| Other Awards |
Amount:
$32,000,000
Award Description: TAS::47 4543::TAS ADMINISTRATIVE MODIFICATION TO CORRECT OBLIGATION AMOUNT IN CONTRACT WRITING SYSTEM AND FPDS ACTION OBLIGATION FIELD. PROJECT IS CONSTRUCTION MANAGER AS CONSTRUCTOR, MODERNIZATION OF ROBERT SMITH VANCE FEDERAL BUILDING/COURTHOUSE, BIRMINGHAM, AL. |
Amount:
$0
Award Description: TAS::47 4543::TAS. CONSTRUCTION MANAGER AS CONSTRUCTOR FOR MODERNIZATION OF ROBERT SMITH VANCE FBCT |
Amount:
$1,114,216
Award Description: MODIFICATION TO ADD REQUIRED ARRA CLAUSES, INCREASE THE SCOPE AND THE CONTRACT GUARANTEED MAXIMUM PRICE. |
Amount:
$0
Award Description: TRANSFER CONTRACTING OFFICER RESPONSIBILITIES TO CHRISTOPHER BANKS |
Amount:
$0
Award Description: TRANSFERRING CONTRACTING OFFICERS RESPONSIBILITIES |
Amount:
$3,654,403
Award Description: THE SCOPE IS HEREBY INCREASED TO ADD NEW REQUIREMENTS THAT WERE NOT ADDRESSED IN THE 2005 PROGRAM DEVELOPMENT STUDY, MEET THE LATEST HIGH PERFORMANCE GREEN BUILDING STANDARDS AND THE AMERICAN WITH DISABILITY ACT ACCESSIBILITY GUIDELINES. |
Amount:
$34,941
Award Description: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE GEO TECHNICAL BORING AND SOIL TESTING. |
Amount:
$0
Award Description: MODIFICATION TO CONVERT BOILER PACKAGE TO FIRM FIXED PRICE |
Amount:
$681,057
Award Description: MODIFICATION TO ADD INSTALLATION OF 2 CHILLERS |
Amount:
$1,300,053
Award Description: MODIFICATION TO ADD ADDITIONAL WINDOW RESTORATION REQUIREMENTS FOR REPLACEMENT OF HISTORIC WINDOWS. |
Amount:
$265,000
Award Description: CHANGE ORDER FOR ADDITIONAL STRUCTURAL SERVICES. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION FOR COST TRANSFER. |
Amount:
$80,503
Award Description: MODIFICATION TO ADD ADDITIONAL TELECOMMUNICATIONS, ADA, JUDGES LIBRARY SHELVING MODIFICATIONS AND DOOR HARDWARE MODIFICATIONS FOR THE ROBERT S VANCE FB/CTHS, BIRMINGHAM, AL. |
Amount:
$0
Award Description: MODIFICATION TO INCORPORATE ADDITIONAL REMOVAL OF ACM, COURTROOM MOCKUP AND DEMOLITION OF CATWALK |
Amount:
$218,826
Award Description: AUTHORIZE DEMOLITION OF VAULT, MAIN EQUIPMENT ROOM RELOCATIONS AND STORM SEWER REVISIONS OF BELOW GRADE STORM SYSTEM. |
Amount:
-$42,631
Award Description: MODIFICATION FOR DELETION OF USMS, BASEMENT AND FIRST FLOOR CORRECTIONS, SUMP PUMP MODIFICATIONS. |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION TO CORRECT RWA FUNDING VERSUS ARRA FUNDING. |
Amount:
$0
Award Description: ASBESTOS CONTAING MATERIAL IN THE BASEMENT AND FIRST FLOOR OF THE ROBERT S VANCE FEDERAL BUILDING/COURTHOUSE, BIRMINGAM, AL |
Amount:
$194,144
Award Description: ADD HISTORIC COURTROOM AND WINDOW DELAY SERVICES TO THE ROBERT S VANCE CTHS/FB, BIRMINGHAM, AL |
Amount:
-$194,144
Award Description: ADMINISTRATIVE MODIFICATION TO CORRECT PS 12 PER BUDGET REQUEST. |
Amount:
$0
Award Description: VAULT DEMOLITION AND STORM SEWER REVISIONS |
Amount:
$0
Award Description: MODIFICATION IT INCORPORATE BUY AMERICA CLAUSES |
Amount:
$1,302,407
Award Description: A/V AND TELECOMMUNICATIONS SERVICES |
Amount:
$194,144
Award Description: ADMINISTRATIVE MODIFICATION TO CHARGE COURTS RWA FOR HISTORIC COURTROOM FOR THE ROBERT S VANCE FEDERAL BUILDING/COURTHOUSE, BIRMINGHAM, AL |
Amount:
-$8,260
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE SEAL OF PARTIAL LEAD FILLED JOINTS AND REMOVAL OF LEAD MATERIALS BEYOND CURRENT MASONRY RESTORATION SERVICES, ADDRESSING ABATEMENT OF ACM ROOFING MATERIALS NECESSARY FOR NEW ROOF SYSTEM AND ADDITIONAL MASONRY JOINTS TUCKPOINTED. |
Amount:
-$107,429
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. THIS MODIFICATION IS HEREBY ISSUED TO:
1. DE-OBLIGATE ALL REMAINING FUNDS ON CONTRACT LINE ITEM NUMBER 0011A - WINDOW ALLOWANCE. THE TOTAL DEDUCTION IS (-)$61,238.00.
2. CORRECT THE LINE ITEM TOTAL FOR 0011A ON MODIFICATION PS 20 FROM $774,809 TO $648,549.00. TOTAL REDUCTION OF 0011A IS $126,260.00 INSTEAD OF $80,068.92.
3. CORRECT MODIFICATION PS 20 - CHILLER REPLACEMENT - CHANGE MODIFICATION LINE ITEM FROM CLIN 0115 TO CLIN 0029. THE INCORRECT LINE ITEM WAS LISTED ON PS 20 THEREFORE THIS MODIFICATION CORRECTS TO THE APPROPRIATE LINE NUMBER. THE NEW TOTAL OF CLIN 0115 IS $0 AND CLIN 0029 $634,866 FIRM FIXED PRICE. TOTAL CREDIT TO GSA IS (-) $46,191.08. THE CORRECT GMP FOR PS 20 IS $40,676,224.92. |
Amount:
$625,738
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE FIRST AND FOURTH FLOOR FRAMING REPAIRS, DEMOLITION OF BASEMENT WALL(S) AND ROOF MATERIALS ON LOW ROOF. TIME EXTENSION. |
Amount:
$412,638
Award Description: IG:OT:IGF
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND ANY OTHER SERVICES NECESSARY FOR THIS PROJECT, VANCE FEDERAL BUILDING, BIRMINGHAM, AL. |
Amount:
$109,704
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE REVISED ROUGH-IN LOCATIONS OF THE CONDUIT SYSTEM INCLUDING DEVICE OUTLET BOXES. |
Amount:
$31,104
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE PLUMBING DRAWING, BUILT OUT SQUARE FOOTAGE (3RD FL)AND HVAC DUCTWORK SYSTEM REVISIONS. ALSO INCLUDING INSTALLATION FOR THE CARPETING AND WALL FINISHES. |
Amount:
$278,313
Award Description: RECOVERY:
OT - UNFORESEEN SITE CONDITIONS FOR THE ROBERT S VANCE FB/CTHS |
Amount:
$248,042
Award Description: RECOVERY: PN9D01899
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA.
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND ANY OTHER SERVICES NECESSARY |
Amount:
$120,931
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE RAISED SLAB AND GENERATOR COOLING TOWER REVISIONS. |
Amount:
$76,337
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
ROBERT SMITH VANCE FBCT, BIRMINGHAM, AL
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE RAISED SLAB AND GENERATOR COOLING TOWER REVISIONS. |
Amount:
$457,000
Award Description: RECOVERY: PN9D01899 - OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA. SERVICES INCLUDE RAISED SLAB REVISIONS AND REPAIRS TO THE EXISTING EXTERIOR AND INTERIOR WALLS. |
Amount:
$79,693
Award Description: RECOVERY: PN9D01899 OT (OTHER FUNCTIONS)
MODIFICATION FOR RENOVATION OF THE ROBERT S VANCE FB-CTHS, BIRMINGHAM, AL - ARRA.
THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND ANY OTHER SERVICES NECESSARY |
Amount:
$0
Award Description: ADMINISTRATIVE MODIFICATION REQUESTED PER BUDGET TO ADEQUATELY PROCESS UPWARD ADJUSTMENT OF MODIFICATION PS 20. |