Skip to content Skip to footer site map
Navigate Up

Recovery.gov - Track the Money

Recovery.gov is the U.S. government's official website that provides easy access to data
related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse.

contract- RECIPIENT AWARD SUMMARY

LUHR BROS., INC.

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: US Army Corps of Engineers Project Location: SHELBY
Award Number: W912EQ10C0036 Project Location - State: TN
Funding Amount: -$54,823 Project Location - Zip Code: 381031816
Ending Date: 2011-03-18 Congressional District: 09

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: LUHR BROS., INC.
Recipient Address: 250 W SAND BANK RD
Recipient City: COLUMBIA
Recipient State: IL
Recipient Zip Code: 622361044
Congressional District: IL-12

DESCRIPTION OF WORK/SERVICE PERFORMED

TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE CONTRACT IS FOR STONE DIKE CONSTRUCTION AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER BETWEEN MILES 954.0 AHP TO 599.0 AHP. THIS MODIFICATION IS TO REVISE THE ESTIMATED QUANTITIES TO REFLECT ANTICIPATED QUANTITIES TO BE USED. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. THIS ACTION WILL FULLY OBLIGATE THIS CONTRACT.






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $105,301
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# TAINTER GATES 14-17 SEALED PRIOR TO WORK AT PIER 16 AND 17 CLIN 0001, SEALING GATES 14-17 FOR DIVER PROTECTION PART 1-A CLIN 0002 FOR TASK ORDER 0003 MODIFICATION 02. ARRA FUNDING.
Amount: $82,675
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::146348::RP# PLACING CRUSHED STONE BEDDING MATERIAL AND MODIFIED GARDED STONE C FOR SCOUR REPAIR LOCATED AT LOCK AND DAM 25, WINFIELD, MISSOURI.
Amount: $2,793,575
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::146348::RP# PLACING CRUSHED STONE BEDDING MATERIAL AND MODIFIED GARDED STONE C FOR SCOUR REPAIR LOCATED AT LOCK AND DAM 25, WINFIELD, MISSOURI. ARRA::YES::ARRA
Amount: $1,583,000
Award Description: TAS::96 3135::TAS ADDITIONAL DREDGING FOR LIVINGSTON AND CUMBERLAND ISLANDS, OHIO RIVER, MAINTENANCE DREDGING OF THE OHIO RIVER, TRIBUTARIES, AND UPPER MISSISSIPPI RIVER (RM 0.0 -195.0) FOR THE LOUISVILLE DISTRICT, U.S. ARMY CORPS OF ENGINEERS
Amount: $0
Award Description: TAS::96 3135::TAS (NO ARRA OBLIGATION ON BASE AWARD) MAINTENANCE DREDGING OF THE OHIO RIVER, TRIBUTARIES, AND UPPER MISSISSIPPI RIVER (RM 0.0 -195.0) FOR THE LOUISVILLE DISTRICT, U.S. ARMY CORPS OF ENGINEERS
Amount: $0
Award Description: TAS::96 3135::TAS ADD ARRA CLIN AND ARRA CLAUSES, MAINTENANCE DREDGING OF THE OHIO RIVER, TRIBUTARIES, AND UPPER MISSISSIPPI RIVER (RM 0.0 -195.0) FOR THE LOUISVILLE DISTRICT, U.S. ARMY CORPS OF ENGINEERS
Amount: $0
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE CONTRACT IS FOR STONE DIKE CONSTRUCTION AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER BETWEEN MILES 954.0 AHP TO 599.0 AHP.
Amount: $4,178,595
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# PROJECT TITLE: DIKE CONSTRUCTION AT VARIOUS POINTS ALONG THE MISSISSIPPI RIVER. STONE DIKE CONSTRUCTION AT VARIOUS POINTS ALONG THE MISSISSIPPI RIVER INCLUDING AT FRIARS POINT, LOOSAHATCHIE, ROBINSON, AND COW ISLAND. ALSO INCLUDED ARE CORRECTIONS TO DEFICIENCIES DUE TO NEEDED REPAIRS.
Amount: $527,391
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#::W912EQ-10-D-0006::RP# THIS MATOC TASK ORDER IS FOR BEND OF ISLAND 25 BENDWAY WEIRS, BEND OF ISLAND 25, LAUDERDALE COUNTY, TN. THIS MODIFICATION IS TO REVISE ESTIMATED QUANTITIES TO REFLECT ACTUAL QUANTITIES USED. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. THIS ACTION WILL FULLY OBLIGATE THIS CONTRACT. THIS CHANGE IS REFERRED TO AS CA001.
Amount: $3,968,775
Award Description: TAS::96 3113::TAS RECOVERYPROJECT#107046::RP THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR AND MATERIALS FOR CONSTRUCTING BEND OF ISLAND 25 BENDWAY WEIR NOS. 1-6 BY PLACING GRADED STONE A AS WELL AS INCIDENTAL RELATED WORK. 250 LB RIPRAP PAVING WILL BE PLACED ON THE BANK AT EACH WEIR LOCATION.
Amount: $69,220
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# SEALING GATES 4 -10 DIVER PROTECTION ARRA TASK ORDER 0003 AT LOCK AND DAM 25.
Amount: $94,030
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# SCOUR REPAIR, LOCK & DAM 25 SUSPENSION OF WORK, DUE TO GATE REPAIR, ARRA TASK ORDER 0001.
Amount: -$28
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# SCOUR REPAIR LOCK & DAM 25
Amount: $600,648
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# ADDITIONAL QUANITIES OF STONE WAS ADDED DUE TO RIVER ELEVATIONS ON SCOUR REPAIR, LOCK & DAM 25.
Amount: -$69,253
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# ESTIMATED QUANITIES WERE THOUGHT TO BE USE, MISSION CHANGED ON SCOUR REPAIR, LOCK & DAM 25
Amount: $282,000
Award Description: TAS::96 3134::TAS ARRA::YES::ARRA TOWBOAT RENTAL WITH OPERATING PERSONNEL
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA ADDITIONAL DREDGING REQUIRED DUE TO LOW WATER CONDITIONS, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE, OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER, MILES 0.0-195.0 (NO ARRA FUNDS OBLIGATED)
Amount: -$13,642
Award Description: TAS::96 3135::TAS DECREASE OBLIGATED FUNDS DUE TO LOWER ESTIMATED QUANTITIES, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE DREDGING, OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER, MILES 0.0 - 195.0 ARRA::YES::ARRA
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INCREASED DREDGING REQUIRED DURING PERFORMANCE PERIOD, LEASE OF DREDGE, ATTENDANT PLANT AND ONSHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE OF THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER MILES 0.0-195.0 (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS DECREASE FUNDED AMOUNT ON NON-ARRA CLINS TO REFLECT LOWER ESTIMATED QUANTITIES DUE TO REDUCED NUMBER OF DREDGINGS REQUIRED, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE OF OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER
Amount: $123,000
Award Description: TAS::96 3135::TAS ADMINISTRATIVE MODIFICATION TO CHANGE FUNDING BASED ON MONEY PROVIDED FROM HUNTINGTON DISTRICT REPLACING MONEY FROM LOUISVILLE DISTRICT, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT OF CHANNEL MAINTENANCE DREDGING FOR THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA ADDITIONAL DREDGING REQUIRED FOR OPTION YEAR 1, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE OF OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE CONTRACT IS FOR STONE DIKE CONSTRUCTION AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER BETWEEN MILES 954.0 AHP TO 599.0 AHP. THIS ADMINISTRATIVE MODIFICATION SERVES TO REPLACE DRAWINGS 003B, 004B, 005B, 015B, 0016B, AND 0017B WITH REVISED DRAWINGS 0003C, 0004C, 0005C, 0015C, 0016C, AND 0017C RESPECTIVELY. THE REVISED DRAWINGS PROVIDE MORE RECENT GROUND PROFILE DATA AND ADJUST THE LIMITS OF THE STONE APRON FOR THE CHEVRONS BUT DO NOT ALTER THE METHOD OR MANNER IN WHICH TO PERFORM THE WORK. THIS MODIFICATION ALSO REVISES THE ESTIMATED QUANTITY FOR CLIN 0001AS TO THE BEST ESTIMATE OF THE FINAL QUANTITY TO BE USED.
Amount: $0
Award Description: TAS::96 3134::TAS RECOVERYPROJECT#::146348::RP# TAINTER GATES 14-17 SEALED PRIOR TO WORK AT PIER 16 AND 17 CLIN 0001, SEALING GATES 14-17 FOR DIVER PROTECTION PART 1-A CLIN 0002 FOR TASK ORDER 0003 MODIFICATION 02. ARRA FUNDING.
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA EXERCISE OPTION YEAR TWO, LEASE DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE OF OHIO RIVER AND TRIBUTARIES, AND UPPER MISSISSIPPI RIVER RM 0.0 - 195.0
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA ADDITIONAL DREDGING FOR OPTION YEAR TWO, FUNDING PROVIDED BY HUNTINGTON DISTRICT, USACE, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE OF THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER MILES 0.0 TO 195.0 (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA ADDITIONAL DREDGING REQUIRED FOR OPTION YEAR 2, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE DREDGING OF THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER, MILES 0.0 TO 195.0 (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA DECREASE CONTRACT AMOUNT DUE TO CHANGE IN ESTIMATED QUANTITIES FOR DREDGING, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL FACILITIES FOR CHANNEL MAINTENANCE, OHIO RIVER AND TRIBUTARIES, AND UPPER MISSISSIPPI RIVER (RM 0.0 TO 195.0) - NO CHANGE IN ARRA FUNDING
Amount: $0
Award Description: TAS::96 3135::TAS RECOVERYPROJECT#::146348::RP# PLACING CRUSHED STONE BEDDING MATERIAL AND MODIFIED GARDED STONE C FOR SCOUR REPAIR LOCATED AT LOCK AND DAM 25, WINFIELD, MISSOURI.
Amount: -$54,823
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE CONTRACT IS FOR STONE DIKE CONSTRUCTION AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER BETWEEN MILES 954.0 AHP TO 599.0 AHP. THIS MODIFICATION IS TO REVISE THE ESTIMATED QUANTITIES TO REFLECT ANTICIPATED QUANTITIES TO BE USED. THIS MODIFICATION IS FOR FUNDING AND PAYMENT PURPOSES ONLY AND DOES NOT CHANGE THE SUBSTANTIVE RIGHTS OF THE CONTRACTING PARTIES. THIS ACTION WILL FULLY OBLIGATE THIS CONTRACT.
Amount: $0
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::107046::RP# THE CONTRACT IS FOR STONE DIKE CONSTRUCTION AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER BETWEEN MILES 954.0 AHP TO 599.0 AHP. THIS ADMINISTRATIVE MODIFICATION SERVES TO REPLACE DRAWINGS 003B, 004B, 005B, 015B, 0016B, AND 0017B WITH REVISED DRAWINGS 0003C, 0004C, 0005C, 0015C, 0016C, AND 0017C RESPECTIVELY. THE REVISED DRAWINGS PROVIDE MORE RECENT GROUND PROFILE DATA AND ADJUST THE LIMITS OF THE STONE APRON FOR THE CHEVRONS BUT DO NOT ALTER THE METHOD OR MANNER IN WHICH TO PERFORM THE WORK. THIS MODIFICATION ALSO REVISES THE ESTIMATED QUANTITY FOR CLIN 0001AS TO THE BEST ESTIMATE OF THE FINAL QUANTITY TO BE USED. THIS MODIFICATION SERVES TO INCREASE THE TIME SPECIFIED FOR COMPLETION DUE TO ADVERSE RIVER STAGES. THE CONTRACT TIME HAS INCREASED 386 CALENDAR DAYS FROM 174 CALENDAR DAYS TO 560 CALENDAR DAYS. THE DATE ESTABLISHED FOR COMPLETION OF THE CONTRACT WORK IS EXTENDED FROM MARCH 16, 2011 TO APRIL 4, 2012 FOR EXCUSABLE DELAYS OCCURRING FROM NOVEMBER 15, 2010 THROUGH DECEMBER 10, 2011. THIS CHANGE IS REFERRED TO AS CA004.
Amount: $0
Award Description: TAS::96 3113::TAS ARRA::YES::ARRA RECOVERYPROJECT#::RP DIKE CONSTRUCTION (REPAIR OF BAR DIKE NO.4 AND CHEVRON NO. 1, SHELBY COUNTY, TN, THIS MODIFICATION REFLECTS THE AGREEMENT MADE FOR A CREDIT TO LINE ITEM 0001AQ: (REPAIR OF BAR DIKE 4 AND BAR CHEVRON NO. 1), WHICH REQUIRED THE GRADING OF 1200 TON OF STONE PLACED ABOVE GRADE BY A PREVIOUS CONTRACTOR. THE WORK COULD NOT BE PERFORMED BECAUSE OF EXCESSIVE SANDING OVER THE DIKE. THEREFORE IT WAS NECESSARY TO NEGOTIATE A CREDIT FOR WORK NOT PERFORMED. IT IS UNDERSTOOD AND AGREED THAT THE ADJUSTMENTS INCLUDED IN THIS MODIFICATION CONSTITUTE COMPENSATION IN FULL, ON BEHALF OF THE CONTRACTOR, AND ITS SUBCONTRACTORS AND SUPPLIERS, FOR ALL COSTS AND MARKUPS, DIRECTLY ATTRIBUTABLE TO THIS CHANGE ITEM, FOR ALL DELAYS AND IMPACTS RELATED THERETO, AND FOR PERFORMANCE OF THE MODIFIED CONTRACT WORK WITHIN THE TIME FRAME STATED. THIS CHANGE IS REFERRED TO AS CA003.
Amount: $0
Award Description: TAS::96 3122::TAS ARRA::YES::ARRA ARRA FUNDED ACTIONS TO INCREASE CAPACITY ON LEASE DREDGE, ATTENDANT PLANT, AND ON SHORE DISPOSAL EQUIPMENT OF CHANNEL MAINTENANCE DREDGING FOR THE OHIO RIVER AND TRIBUTARIES, AND/OR UPPER MISSISSIPPI RIVER.
Amount: -$125
Award Description: SCOUR REPAIR LOCK&DAM 25
Amount: -$35
Award Description: ARRA TASK ORDER 0002
Amount: -$1
Award Description: ARRA TASK ORDER 0002
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA DECREASE IN CONTRACT AMOUNT DUE TO CHANGE IN ESTIMATED DREDGING QUANTITIES, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE OF THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER, RM 0.0 TO 195.0 (NO ARRA FUNDS OBLIGATED OR DEOBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INCREASE EFFECTIVE AND NON-EFFECTIVE TIME FLR LEASE AND OPERATION OF DREDGE AND ATTENDANT PLANT AND INCREASE DISTANCE MOVED, PART 1 NOTICE TO PROCEED, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE DREDGING, OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER, RM 0.0-195.0 (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA INCREASE IN DREDGING FOR OPTION YEAR 3, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE DREDGING OF THE OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER MILES 0.0-195.0 (NO ARRA FUNDS OBLIGATED)
Amount: $0
Award Description: TAS::96 3135::TAS ARRA::YES::ARRA EXERCISE OPTION YEAR TWO, LEASE OF DREDGE, ATTENDANT PLANT AND ON-SHORE DISPOSAL EQUIPMENT FOR CHANNEL MAINTENANCE DREDGING OF OHIO RIVER AND TRIBUTARIES AND UPPER MISSISSIPPI RIVER RM 0.0 TO 195.0 (NO ARRA FUNDS OBLIGATED)

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 09
City SHELBY
County SHELBY
State TN
Zip 38103