PROJECT AT LAKE MEAD NATIONAL RECEREATION AREA. MODIFICATION TO ADJUST THE FIRST DAY OF THE PERFORMANCE PERIOD.
Amount: $196,974
Award Description: RECOVERY CAVE PMIS #116245 CONSTRUCTION MANAGEMENT SERVICES FOR CARLSBAD CAVERNS, STRUCTURAL REPAIR AND LEAD BASED PAINT ABATEMENT IN ELEVATOR SHAFT, EDDY COUNTY, NEW MEXICO
Amount: $47,614
Award Description: RECOVERY, OLYM 005375, ELWHA RIVER RESTORATION, GRIFF CREEK CULVERT REPLACEMENT, A/E AND CM SERVICES DURING CONSTRUCTION. SERVIES INCLUDE SUBMITTAL REVIEW, RFI REVIEW, OFFICE SERVICES AND SITE VISITS.
Amount: $826,338
Award Description: TAS::96 3133::TAS ECORSE CREEK FLOOD RISK MANAGEMENT STUDY NORTH BRANCH OF ECORSE CREEK, WAYNE COUNTY, MICHIGAN GENERAL REEVALUATION REPORT THE PURPOSE OF THIS PROJECT IS TO RE-EVALUATE THE FEASIBILITY OF PROVIDING FLOOD DAMAGE REDUCTION MEASURES ALONG ECORSE CREEK, WAYNE COUNTY, MICHIGAN, UNDER THE RIVER AND HARBORS ACT OF 1966.
Amount: $6,440
Award Description: TAS::96 3133::TAS ARRA::YES::ARRA ECORSE CREEK FLOOD RISK MANAGEMENT PROJECT MODIFICATION FOR ADDITIONAL COORDINATION AND ATTENDANCE AT PUBLIC MEETINGS FOR THE PROJECT.
Amount: $75,706
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::323863::RP# FEASIBILITY STUDY OF ABERNATHY CREEK TO INVESTIGATE AND RECOMMEND APPROPRIATE SOLUTIONS TO ACCOMPLISH ECOSYSTEM RESTORATION AND THE DEVELOPMENT OF AN IMPLEMENTATION DOCUMENT.
Amount: $95,741
Award Description: TAS::96 3134::TAS RECOVERY PROJ 6400 GARRISON DAM, A/E DESIGN PLANS AND SPECIFICATION
Amount: $773,172
Award Description: TAS::96 3134::TAS RECOVERY PROJ 6400 GARRISON DAM A/E DESIGN PLANS AND SPECS C PROJC- GARRISOA/E CONTRACT FOR HYDRO-ELECTRICAL DESIGN
Amount: $2,880,937
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::324170::RP# PERIODIC INSPECTIONS OF 79 LEVEE SYSTEMS TO VERIFY PROPER MAINTENANCE, EVALUATE OPERATIONAL ADEQUACY AND STRUCTURAL STABILITY, REVIEW DESIGN CRITERIA TO IDENTIFY CHANGES IN CURRENT DESIGN STANDARDS, IDENTIFY FEATURES TO MONITOR OVER TIME AND IMPROVE THE ABILITY TO COMMUNICATE THE OVERALL CONDITION.
Amount: $273,618
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#:: 32::PR# PREPARE PLANS & SPECIFICATIONS FOR THE REPLACEMENT OF HEADGATE MACHINERY AT PHILPOTT DAM & POWERHOUSE LOCATED IN HENRY AND FRANKLIN COUNTIES ON THE SMITH RIVER IN BASSETT VIRGINIA.
Amount: $0
Award Description: ATN ARRA DM0067
Amount: $0
Award Description: ATN ARRA DM0067
Amount: $0
Award Description: GATE-153150. MODIFICATION NO. 0001 TO EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2010.
Amount: $0
Award Description: GATE-153150. MODIFICATION NO. 0002 TO EXTEND PERIOD OF PERFORMANCE TO MAY 20, 2011.
Amount: $0
Award Description: RECOVERY KEWE PMIS #152272 REHABILITATION OF THE UNION BUILDING -PHASE 2; KEWEENAW NATIONAL HISTORICAL PARK, HOUGHTON COUNTY, CALUMET, MI; CM SERVICES EXTEND POP TO JUNE 30, 2011
Amount: $0
Award Description: RECOVERY; DEVA 139752, 148432, 148500, 150024; AML CMR SERVICES; MOD 3, EXTEND THE PERIOD OF PERFORMANCE FROM 4-30-11 TO 5-14-2011.
Amount: $35,000
Award Description: RECOVERY; DEVA 139752, 148432, 148500, 150024; AML CMR SERVICES; MOD 2 DEFINITIZE COD#2, INCREASE LOE FOR CMR SERVICES AT DEATH VALLEY NATIONAL PARK TO PROVIDE SUPPLEMENTAL SUPPORT TO THE FULL-TIME CMR.
Amount: $0
Award Description: MODIFICATION 0002. EXTENDED PERIOD OF PERFORMANCE TO 01/31/2011. NO CHANGE IN SCOPE, OR AWARD AMOUNT.
Amount: $0
Award Description: MODIFICATION 0003. EXTENDED PERIOD OF PERFORMANCE TO 04/29/2011. NO CHANGE IN SCOPE, OR AWARD AMOUNT.
Amount: -$623
Award Description: RECOVERY VICK-150797 MINT SPRINGS BLUFF STABILIZATION, VICKSBURG NATIONAL MILITARY PARK, VICKSBURG, MS
Amount: $0
Award Description: RECOVERY VICK-150797 MINT SPRINGS BLUFF STABILIZATION, VICKSBURG NATIONAL MILITARY PARK, VICKSBURG, MS. MODIFICATION 0002 TO EXTEND THE PERIOD OF PERFORMANCE TO JUNE 30, 2011, AT NO COST TO EITHER PARTY.
Amount: -$2,739
Award Description: RECOVERY VAFO PMIS #152410 VALLEY FORGE NATIONAL HISTORICAL PARK, MONTGOMERY COUNTY, PENNSYLVANIA THIS MODIFICATION IS ISSUED TO ADJUST THE LEVEL OF EFFORT FOR OFFICE SERVICES.
Amount: $0
Award Description: RECOVERY GRTE PMIS #083219 CONSTRUCTION MANAGEMENT SERVICES FOR GRAND TETON NATIONAL PARK, TETON COUNTY, WYOMING.
Amount: $0
Award Description: RECOVERY EVER PMIS # 152464 - CM SERVICES FOR CAPE SABLE EVERGLADES NP, FL RE-CONSTRUCTION OF EAST CAPE CANAL AND HOMESTEAD CANAL DAMS. MODIFICATION 0002 IS AN ADMINISTRATIVE MODIFICATION TO THE CALL ORDER TO CORRECT THE CONSTRUCTION MANAGEMENT REPRESENTATIVE'S (CMR) LEVEL OF EFFORT, WHICH WAS INCORRECTLY RECORDED ON MODIFICATION 0001. THE CMR'S LEVEL OF EFFORT IS CORRECTED TO REFLECT 1,484 HOURS.
Amount: $0
Award Description: RECOVERY EVER PMIS # 152464 - CM SERVICES FOR CAPE SABLE EVERGLADES NP, FL RE-CONSTRUCTION OF EAST CAPE CANAL AND HOMESTEAD CANAL DAMS. MODIFICATION 0003 EXTENDS THE CALL ORDER FROM APRIL 15, 2011, TO MAY 15, 2011, AT NO COST TO THE GOVERNMENT IN ORDER TO ALLOW THE CONTRACTOR TO FINALIZE POST-CONSTRUCTION WORK.
Amount: $0
Award Description: RECOVERY GOGA PMIS# 150682 NO-COST, BILATERAL MODIFICATION TO NATIONAL PARK SERVICE (NPS) BLANKET PURCHASE AGREEMENT (BPA) CALL ORDER FOR CONSTRUCTION MANAGEMENT (CM) SERVICES TO IDENTIFY/ACCEPT SUSTITUTION OF CONTRACTOR PERSONNEL.
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY,GOGA PMIS#150682, CM SERVICES FOR ALCATRAZ ISLAND PHOTOVOLTAIC, BATTERY POWER STORAGE, DIESEL GENERATIOR AND REPLACEMENT OF THE ROOF ON MAIN CELLHOUSE BUILDING. NO-COST TIME EXTENSION (OCTOBER 31, 2011) TO ALIGN SERVICES WITH ASSOCIATED CONTRUCTION PROJECT.
Amount: $0
Award Description: RECOVERY GOGA PMIS# 150682 NO-COST MODIFICATION TO NATIONAL PARK SERVICE (NPS) BLANKET PURCHASE AGREEMENT (BPA) CALL ORDER FOR CONSTRUCTION MANAGEMENT (CM) SERVICES TO ADD "ROOFING INSPECTIONS" TO SPECIAL INSPECTIONS SCOPE OF SERVICES.
Amount: -$13,533
Award Description: MOD TO DE-OBLIGATE FUNDS TO TREASURY AND CLOSEOUT
Amount: $0
Award Description: RECOVERY CAVE 116245 CONSTRUCTION MANAGEMENT SERVICES FOR STRUCTURAL REPAIR AND LEAD BASED PAINT ABATEMENT IN ELEVATOR SHAFT AT CARLSBAD CAVERNS NATIONAL PARK, NEW MEXICO.
Amount: -$3,231
Award Description: DE-OBLIGATE REMAINING FUNDS FOR CLOSEOUT PROCESS
Amount: $0
Award Description: RECOVERY DENA-WASTEWASTER TREATMENT FACILITY, DENALI NAT'L PARK AND PRESERVE. TITLE III SERVICES. REALLOCATE FUNDS WITHIN TASK ORDER
Amount: $0
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE CROW CREEK TRIBAL SCHOOL CONSTRUCTION PROJECT LOCATED IN STEPHAN, SOUTH DAKOTA.
Amount: $0
Award Description: CONSTRUCTION MANAGEMENT SERVICES UNDER THE BPA WITH NATIONAL PARK SERVICE. PROCUREMENT OF COLOR COPIER FOR REPRODUCTION OF CONTRACT DOCUMENTS THROUGHOUT THE DURATION OF THE PROJECT AT CROW CREEK TRIBAL SCHOOL, SOUTH DAKOTA.
Amount: $25,698
Award Description: CM SERVICES DURING CONSTRUCTION AT THE MANY GLACIER HOTEL, GLACIER NATIONAL PARK, MONTANA. ADD FUNDS FOR PART-TIME CM SERVICES DURING WINTER SHUTDOWN
Amount: $8,287
Award Description: RECOVERY GLAC 087500 A & C CORRECT CRITICAL HEALTH AND LIFE SAFETY ISSUES AT MANY GLACIER HOTEL ADD FUNDS FOR HDR TO HAVE INTERNET SATELLITE INSTALLED AND PAY MONTHLY COSTS.
Amount: $0
Award Description: RECOVERY STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE A/E OFFICE SERVICES, SUBMITTAL REVIEW, ON-SITE SERVICES, AND AS-CONSTRUCTED DRAWINGS IN SUPPORT OF THE STABILIZE ELLIS ISLAND SEAWALL CONSTRUCTION PROJECT. THIS MODIFICATION ADDS WITHIN SCOPE OFFICE SERVICES REQUIRED FOR PERMITTING WORK ON REDESIGN FOR A DIFFERING SITE CONDITION ENCOUNTERED AND ADDS ADDITIONAL SPECIALIZED INSPECTIONS DUE TO INCREASED NEED ON ONGOING CONSTRUCTION CONTRACT. THIS IS A NO COST MODIFICATION, AS THE MOD REALLOCATES THE LEVEL OF EFFORT FOR VARIOUS DISCIPLINES BASED UPON THE NEEDS OF THIS PROJECT.
Amount: $0
Award Description: RECOVERY STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE A/E OFFICE SERVICES, SUBMITTAL REVIEW, ON-SITE SERVICES, AND AS-CONSTRUCTED DRAWINGS IN SUPPORT OF THE STABILIZE ELLIS ISLAND SEAWALL CONSTRUCTION PROJECT. THIS MODIFICATION ADJUSTS THE ALLOCATION OF OFFICE SERVICES AMONGST DISCIPLINES AT NO COST TO EITHER PARTY.
Amount: $117,300
Award Description: RECOVERY STLI PMIS# 152319 STABILIZE ELLIS ISLAND SEAWALL, THE WORK OF THIS TASK ORDER IS TO PROVICE A/E OFFICE SERVICES, SUBMITTAL REVIEW, ON-SITE SERVICES, AND AS-CONSTRUCTED DRAWINGS IN SUPPORT OF THE STABILIZE ELLIS ISLAND SEAWALL CONSTRUCTION PROJECT. THIS MODIFICATION ADDS WITHIN SCOPE OFFICE SERVICES REQUIRED FOR REDESIGN FOR A DIFFERING SITE CONDITION ENCOUNTERED ON THE CONSTRUCTION CONTRACT.
Amount: $0
Award Description: TAS::96 3133::TAS ARRA::YES::ARRA RECOVERYPROJECT#::323959::RP# NEHALEM RIVER FLOOD MODELING FORCITY OF VERNONIA. THIS MODIFICATION EXTENDS THE TASK ORDER COMPLETION DATE FROM 29 OCTOBER 2011 TO 31 JANUARY 2011 AT NO COST TO THE GOVERNMENT.
Amount: $41,714
Award Description: TAS::96 3133::TAS ARRA::YES::ARRA ECORSE CREEK FLOOD RISK MANAGEMENT PROJECT PROJECT NO. 79250 MODIFICATION FOR INCREASING THE NUMBER OF STRUCTURES TO EVALUATE AS A PART OF THE FLOOD RISK DETERMINATION REPORT.
Amount: $0
Award Description: TAS::96 3133::TAS ARRA::YES::ARRA FY10 ECORSE CREEK FLOOD RISK MANAGEMENT PROJECT MODIFICATION ISSUED TO EXTEND THE CONTRACT COMPLETION DATE.
Amount: -$12,377
Award Description: TAS:: 14 1035:: RECOVERY GPRO PMIS# 15409. DEOBLIGATION OF REMAINING FUNDS AS PROJECT IS COMPLETED AND ACCEPTED. CLOSEOUT MODIFICATION.
Amount: $137,521
Award Description: RECOVERY GRTE PMIS #083219 CONSTRUCTION MANAGEMENT SERVICES FOR REHAB MOOSE MAINTENANCE BLDG., GRAND TETON NATIONAL PARK, TETON COUNTY, WYOMING. MODIFICATION TO EXTEND THE PERFORMANCE PERIOD AND ADD FUNDING.
Amount: $0
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE GRAND TETON MOOSE MAINTENANCE BUILDING, JACKSON HOLE, WYOMING
Amount: $0
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE GRAND TETON NATIONAL PARK CONSTRUCTION PROJECT, REHABILITATION OF MOOSE MAINTENANCE BLDGS., PHASES I&II, TETON COUNTY, JACKSON HOLE, WYOMING.
Amount: $0
Award Description: RECOVERY SHEN PMIS #152664 - A/E TITLE III SERVICES FOR THE CONSTRUCTION PROJECT TO "REHABILITATE SIXTEEN HISTORIC OVERLOOKS ALONG SKYLINE DRIVE" -- MODIFICATION 0001 EXTENDS THE PERIOD OF PERFORMANCE OF THE TASK ORDER FROM DECEMBER 31, 2011, TO APRIL 30, 2012, AT NO COST TO THE GOVERNMENT.
Amount: $0
Award Description: RECOVERY SHEN PMIS #152664 - A/E TITLE III SERVICES FOR THE CONSTRUCTION PROJECT TO "REHABILITATE SIXTEEN HISTORIC OVERLOOKS ALONG SKYLINE DRIVE" -- MODIFICATION 0002 IS ISSUED TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT+S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO THE DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: -$197
Award Description: MOD TO DE-OB REMAINING FUNDS AND CLOSE OUT
Amount: -$5,781
Award Description: TAS::14 1041::TAS RECOVERY KEWE PMIS #152272 REHABILITATION OF THE UNION BUILDING -PHASE 2; KEWEENAW NATIONAL HISTORICAL PARK, HOUGHTON COUNTY, CALUMET, MI; CM SERVICES DEOBLIGATE REMAINING FUNDS AND CLOSE-OUT ORDER.
Amount: $39,602
Award Description: CONSTRUCTION MANAGEMENT/INSPECTION SERVICES FOR THE CARLSBAD CAVERNS ELEVATOR PROJECT, EDDY COUNTY, NEW MEXICO
Amount: $0
Award Description: ARRA STLI 152319 STABILIZE ELLIS ISLAND TITLE III SERVICES--THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT+S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO THE DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $0
Award Description: ARRA STLI 152319 STABILIZE ELLIS ISLAND TITLE III SERVICES, NO COST MODIFICATION TRANFER HOURS FROM SITE SERVICES TO OFFICE SERVICES
Amount: $0
Award Description: STLI 152319 ARRA, TITLE III STABILIZE ELLIS ISLAND SEAWALLNO COST TIME EXTENSION ASSIST IN INSPECTION OF PUNCH LIST COMPLETION
Amount: $0
Award Description: WASTE WATER SYSTEM AT DENALI. EXTEND DUE TO DELAYED COMPLETION BY CONTRACTOR OF AS-BUILTS
Amount: $0
Award Description: CONSTRUCTION MANAGEMENT SERVICES FOR THE CROW CREEK TRIBAL SCHOOL, STEPHAN, SOUTH DAKOTA
Amount: $55,028
Award Description: GLAC 087500 CM SERVICES FOR MANY GLACIER HOTEL, GLACIER NATIONAL PARK, ADDITIONAL FUNDING FOR ADDITIONAL WORK.
Amount: $0
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT WITHIN THE CONTRACT LINE ITEM (CLIN) STRUCTURE IN ORDER TO FACILITATE THE GOVERNMENT'S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. ALL TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $9,948
Award Description: TAS::14 1041::TAS RECOVERY - OTHER FUNCTIONS, SENIOR COST ESTIMATOR SERVICER FOR THE DENVER SERVICE CENTER, LAKEWOOD, COLORADO. THIS MODIFICATION INCORPORATES ADDITIONAL HOURS NEEDED FOR CLAIM REVIEW AND SUPPORT AND EXTENDS THE PERIOD OF PERFORMANCE TO SEPTEMBER 30, 2012.
Amount: $0
Award Description: BLUE RIDGE PARKWAY RECONSTRUCT HISTORIC STONE GUARDWALLS, BLRI-153096 A / E CONSTRUCTION SERVICES THIS MODIFICATION SHALL INCORPORATE THE FOLLOWING CHANGES: A. MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT IN ORDER TO FACILITATE THE GOVERNMENT'S CONVERSION TO UPDATED SOFTWARE (FBMS). THIS MODIFICATION MADE CHANGES TO THE DELIVERY, START, AND/OR END DATES, CHANGING EACH CLIN TO BE CONSISTENT WITH THE CURRENT CONTRACT DATES. THIS MODIFICATION DOES NOT CHANGE ANY REQUIREMENTS, FUNDING, DELIVERY, OR PERFORMANCE DATES OF THE CONTRACT. B. THIS MODIFICATION SHALL ALSO CHANGE THE COGNIZANT CONTRACTING OFFICER FROM FRED BROOKE TO TOM LOCKE. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Amount: $0
Award Description: TAS::14 1041::TAS RECOVERY GOGA PMIS #150682 CONSTRUCTION MANAGEMENT (CM) SERVICES FOR THE PHOTOVOLTAIC, BATTERY POWER STORAGE, DIESEL GENERATOR ELECTRICAL SYSTEM, AND REPLACEMENT OF THE ROOF OF THE MAIN CELLHOUSE BUILDING ON ALCATRAZ ISLAND, SAN FRANCISCO COUNTY, CA; EXTEND POP TO JANUARY 31, 2012
Amount: $0
Award Description: OTHER FUNCTIONS ARRA STLI 152319 TITLE III THIS MODIFICATION IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE TO APRIL 30, 2013.
Amount: $0
Award Description: MWR-ARRA-CRCR-156772 CM
Amount: $0
Award Description: MWR-ARRA-CRCR-156772 CROW CREEK TRIBAL SCHOOL, STEPHAN, SOUTH DAKOTA CONSTRUCTION MANAGEMENT SERVICES

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 06
City JEFFERSON
County JEFFERSON
State CO
Zip 80228