contract- RECIPIENT AWARD SUMMARY

BOYD JONES CONSTRUCTION COMPANY

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: General Services Administration Project Location: HALL
Award Number: GSP0609GY5093 Project Location - State: NE
Funding Amount: $0 Project Location - Zip Code: 688021607
Ending Date: 2012-05-02 Congressional District: 03

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: BOYD JONES CONSTRUCTION COMPANY
Recipient Address: 4360 NICHOLAS ST
Recipient City: OMAHA
Recipient State: NE
Recipient Zip Code: 681311032
Congressional District: NE-02

DESCRIPTION OF WORK/SERVICE PERFORMED

NE0018ZZ ARRA UPGRADE HVAC GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PA15 IS ISSUED TO EXTEND THE COMPLETION DATE OF CONTRACT GS06P07GYD0042/GSP0609GY5093 IN COMPRIZON. AWARD ONLY UNTIL 4/30/2012.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $1,814,000
Award Description: RECOVERY TAS::47 4543::TAS THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: (1) PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT, CONSTRUCTABILITY REVIEWS, VALUE ENGINEERING, COST ESTIMATING, SCHEDULE DEVELOPMENT, (2) CONSTRUCTION PHASE SERVICES INCLUDING REPLACEMENT OF SEVEN EXISTING AIR HANDLING UNITS OF VARIOUS SIZES WITH A CENTRAL STATION VARIABLE VOLUME UNIT AT THE GRAND ISLAND FEDERAL BUILDING, 203 W. 2ND STREET, GRAND ISLAND, NE 68801.
Amount: $4,812,000
Award Description: TAS::47 4543::TAS RECOVERY: THE WORK TO BE DELIVERED UNDER THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO: (1) PRE-CONSTRUCTION PHASE SERVICES INCLUDING DESIGN DEVELOPMENT, CONSTRUCTABILITY REVIEWS, VALUE ENGINEERING, COST ESTIMATING, SCHEDULE DEVELOPMENT, (2) CONSTRUCTION PHASE SERVICES INCLUDING INSTALLATION OF NEW ENERGY MANAGEMENT AND CONTROL SYSTEM, PLUMBING FIXTURE REPLACEMENT AND ASSOCIATED RESTROOM RENOVATIONS, REPLACEMENT OF DRINKING FOUNTAINS WITH NEW ELECTRICAL WATER COOLERS, REPLACEMENT OF CABINET UNIT HEATERS AT BUILDING LOBBY, REPLACEMENT OF COOLING TOWER, CEILING SYSTEM REPLACEMENT, NEW WALL PAINTING, CARPET, FLOOR BASE, STAIR COVERING, FLOOR TILE REPLACEMENT, BASEMENT WATER DAMAGE REPAIRS, LANDSCAPING AND SIDEWALK REPLACEMENT, BOILER REPLACEMENT, AND ASBESTOS ABATEMENT AT THE NORTH PLATTE FEDERAL BUILDING/UNITED STATES POST OFFICE/U.S. COURTHOUSE, 300 EAST 3RD STREET, NORTH PLATTE, NE 69101.
Amount: $1,258
Award Description: RECOVERY. GRAND ISLAND FEDERAL BUILDING, 203 WEST 2ND STREET, GRAND ISLAND, NE 68508. PS07 IS ISSUED FOR THE FOLLOWING REASONS: 1) DELETE NEW CARPETING IN OPEN OFFICE RM #107 2) RELOCATE EXISTING SPRINKLER & HYDRONIC LINES 3) ADD NEW TOILET EXHAUST FOR 2ND FLOOR RESTROOMS 4) ADD BURLGAR-BARS 5) RELOCATE EXISTING SANITARY WASTE DRAIN IN OFFICE RM 123.
Amount: $6,624
Award Description: RECOVERY. GRAND ISLAND FEDERAL BUILDING, 203 WEST 2ND STREET, GRAND ISLAND, NE 68508. PS04 IS FOR THE PURPOSE OF MODIFYING LIGHT FIXTURE TYPE THROUGHOUT SPACE.
Amount: $68,820
Award Description: RECOVERY. TAS::47 4543::TAS GRAND ISLAND FEDERAL BLDG, 203 W. 2ND STREET GRAND ISLAND, NE, 68801 PS02 WAS FOR THE PURPOSES OF ABATING EXISTING LEAD-BASED-PAINT EXPOSED DUE TO REMODELING OF THE 1ST & 2ND FLOOR FOR HVAC SYSTEM IMPROVEMENTS. ALSO REQUIRED IS THE ENCAPSULATION OF ALL SURFACES WHERE ABATED.
Amount: -$3,735
Award Description: DELETE DEMOLITION OF EXISTING GLAZING AND LOUVERS
Amount: $0
Award Description: RECOVERY. TAS::47 4543::TAS. GRAND ISLAND FEDERAL BUILDING, 203 W. 2ND STREET, GRAND ISLAND, NE. MOD PA03 IS AN ADMINISTRATION MODIFICATION FOR SYSTEM FUND CODING CHANGES ONLY.
Amount: -$188,389
Award Description: RECOVERY. TAS::47 4543::TAS GRAND ISLAND FEDERAL BLDG, 203 W. 2ND STREET GRAND ISLAND, NE, 68801 CONVERT OPTION 1 - CONSTRUCTION PHASE SERVICES, FROM A GUARANTEED MAXIMUM PRICE TO A FIRM FIXED PRICE.
Amount: $8,076
Award Description: RECOVERY. GRAND ISLAND FEDERAL BUILDING, 203 WEST 2ND STREET, GRAND ISLAND, NE 68508. PS09 IS ISSUED FOR THE PURPOSE OF ADDING SMOKE AND HEAT DETECTORS IN ATTIC.
Amount: -$25,500
Award Description: RECOVERY. GRAND ISLAND FEDERAL BUILDING, 203 WEST 2ND STREET, GRAND ISLAND, NE 68508. PS05 IS FOR THE PURPOSE OF DELETING THE UNNECESSARY CLEANING AND COATING OF NEW DUCTWORK.
Amount: $5,177
Award Description: RECOVERY. GRAND ISLAND FEDERAL BUILDING, 203 WEST 2ND STREET, GRAND ISLAND, NE 68508. PS08 IS ISSUED TO REVISE DUCTWORK TO COMPUTER ROOM 209.
Amount: $1,713,500
Award Description: RECOVERY TAS::47 4543::TAS - THIS ARRA PROJECT IS BEING AWARDED TO BOYD JONES CONSTRUCTION FOR THE HIGH PERFORMANCE GREEN BUILDING PROJECT AT THE SIOUX CITY FB AND COURTHOUSE ON 320 6TH ST IN SIOUX CITY, IA. WITH THIS PROJECT, THE GSA IS PROCURING RETRO-COMMISSIONING SERVICES AND INSTALLING HIGH ENERGY EFFICIENT HVAC AND LIGHTING UPGRADES AT THE SIOUX CITY, IOWA U.S. COURTHOUSE. THESE SERVICES WILL BE IN ACCORDANCE WITH THE REPORT OF FINDINGS PUBLISHED BY THE RETRO-COMMISSIONING AGENT. THE GSA WILL ALSO INSTALL ADVANCE METERING FOR ALL ENERGY SOURCES AND WATER. VARIOUS SCOPE ITEMS WILL BE IDENTIFIED BY THE RETRO-COMMISSIONING REPORT AND RANKED BASED ON BUILDING NEED, ENERGY AND WATER CONSERVATION AND PAYBACK POTENTIAL. HIGHEST RANKING SCOPE ITEMS THAT FALL WITHIN THE PROVIDED FUNDING WILL BE IMPLEMENTED, AND THE REMAINING SCOPE WILL BE INCLUDED AS OPTIONS.
Amount: $12,700
Award Description: KS0092ZZ, FRANK CARLSON FEDERAL BUILDING AND U.S. COURTHOUSE, 444 S.E. QUINCY, TOPEKA, KS 66683 PRE-CONSTRUCTION PHASE SERVICES AND OPTION 1 - CONSTRUCTION PHASE SERVICES THAT INCLUDE THE DESIGN AND CONSTRUCTION OF BUILDING SYSTEMS AFFECTING ENERGY AND INDOOR ENVIRONMENT
Amount: $1,847,700
Award Description: EXERCISING OPTION 2 CONSTRUCTION PHASE SERVICES
Amount: $19,265
Award Description: RECOVERY: ROBERT DENNEY FEDERAL BUILDING & COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. REPLACE BEARINGS AND DRIVE SHAFT OF CHILLER #1, DISCOVERED WHILE RE-TUBING OPERATIONS WERE BEING PERFORMED. PERFORM WORK PER MANUFACTURER'S (TRANE) REQUIREMENTS AND UNDER THEIR SUPERVISION AND/OR CONTROL, AND PROVIDE DOCUMENTATION OF ALL REPAIRS PERFORMED, WITH RELATED COSTS. PROVIDE MANUFACTURER'S STANDARD WARRANTY RELATED TO THE WORK
Amount: $15,000
Award Description: RECOVERY. TAS::47 4543::TAS. EXERCISE OF OPTION 5 FOR ARRA PRE-CONSTRUCTION SERVICES AT THE ROBERT DENNEY FEDERAL BUILDING/U.S. COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. THIS WORK MAY INCLUDE, BUT IS NOT LIMITED TO: IMPROVEMENT IN BUILDING LIGHTING AND HVAC COMPONENT PERFORMANCE.
Amount: $5,289
Award Description: RECOVERY: ROBERT DENNEY FEDERAL BUILDING AND US COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. THIS MODIFICATION IS A SETTLEMENT OF MODIFICATION PC11 THIS MODIFICATION(PS12)IS ISSUED IN THE AMOUNT OF $5,289. MODIFICATION PC11 WAS ISSUED AS A PDL IN THE AMOUNT OF $9,768. THE FIRM PRICE SETTLEMENT (FPS) IS $15,057. THIS MODIFICATION (PS12) IS THE DIFFERENCE BETWEEN THE FPS PRICE OF $15,057 AND THE PDL PRICE OF $9,768.
Amount: $2,181,000
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT DENNEY FEDERAL BUILDING, 100 CENTENNIAL MALL NORTH, LINCOLN, NE. MOD PO03 IS HEREBY ISSUED TO EXERCISE OPTION 6 OF THE CONTRACT FOR THE GUARANTEED MAXIMUM PRICE (GMP) FOR CONSTRUCTION PHASE SERVICES FOR THE ARRA PORTION OF THE CONTRACT.
Amount: $0
Award Description: RECOVERY. TAS::47 4543::TAS. ROBERT DENNEY FEDERAL BUILDING/COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE MOD PA06 IS AN ADMINISTRATIVE MODIFICATION FOR SYSTEM FUND CODING CHANGES ONLY.
Amount: $12,210
Award Description: RECOVERY. ROBERT DENNEY FEDERAL BUILDING AND US COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. PC10 IS FOR THE PURPOSE OF PROVIDING UNFORESEEN, NECESSARY REPAIRS TO THE MOTOR OF CHILLER #3.
Amount: $7,788
Award Description: RECOVERY: ROBERT DENNEY FEDERAL BUILDING AND US COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. THIS MODIFICATION IS A SETTLEMENT OF MODIFICATION PC10. THIS MODIFICATION (PS13) IS ISSUED IN THE AMOUNT OF $7,788. MODIFICATION PC10 WAS ISSUED AS A PDL IN THE AMOUNT OF $12,210. THE FIRM PRICE SETTLEMENT (FPS) IS $19,998. THIS MODIFICATION (PS13) IS THE DIFFERENCE BETWEEN THE FPS PRICE OF $19,998 AND THE PDL PRICE OF $12,210. THE COMPLETION DATE IS BEING EXTENDED 14 DAYS WITH THIS MODIFICATION
Amount: $29,550
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT DENNEY FEDERAL BUILDING & COURTHOUSE 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508 DESCALE EXISTING COOLING SYSTEM PIPING. ADD BYPASS VALVES WITHIN EXISTING SYSTEM AT ROOF LEVEL, AND PROVIDE TRANSFER PIPES AND TEMPORARY VALVES NECESSARY TO FLUSH EXISTING PIPING WITH DE-SCALING ACID. MONITOR PROCESS AND FLUSH SYSTEM CLEAN UPON COMPLETION.
Amount: $0
Award Description: RECOVERY. TAS::47 4543::TAS ROBERT DENNEY FEDERAL BUILDING, 100 CENTENNIAL MALL NORTH, LINCOLN, NE. MOD PS05 IS HEREBY ISSUED TO CONVERT ENERGY CONSERVATION MEASURE ITEMS 4, 5, AND 6 OF THE OPTION 6 SCOPE FROM A GUARANTEED MAXIMUM PRICE TO A FIRM FIXED PRICE.
Amount: $9,768
Award Description: RECOVERY. ROBERT DENNEY FEDERAL BUILDING AND US COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. PC11 WAS ISSUED TO REPLACE WORN BEARINGS ON THE MOTOR OF CHILLER #2, DISCOVERED WHILE RE-TUBING OPERATIONS WERE BEING PERFORMED. PROVIDE MANUFACTURER'S STANDARD WARRANTY RELATED TO THIS WORK.
Amount: $0
Award Description: RECOVERY: TAS: 47 4543 001 TAS. ROBERT DENNEY FEDERAL BUILDING/COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE. MOD PA16 IS AN ADMINISTRATIVE MOD TO CHANGE IN ALLOCATION OF FUNDING. ZERO DOLLAR ADMINISTRATIVE MODIFICATION DOES NOT CHANGE THE DOLLAR VALUE OF THE CONTRACT.
Amount: $2,910
Award Description: RECOVERY: DENNEY FEDERAL BUILDING & COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. MODIFICATION PS17 IS ISSUED TO ADD COOLING-TOWER PURGE WATER METER, REPLACE COOLING TOWER MAKE-UP WATER METER, ELECTRONIC OUT-READERS FOR METERS
Amount: $57,442
Award Description: RECOVERY: ARRA (KS0070ZZ) COURTROOM AND CHAMBERS RENOVATION N0875109 U.S. COURTHOUSE 401 N. MARKET STREET WICHITA, KS 67202 MODIFICATION PS02 IS ISSUED TO PROVIDE ALL HVAC WORK INCLUDING SHEET METAL, TEMPERATURE CONTROLS, TEST AND BALANCE, ETC. AS INDICATED ON THE CONSTRUCTION DOCUMENTS. COMPLETE LEAD-BASED PAINT ABATEMENT OF PAINT CHIPS ON/ABOVE EXISTING CEILING. COMPLETE CLEARANCE TESTING. COMPLETE DEMOLITION OF EXISTING CEILING AS REQUIRED TO COMPLETE HVAC WORK. PROVIDE GENERAL CONDITIONS. ARRA FUNDING FROM WICHITA ARRA AIR HANDLER REPLACEMENT PROJECT (IKS00005) WAS USED FOR THIS MODIFICATION TO COMPLETE THE HVAC AND RELATED PORTIONS OF THE PROJECT.
Amount: $34,655
Award Description: RECOVERY: ARRA (NE0018ZZ) ARRA UPGRADE HVAC SYSTEM RNE00045 GRAND ISLAND FEDERAL BUILDING 203 W. 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PS10 IS ISSUED TO PROVIDE ENERGY MANAGEMENT CONTROLS ENHANCEMENTS,ADVANCED METERING OF ELECTRICAL SERVICE, ADVANCED METERING OF NATURAL-GAS SERVICE, ADVANCED METERING OF WATER SERVICE, AND AN EMC SYSTEM UPGRADE FOR FUTURE CONNECTION TO GSA LAN.
Amount: $2,710
Award Description: GALVANIZE EXTERIOR MISC. STEEL RAILINGS
Amount: $337,179
Award Description: RECOVERY. TAS::47 4543::TAS NORTH PLATTE FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE PS01 IS TO CONVERT OPTION 1 AND OPTION 2 (CONSTRUCTION PHASE SERVICES) FROM A GUARANTEED MAXIMUM PRICE TO A FIRM FIXED PRICE BASED ON THE 100% CONSTRUCTION DOCUMENTS AND ACCOUNTING FOR ALL CHANGES MADE DURING THE DESIGN PHASE/PRECONSTRUCTION PHASE SERVICES.
Amount: $15,887
Award Description: OVER-EXCAVATE FOUNDATION SUB-GRADE
Amount: $12,111
Award Description: RECOVERY. NORTH PLATTE FEDERAL BUILDING, 300 E 3RD STREET, NORTH PLATTE, NE 69101. PS05 IS ISSUED FOR ICE HARDWARE MODIFICATIONS.
Amount: -$1,337,567
Award Description: RECOVERY. NORTH PLATTE FEDERAL BUILDING 300 E. 3RD STREET NORTH PLATTE, NE 69101 PA02 WAS ISSUED AS AN ADMINISTRATIVE MODIFICATION TO REALLOCATE FUNDING APPROPRIATELY.
Amount: -$2,250
Award Description: RECOVERY. NORTH PLATTE FEDERAL BUILDING, 300 E 3RD STREET, NORTH PLATTE, NE 69101. PS04 IS ISSUED TO ACCOUNT FOR SCHEDULE IMPACT OF VALUE ENGINEERED ITEMS AND DELETE COST-LOADED SCHEDULE REQUIREMENT.
Amount: $1,337,567
Award Description: RECOVERY BLDG: NE0056ZZ NORTH PLATTE FEDERAL BUILDING 300 E. 3RD STREET NORTH PLATTE, NE 69101. PA023 WAS ISSUED AS AN ADMINISTRATIVE MODIFICATION TO REALLOCATE FUNDING APPROPRIATELY
Amount: $0
Award Description: ADMINISTRATIVE CHANGES TO FUNDING STRINGS
Amount: $4,888
Award Description: RECOVERY. NORTH PLATTE FEDERAL BUILDING, 300 E 3RD STREET, NORTH PLATTE, NE 69101. PS09 IS ISSUED TO ADD LEAD BASED PAINT ABATEMENT AT DOCK DOORS.
Amount: $0
Award Description: RECOVERY - SIOUX CITY FB AND COURTHOUSE AT 320 6TH ST IN SIOUX CITY, IA - PA02, FOR DELIVERY ORDER GS-06P-07-GYD-0042/GS-P-06-10-GZ-5033, IS HEREBY ISSUED TO CHANGE THE PEGASYS DOCUMENT NUMBER (PDN) FROM PN0F00352 TO PN0F00853. PDN - PN0F00853 MUST BE PRESENT ON ALL INVOICES FROM THE EFFECTIVE DATE OF THIS MODIFICATION UNTIL THE SUBMISSION OF FINAL PAYMENT.
Amount: $118,655
Award Description: RECOVERY - THIS ARRA PROJECT IS CALLED THE HIGH PERFORMANCE GREEN BUILDING, FOR THE SIOUX CITY, IA FEDERAL BUILDING AND COURTHOUSE LOCATED AT 320 6TH ST.
Amount: $7,971
Award Description: MODIFICATION TO INSPECT HVAC DUCT AT NW AIR HANDLER, INSTALL THREE(3)INSPECTION PANELS, AND INSPECT SOLAR HOT WATER SYSTEM.
Amount: -$7,971
Award Description: MODIFICATION TO DE-OBLIGATE THE FUNDING IN COMPRIZON ONLY. FUNDS WERE ALREADY OBLIGATED AT THE BEGINNING OF CONTRACT AWARD.
Amount: $4,168
Award Description: RECOVERY: ARRA NE0018ZZ ARRA UPGRADE HVAC SYSTEM GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PS11 IS ISSUED TO PROVIDE FOR A DIFFERENT ADVANCED ELECTRICAL METER MODEL.
Amount: $11,760
Award Description: RECOVERY: ARRA NE0018ZZ UPGRADE HVAC SYSTEM GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PS12 IS ISSUED TO CONNECT BMS AND ADVANCED METERS TO GSA NETWORK AND TO CHANGE NETWORK WIRING.
Amount: $11,625
Award Description: RECOVERY: ARRA NE0018ZZ UPGRADE HVAC SYSTEM GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PS13 IS ISSUED TO PROVIDE AND INSTALL ADS SOFTWARE TO THE GOVERNMENT FURNISHED SERVER. WORK SHALL ALLOW REMOTE ACCESS TO THE BAS. LEAD TIME 4 WEEKS AFTER APPROVAL.
Amount: $7,920
Award Description: RECOVERY: ARRA (NE0018ZZ) HVAC UPGRADE RNE00045 FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PS14 IS ISSUED TO UPGRADE THE ADS SOFTWARE TO ADX AND TO ESTABLISH AN OWNER CONTROLLED ALLOWANCE INTENDED FOR ADVANCED METERING WORK.
Amount: -$3,212
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS19 IS ISSUED TO INCLUDE: SPRINKLER PIPE RELOCATION, ROOF DRAIN PIPE RELOCATION, ELECTRICAL PANEL MODIFICATIONS, AND RELOCATION OF EXISTING WASTE STACK. AS WELL AS, DELETE SIGNAGE ALLOWANCE.
Amount: $2,822
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS21 IS ISSUED TO ADD 3 "COMBO" LOCKSETS WITH KEY-OVERRIDE TO SINGLE DOORS 112.2 AND 112.3, AND THE DOOR PAIR #111.3 WITHIN THE USPS AREA; AND REPLACE DOOR PANELS WITH NEW WOOD DOORS MACHINED FOR THE COMBO-LOCKSETS, IN LIEU OF PROVIDING COVER PLATES OR OTHER ADAPTERS NECESSARY TO MODIFY THE EXISTING HARDWARE PREPARATION.
Amount: $1,616
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS26 IS ISSUED TO REPLACE THE DRAIN PIPING ABOVE 3RD FLLOR BATHROOMS.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS36 PER THE SCOPE OR WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PS36 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: ITEM 1 FROM P-28A IS HEREBY ACCEPTED AND CONVERTED TO AN OWNER CONTROLLED ALLOWANCE IN THE AMOUNT OF $12,142.00 TO ALLOW FOR COSTS ASSOCIATED WITH THE PARKING LOT EXCAVATION AND ITEMS LISTED BELOW (DOOR HARDWARE, AUTO FILL, AND DETENTION GLASS). (REFERNCE CONTRACTOR'S PROPOSAL P-37 ITEM 1) DOOR HARDWARE AT 197.1: ADD PANIC DEVICE WITH DOOR PULL TO HARDWARE SET FOR DOOR 197.1. (REFERENCE CONTRACTOR'S PROPOSAL P-37 ITEM 2) AUTO FILL AT DRAIN DOWN TANKS PROVIDE A SERIES 1000, 303 STAINLESS STEEL, FOUR FLOAT SENSOR MANUFACTURED BY LIQUID LEVEL (HTTP://WWW.LIQUIDLEVEL.COM/RFQ_1000_STAINLESS.HTM) - SEE THE ATTACHED SKETCH. SINCE THE END OF THE SENSOR IS ONLY 1/2" DIAMETER AND THREADED, WE SHOULD BE ABLE TO SUPPORT THE SENSOR FROM THE TOP OF THE TANK WITHOUT REQUIRING THE TANK MANUFACTURER MAKING A SITE VISIT. WE WILL NEED TO VERIFY WITH THEM REGARDING SENSOR WEIGHT AND DRILLING A SMALL HOLE. THE TEMPERATURE CONTROL CONTRACTOR CAN FURNISH, INSTALL, AND WIRE THE SENSORE UNDER THIS APPROACH. (REFERENCE CONTRACTOR'S PROPOSAL P-37 ITEM 3) DETENTION GLASS PROVIDE CLEAR SECURITY GLASS AT DOORS 193.1 AND 195.3 TO MATCH GLASS AT WINDOW TYPE 3 AT VISITOR ROOM 179.
Amount: $1,528
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS22 MODIFICATION PS22 IS ISSUED TO RELOCATE EXISTING GSA-NETWORK ROUTER AND SWITCH AND CHANGE CONTROL WIRING TYPE TO CAT 6E.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS10 IS ISSUED TO PROVIDE FOR THE MOVING AND RELOCATION OF EXISTING WOODWORK AND ELECTRICAL MATERIAL IN THE UNITED STATES POSTAL SERVICE SPACE.
Amount: -$1,270
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS11 IS ISSUED TO PROVIDE A CREDIT FOR CHANGING TO A LESS EXPENSIVE FLOOR DRAIN (-163.00), PROVIDE A CREDIT FOR DELETION OF TILE (-880.00), PROVIDE PAINT AT THE NORTH WALL OF THE SALLY PORT (0.00), REMOVE COMPUTER WORKSTATION FOR BAS SYSTEM (-725.00), AND INCREASE THE SIZE OF MINI-SPLIT SYSTEM TO A 2 TON UNIT (498.00).
Amount: $5,106
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PC14 IS ISSUED TO PROCEED WITH PHONE WORK FOR THE UNITED STATES POSTAL SERVICE SPACE AND THE UNITED STATES IMMIGRATION AND CUSTOMS ENFORCEMENT SPACE AT A PRICE- TO- BE-DETERMINED LATER BASIS, NOT TO EXCEED $5,106.00.
Amount: $8,010
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS13 IS ISSUED TO PROVIDE FOR CONCRETE MASONRY UNIT WORK AT EXISTING OVERHEAD DOORS.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 PER THE SCOPE OR WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PS29 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: FIRM FIX PRICE OF PDL FOR USPS PHONE&ICE PHONE WORK AND ADD BAS PROGRAM ONTO GSA PROVIDED SERVER.
Amount: $22,590
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS16 IS ISSUED TO RELOCATE BUILDING CONFERENCE ROOM #321.
Amount: $69,764
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PC23 IS ISSUED TO PROVIDE: OWNER CONTROLLED ALLOWANCES (ITEMS 1-4) THE OWNER (GSA) HAS SOLE DISCRETION OVER THE USE OF THESE ALLOWANCE FUNDS. AT THIS TIME THE CONTRACTOR IS NOT AUTHORIZED TO PROCEED WITH THIS WORK. SUBSEQUENT CONTRACT MODIFICATIONS (SF30) WILL BE ISSUED TO IDENTIFY DETAILED SCOPE, NEGOTIATED FIRM FIXED PRICE, AND PROVIDE THE CONTRACTOR WITH AUTHORIZATION TO PROCEED. ANY FUNDS NOT USED, AT THE GSA+S SOLE DISCRETION, WILL BE CREDITED BACK TO THE GOVERNMENT. ALLOWANCE FOR BASEMENT INJECTION-WATERPROOFING - PROVIDE INJECTION WATERPROOFING OF "SECONDARY" AREAS NOTED ON ATTACHED DRAWING 3 (PLAN). ALLOWANCE FOR BASEMENT FLOOR FINISH - ADD BASEMENT FLOOR FINISH THROUGHOUT ENTIRE BASEMENT AREA CONSISTING OF MANUFACTURER'S RECOMMENDED FLOOR PREPARATION AND APPLICATION OF TWO (2) COATS OF EPOXY PAINT, EQUAL TO SHERWIN WILLIAMS TILE-CLAD HIGH SOLIDS SERIES FINISH. COMPLY WITH MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES. ALLOWANCE TO PROVIDE STAIR FINISHES - PROVIDE PAINT AND FLOORING FINISHES AS PREVIOUSLY SPECIFIED AT EXISTING STAIR TOWERS. ALLOWANCE FOR WINDOW FILM AT EAST AND WEST - PROVIDE PREVIOUSLY SPECIFIED WINDOW FILM AT ALL WINDOWS AT EAST AND WEST ELEVATIONS OF BUILDING.
Amount: $17,590
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS25 IS ISSUED TO: ADD OUTDOOR AIR AND HUMIDITY SENSOR, VFD AT AHU-2, AND REPLACE COOLING TOWER CONTROL VALVE.
Amount: $3,500
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS17 IS ISSUED TO PAINT EXISTING CORRIDOR AND LOBBY DOOR FRAMES AT 2ND AND 3RD FLOOR. REMOVE LOOSE PAINT, SAND SMOOTH, AND RE-PAINT.
Amount: $19,178
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 THE OWNER (GSA) HAS SOLE DISCRETION OVER THE USE OF THESE ALLOWANCE FUNDS. AT THIS TIME THE CONTRACTOR IS NOT AUTHORIZED TO PROCEED WITH THIS WORK. SUBSEQUENT CONTRACT MODIFICATIONS (SF30) WILL BE ISSUED TO IDENTIFY DETAILED SCOPE, NEGOTIATED FIRM FIXED PRICE, AND PROVIDE THE CONTRACTOR WITH AUTHORIZATION TO PROCEED. ANY FUNDS NOT USED, AT THE GSA+S SOLE DISCRETION, WILL BE CREDITED BACK TO THE GOVERNMENT. PER THE SCOPE OR WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PC24 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: ITEM 1: ALLOWANCE FOR 12" OVEREXCAVATION AT SALLEYPORT. ITEM 2: ALLOWANCE FOR LIGHTS AT NEW DOCK. ITEM 3: ALLOWANCE FOR FIN-TUBE REPLACEMENT. ITEM 4: ALLOWANCE FOR FIXED STOOL IN ICE INTERVIEW ROOM. BASEMENT INJECTION-WATERPROOFING- PROVIDE INJECTION WATERPROOFING OF "SECONDARY" AREAS NOTED ON ATTACHED DRAWING 3 (PLAN). ITEM 2 FROM PC23 IS HEREBY CONVERTED FROM AN ALLOWANCE TO A FIRM FIXED PRICE AND THE CONTRACTOR IS GIVEN PERMISSION TO PROCEED WITH THIS WORK.
Amount: -$58,688
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS15 IS ISSUED TO DELETE ALL WORK ASSOCIATED WITH THE CONSTRUCTION OF TWO NEW RESTROOMS IN THE UNITED STATES POSTAL SERVICE SPACE, TO DELETE ALL WORK ASSOCIATED WITH REMODELING THE 3RD FLOOR CONFERENCE ROOM, AND TO DELETE ALL WORK ASSOCIATED WITH WATERPROOFING AT THE WEST ELEVATION.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS33 PER THE SCOPE OR WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PS33 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: (REFERENCE CONTRACTOR'S PROPOSAL P-38, ITEM 1) ADD INTERFACE PANEL AT EXISTING ELECTRIC METER: ADD REQUIRED INTERFACE PANEL AND ACCESSORY CONNECTORS OR OTHER COMPONENTS REQUIRED FOR ELECTRONIC SIGNALS TO BE RECEIVED FROM THE GAS AND WATER METERS AT THE EXISTING "ADVANCED ELECTRICAL" METER. THIS ITEM IS TO BE FUNDED FROM THE BALANCE OF P-29/PC23 ITEM 4 ALLOWANCE FOR $2,900 ($15,736.00 REMAINING IN THE ALLOWANCE).
Amount: $39,563
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS18 IS ISSUED TO ADD INJECTION WATERPROOFING USING A SOLVENT FREE, WATER CONTROL AND SOIL STABILIZATION INJECTION RESIN EQUAL TO ST-504 BY STRATA TECH, INC. OR APPROVED EQUIVALENT, AT THE "PRIMARY" AREAS OF THE BASEMENT WALLS PER THE JANUARY 4 PROPOSAL AND DRAWING 3 (PLAN) AND 4 (SECTIONS) BY URETEK ICR HEARTLAND.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS32 PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PS32 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: (REFERENCE CONTRACTOR'S PROPOSAL P-27R, ITEM 1) NEW EXTERIOR LIGHTING AT USPS DOCK: ON SHEET ES-1-01, PROVIDE 1 FIXTURE #B ON EXTERIOR WALL CENTERED BETWEEN USPS OVERHEAD DOORS AND 18" ABOVE TOP OF DOOR OPENING TO CENTER OF FIXTURE. CIRCUIT FIXTURE TO EXISTING PHOTOCELL CONTROLLED CIRCUIT. THIS ITEM IS TO BE FUNDED FROM THE BALANCE OF P-30/PC24 ITEM 1 ALLOWANCE FOR $762 ($18 REMAINING IN ITEM 1 ALLOWANCE) AND FROM ITEM 2 ALLOWANCE FOR $2,100.
Amount: -$846
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS12 IS ISSUED TO PROVIDE A CREDIT FOR REMOVING A CARD PRINTER AND ASSOCIATED ACCESSORIES, ADJUST FIRE BARRIER WALL, FOR WALL INFILL FOR EXISTING NORTH WALL OF ROOM 144, PROVIDE A CREDIT FOR ALTERING FINISHES AT SECURE RECEPTION 110 PER REMOVED HARDWARE COMPONENTS, AND PROVIDE A CREDIT FOR REPLACING FLOOR FINISH AT RAMP 197.
Amount: $10,555
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 MODIFICATION PS20 IS ISSUED TO INCLUDE FLOOR LEVELING AT CORRIDOR 112, ICE DETENTION AREA, AND ROOMS 151&152 AND FLOOR GRINDING AT ROOMS 146&147.
Amount: $0
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS34 PER THE SCOPE OR WORK ATTACHED AND HEREBY INCORPORATED, BOYD JONES CONSTRUCTION, MODIFICATION PS34 IS ISSUED TO INCORPORATE THE FOLLOWING SCOPE OF WORK: (REFERENCE CONTRACTOR'S PROPOSAL P-39 ITEM 1) ADD WD TRIM TOP AND BOTTOM OF COURTROOM PANELING: ADD A CONTINUOUS WALNUT TRIM RAILING AT BOTH THE TOP AND BOTTOM OF THE EXISTING WOOD PANELING, ALL AROUND THE 3RD FLOOR COURTROOM. INCLUDE MATCHING WOOD FILLERS BETWEEN PANELS AT THE BOTTOM RAILS. FINISH WOOD TRIM TO MATCH EXISTING FINISH OF PANELS AND THE NEW WOOD TRIM MOUNTED ABOVE TO THE GREATEST EXTENT FEASIBLE. THIS ITEM IS TO BE FUNDED FROM THE BALANCE OF P-29/PC23 ITEM 4 FOR $3,264 ($12,472 REMAINING IN THE ALLOWANCE).
Amount: $0
Award Description: RECOVERY - FIRE SPRINKLER/FIRE ALARM ARRA PROJECT, ROBERT DENNEY FEDERAL BUILDING, U.S. COURTHOUSE, 100 CENTENNIAL MALL NORTH, LINCOLN, NE. MOD PC37 IS A PDL ISSUED TO PROVIDE FOR A TRANE REPRESENTATIVE TO BE ONSITE AND PARTICIPATE IN THE FINAL COMMISSIONING PROCESS TO BE CONDUCTED ON AUGUST 30, 2011. THIS IS A DRAW DOWN OF $1473.00 ON GOVERNMENT CONTROLLED FUNDS PREVIOUSLY OBLIGATED.
Amount: $135,273
Award Description: OWNER CONTROLLED ALLOWANCES (ITEM 1) THE OWNER (GSA) HAS SOLE DISCRETION OVER THE USE OF THESE ALLOWANCE FUNDS. AT THIS TIME THE CONTRACTOR IS NOT AUTHORIZED TO PROCEED WITH THIS WORK. SUSEQUENT CONTRACT MODIFICATIONS (SF30) WILL BE ISSUED TO IDENTIFY DETAILED SCOPE, NEGOTIATED FIRM FIX PRICE, TIME EXTENTION IF OR AS REQUIRED, AND PROVIDE THE CONTRACTOR WITH AUTHORIZATION TO PROCEED. ANY FUNDS NOT USED, AT THE GSA'S SOLE DISCRETION, WILL BE CREDITED BACK TO THE GOVERNMENT. ITEM 1: ADD HVAC RETRO-COMMISSIONING&VALIDATION PROVIDE AN ALLOWANCE AMOUNT FOR RETRO-COMMISSIONING OF THE EXISTING BUILDING'S HEATING, VENTILATION, AND COOLING SYSTEM IN COORDINATION WITH THE NEW EQUIPMENT INSTALLED UNDER THE WORK SCOPE OF THIS CONTRACT, TO INCLUDE BUT NOT LIMITED TO VALIDATION OF ENERGY EFFICIENT OPERATIONS FROM THE NEW BUILDING MANAGEMENT SYSTEM AND ENHANCED CONTROL SYSTEMS. VERIFY ALL CONTROL POINTS ARE OPERATIONAL FROM REMOTE COMPUTER ACCESS THROUGH THE GSA NETWORK.
Amount: $0
Award Description: ARRA RECOVERY: PS36 IS TO FIRM UP PC35 WHICH WAS A PDL. THE DIFFERENCE OF $3,512.00 WILL BE DEDUCTED FROM THE OWNER CONTROLLED ALLOWANCE. THEREFORE THIS IS A ZERO DOLLAR MODIFICATION.
Amount: $0
Award Description: RECOVERY - ARRA PDL TO INSTALL A FILTER ON THE CLOSED LOOP: PROVIDE AND INSTALL AN IRON PARTICULATES FILTER WITH BACK FLUSH CAPABILITIES ON THE CHILLED WATER CLOSED LOOP. CLEAN THE FILTER UNTIL THE SYSTEM IS AT ACCEPTABLE LEVEL OF PARTICULATES. THIS IS A DRAW DOWN ON FUNDS PREVIOUSLY OBLIGATED.
Amount: $0
Award Description: THIS MODIFICATION IS TO FIRM UP PC30 WHICH WAS A PDL FOR $5,000. THE FUNDS FOR THIS MODIFICATION WERE DEDUCTED FROM THE CONSTRUCTION ALLOWANCE THAT WAS OBLIGATED TO THE CONTRACTOR ALREADY. THE FIRM UP PRICE IS $4,831 SO A CREDIT OF $169 WILL BE CREDITED BACK TO THE CONSTRUCTION ALLOWANCE POOL.
Amount: $0
Award Description: MOD PS34, RECOVERY ACT - DENNEY FB FS/FA, 100 CENTENNIAL MALL NORTH, LINCOLN, NE PROVIDE MONTHLY TESTING, MONITORING, AND CALIBRATION OF THE COOLING TOWERS AND PULSE PURE SYSTEM THROUGH AUGUST 31, 2011, IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. CLEAN AND CALIBRATE THE PULSE PURE SYSTEM ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AS PART OF THE MONTHLY INSPECTION.
Amount: $18,515
Award Description: RECOVERY - DENNEY FEDERAL BUILDING 100 CENTENNIAL MALL NORTH, LINCOLN, NE 1. REVISE CONNECTION LOCATION TO GSA SWITCH 2. NETWORK ACCESS FROM MECHANICAL ROOMS 3. ADDITIONAL CABLES AT SWITCH TO SERVER
Amount: $0
Award Description: ARRA - RECOVERY ACT PS33 IS TO REPLACE AND REMOVE THE IMPELLERS ON CP-1 AND CP-3 TO MEET THE DESIGN REQUIREMENTS OF 1200GPM AND 116 TOTAL DYN HEAD FT. ALSO PROVIDE A NEW TAB REPORT FOR CP-1 AND CP-3 TO VERIFY THAT THE NEW IMPELLERS MEET THE DESIGN REQUIREMENTS. THE FUNDS FOR THIS MODIFICATION WERE DEDUCTED FROM THE CONSTRUCTION ALLOWANCE THAT WAS OBLIGATED TO THE CONTRACTOR PREVIOUSLY.
Amount: $0
Award Description: MODIFICATION TO FIRM FIX PRICE P-12, WHICH PROVIDES ADDITIONAL VAV SCOPE AND INSTALLATION, PURCHASE VAVS AND ASSOCIATED GRILLES AND DIFFUSERS AND PROVIDE A PRICE FOR ADDITIONAL HEAT REJECTION SYSTEM AS RECOMMENDED BY SOLAR PANEL MANUFACTURER. THIS IS A ZERO-DOLLAR MODIFICATION AND DOES NOT INCREASE THE DOLLAR VALUE OF THE CONTRACT. THE PROJECT LOCATION IS: FRANK CARLSON FB AND US COURTHOUSE 444 SE QUINCY TOPEKA, KS 66603-3503
Amount: -$350
Award Description: ARRA BLDG: KS0092ZZ FRANK CARLSON FEDERAL BUILDING&USCH 444 SE QUINCY TOPEKA, KS 66603-3503 RKS00044 GS-06P-07-GYD-0025/GS-P-06-10-GY-5046/PS17 REVISED E.501 PROVIDE A DEDUCT TO REPLACE DRAWING E.501 DATED NOVEMBER 24,2010 WHICH WAS INCORPORATED INTO THE CONTRACT AS PART OF THE FIRM FIXED PRICE WITH E.501 WITH THE MOST RECENT EDITS DATED MAY 3, 2011. DEDUCTS SHOULD INCLUDE ONLY THOSE ITEMS THAT ARE IN ADDITION TO THE DOCUMENT DATED NOVEMBER 24, 2010.
Amount: -$469
Award Description: MODIFICATION TO DE-OBLIGATE $439.00 FROM PS06 DUE TO AN ERROR
Amount: $210,813
Award Description: RECOVERY, KS0092ZZ FRANK CARLSON FB AND USCH 444 S.E. QUINCY, TOPEKA, KS MODIFICATION FOR HVAC AND ADVANCED METERING WORK.
Amount: $135,000
Award Description: MODIFICATION TO INCREASE PRICE OF EVENTUALITIES
Amount: $52,000
Award Description: MODIFICATION IS BEING ISSUED TO INCREASE THE PRICE FOR EVENTUALITIES. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR MUST SUBMIT PRICING PER THE REQUIREMENTS OF THE BASE CMC CONTRACT. THE CONTRACTOR IS NOT AUTHORIZED TO PROCEED WITH WORK UNTIL AUTHORIZED BY GSA.
Amount: $0
Award Description: PDL FOR DEMOLITION ONLY, NOT TO EXCEED $23,621. THIS IS A ZERO-DOLLAR MODIFICATION AND DOES NOT INCREASE THE DOLLAR VALUE OF THE CONTRACT.
Amount: $361,786
Award Description: MODIFICATION PS04 OF CONTRACT GS-06P-07-GYD-0042/GS-P-06-10-GZ-5033 FOR THE HIGH PERFORMANCE GREEN BUILDING PROJECT (IIA00017) AT THE SIOUX CITY FB AT 316-320 SIXTH STREET IN SIOUX CITY, IA IS HEREBY ISSUED AS A FIRM-FIXED-PRICE SETTLEMENT FOR OPTION 1 CONSTRUCTION PHASE SERVICES. CONSTRUCTION PHASE SERVICES ARE DETAILED IN THE 100% CONSTRUCTION DOCUMENTS (DATED: NOVEMBER 22, 2010) AND ISSUED TO BOYD JONES CONSTRUCTION ON NOVEMBER 30, 2010.
Amount: -$5,651
Award Description: ARRA HVAC UPGRADE NE0018ZZ GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PC16 IS ISSUED TO DEOBLIGATE THE REMAINING FUNDS OF THE "OWNER CONTROLLED ALLOWANCE", PER PS14, NOT USED.
Amount: $0
Award Description: NE0018ZZ ARRA UPGRADE HVAC GRAND ISLAND FEDERAL BUILDING 203 WEST 2ND STREET GRAND ISLAND, NE 68802-1607 MODIFICATION PA15 IS ISSUED TO EXTEND THE COMPLETION DATE OF CONTRACT GS06P07GYD0042/GSP0609GY5093 IN COMPRIZON. AWARD ONLY UNTIL 4/30/2012.
Amount: -$2,515
Award Description: MODIFICATION TO DE-OBLIGATE FUNDS FROM CONTRACT AMOUNT. PROJECT COMPLETE AND EXISTING FUNDS NO LONGER REQUIRED.
Amount: -$15,413
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 GS-06P-07-GYD-0042/GS-P-06-09-GY-5046/PS41 (REFERENCE CONTRACTOR'S PROPOSAL P-46, ITEM #1) CREDIT/DESCOPE COURTROOM SENSOR: LABOR AND MATERIAL ASSOCIATED WITH THE LIGHTING SENSOR IN THE COURTROOM ON THE 3RD FLOOR. (REFERENCE CONTRACTOR'S PROPOSAL P-46, ITEM #2) CREDIT/DESCOPE PAINTING OF EQUIPMENT PADS: EPOXY PAINTING OF EQUIPMENT PADS IN THE BASEMENT. (REFERENCE CONTRACTOR'S PROPOSAL P-46, ITEM #3) CREDIT/DESCOPE STAIR TREADS: LABOR AND MATERIAL ASSOCIATED WITH THE STAIR TREADS AND EPOXY FINISHES INDICATED IN P-19. (REFERENCE CONTRACTOR'S PROPOSAL P-46, ITEM #4) CREDIT/DESCOPE WEED BARRIER: LABOR AND MATERIAL ASSOCIATED WITH THE WEED BARRIER IN ALL SITE PLANTINGS.
Amount: $10,113
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 (REFERENCE CONTRACTOR'S PROPOSAL P-45, ITEM #1) ADD DOOR SENSORS: PROVIDE EXIT MOTION SENSOR AT THE FOLLOWING DOORS: 162, 163, 164, 165, 170, 171, 172, 174,&181. RELOCATE EXIT MOTION SENSOR FROM 143.2 TO 196.1. (REFERENCE CONTRACTOR'S PROPOSAL P-45, ITEM #2) X0-9 LOCKS: AT HARDWARE SETS 10, 30 AND 34 PROVIDE CDX-09 LOCK IN LIEU OF MAS-09 LOCK. PROVIDE CREDIT FOR RETURNED LOCKS. (REFERENCE CONTRACTOR'S PROPOSAL P-45, ITEM #3) DOOR 143.2: PROVIDE INSTITUTION FUNCTION LATCH WITH ESCUTCHEON TRIM. ALSO PROVIDE CARD READER AT CORRIDOR SIDE OF DOOR.
Amount: $4,777
Award Description: RECOVERY: ARRA (NE0056ZZ) NORTH PLATTE ARRA INE00021 FEDERAL BUILDING 300 EAST 3RD STREET NORTH PLATTE, NE 69101-4000 (REFERENCE CONTRACTOR'S PROPOSAL P-47, ITEM #1) RE-PIPE THE THREE EXPANSION TANKS: RE-WORK THE PIPING FOR THE CONDENSING WATER EXPANSION TANKS IN THE BASEMENTS ACCORDING TO SKETCH M1 ATTACHED.
Amount: $3,011
Award Description: PS24 IS HEREBY ISSUED TO DEOBLIGATE ARRA FUNDS NOT REQUIRED IN THE EXECUTION OF THIS CONTRACT/PROJECT.
Amount: -$337
Award Description: INE00021 NORTH PLATTE ARRA DEOBLIGATE REMAINING ARRA FUNDS AND CREDIT FOR SYNC BELT CHANGES.

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 03
City HALL
County HALL
State NE
Zip 68802